Preliminary Design Review 1 Team Members: Chris Douglas – Project Manager David Hooker – Lead Research, Webmaster James Randall – Liaison, Budget Manager.

Slides:



Advertisements
Similar presentations
1 Washington, Oct. 2nd 2013 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
Advertisements

Automotive Batteries.
EET Electronics Survey Chapter 17 - Batteries.
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
ERIC VANDENBURG, SPENCER HOMAN, TREVOR LARSON and NIK URLAUB Team website: / 1.
Applications of Wireless Sensor Networks in Smart Grid Presented by Zhongming Zheng.
TI Confidential – Selective Disclosure BMS Deep Dive Battery Charger Design (1S): Key considerations and system design limitations Miguel Aguirre.
Federal Aviation Administration 0 Intermixing of Cells in Nickel-Cadmium Batteries for Aircraft Usage May 11, Intermixing of Cells in Nickel-Cadmium.
LSV2 Charger Remote Control Design Team: (from the left) Branden Carpenter Wayne Romine Jon Stoker Dr. Hess (Advisor) Maggie Richardson Dr. Donohoe (Advisor)
The Effects of Plug-in Electric Vehicles on a Sample Grid Team Members: Jeff Eggebraaten Brendin Johnson Anne Mousseau Justin Schlee 1.
By: Matt Luedeman, Peter Wells, Chris Dyke Advisor: Jay McCormack Clients: Dr. Karl Rink Dr. Gabriel Potirniche Dr. Akira Tokuhiro 1.
Members: Tim Blake, Travis McMillen, David Bankhead.
Super-capacitors Vs. Capacitors  No conventional dielectric  Two layers of the same substrate, result in the effective separation of charge  Lack of.
Team Name: Team Members: Branden CarpenterEESenior Jon StokerCSSenior Maggie RichardsonEESenior Wayne RomineEESenior Project Title: LSV2 (Large Scale Vehicle)
Team Members: Justin Schlee Brendin Johnson Jeff Eggebraaten Anne Mousseau Preliminary Design Review.
Team Shock Therapy Team members: Tim BlakeEE Senior Travis McMillenEE Senior David BankheadEE Senior Advisors: Greg Donohoe Herb Hess Jim Klein.
ERIC VANDENBURG, SPENCER HOMAN, TREVOR LARSON and NIK URLAUB Team website: / 1.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
Chapter 2 Succeeding as a Systems Analyst
BATTERIES SPECIFICATIONS. Batteries Batteries are electrochemical cells. A chemical reaction inside the battery produces a voltage between two terminals.
CBC Automotive n Operation n Service n Diagnosis Battery.
1 ONR HEV HMMWV Team Assault and Battery Team Members: Linnea Anderson, Bryan Blakley, Matthew Braley, Danny George, Slade Klein, Chad Schierman, Matt.
NORMILIZATION AND CONDITIONING OF NICKEL METAL HYDRRIDE BATTERIES By Chris Harrison.
1 © Alexis Kwasinski, 2012 Energy Storage Distributed resources (DR) and distributed generation (DG): DG can be defined as “a subset of DR” [ T. Ackermann,
TelosB Charging and Energy Meter Kit(Dec1201) Group Leader: Tomas Mullins Communicator: Casey Liebl Webmaster: Shiya Liu Team Members: Andrew Gurik & Qiao.
Energy Harvesting and Wireless Sensor Networks Adam Skelton.
Freedom Combi Inverter
Battery Technology November, range: function of energy density of the battery. Compare 12,000 (theo.) / 2600 Wh/kg with the lead-acid.
Batteries Specifications Estimating when they will be fully discharged.
National Highway Traffic Safety Administration U.S. Proposal on BMS Functionality-In Use Brian T. Park Safety Engineer.
FOOD ENGINEERING DESIGN AND ECONOMICS
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
Server Virtualization: Navy Network Operations Centers
02/06/031 State of the Art Battery Charger Team: Richard Musumhi Bo Bo Oo Pascal Openshaw Chris Privitere Client: Senior Design 2/6/2003 Team May
Direct Current And Resistance Electric Current The Battery Resistance And Ohm’s Law Power Internal Resistance Resistors In Combination RC Circuits Written.
ENERGY INSTITUTE Battery Research Group NiMH Battery Pack for HEV Cem Kaypmaz 2008 İstanbul.
Chapter 18 Electric Currents The Electric Battery Volta discovered that electricity could be created if dissimilar metals were connected by a conductive.
An introduction to A Novel Cell Equalizer Topology for Plug-In Hybrid Electric Vehicle Energy Storage System Kun Zhuge
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
ASTEP Life in the AtacamaCarnegie Mellon Limits of Life in the Atacama: Investigation of Life in the Atacama Desert of Chile Power System Design James.
Team Shock Therapy: Tim Blake, David Bankhead, Travis McMillen 1.
Solar Cell Stability – May12-09 ABSTRACT Solar cell research is a major emphasis of Iowa State University. Improving the efficiency of solar cells can.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
1 Washington, Sept 29th, 2014 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
Optimization of PHEV/EV Battery Charging Lawrence Wang CURENT YSP Presentations RM :00-11:25 1.
IT Infrastructure for Providing Energy-as-a-Service to Electric Vehicles Smruti R. Sarangi, Partha Dutta, and Komal Jalan IEEE TRANSACTIONS ON SMART GRID,
Project Management Methodology Development Stage.
Computational Sprinting on a Real System: Preliminary Results Arun Raghavan *, Marios Papaefthymiou +, Kevin P. Pipe +#, Thomas F. Wenisch +, Milo M. K.
Design Solutions Sponsored by: National Science Foundation Advisors: Abdullah Eroglu, Hosni Abu-Mulaweh, Hossein Oloomi Team Members: Mitchell Eilerman,
CBC Automotive n Operation n Service n Diagnosis Battery.
| nectar.org.au NECTAR TRAINING Module 4 From PC To Cloud or HPC.
Mid Semester Presentation. Team Members Chapman, Jonathan Duties: Recharging Circuit Major: Electrical Engineering Dang, Quoc Duties: Power Circuit, Website.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Electric Cells Section 5.3 (p. 217 – 226). (chemical) Cells i.e. batteries Direct current (DC) devices Electron flow = leave negative side, re-enter positive.
Mid Semester Presentation February 24, Team Members Chapman, Jonathan Duties: Recharging Major: Electrical Engineering Dang, Quoc Duties: Cell Monitoring.
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
Battery Models. EMF and voltage What is EMF? – Electro Motive Force What is the difference between EMF and battery voltage? – The battery has internal.
Adaptable Approach to Estimating Thermal Effects in a Data Center Environment Corby Ziesman IMPACT Lab Arizona State University.
Battery Models. EMF and voltage What is EMF? – Electro Motive Force What is the difference between EMF and battery voltage? – The battery has internal.
Slide 1 Software Construction Software Construction Lecture 3.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Chapter 18 Electric Currents. Units of Chapter 18 The Electric Battery Electric Current Ohm’s Law: Resistance and Resistors Resistivity Electric Power.
Process Economics Factors that affect profitability
Prepared by T Vigneshkumar S Vijayakumar
ELECTRICAL QUANTITIES IN CIRCUITS
Lithium Operating Issues in a Stationary Environment
Optimization of PHEV/EV Battery Charging
2500 R Midtown Sacramento Municipal Utility District
Sealed lead grid technologies
Presentation transcript:

Preliminary Design Review 1 Team Members: Chris Douglas – Project Manager David Hooker – Lead Research, Webmaster James Randall – Liaison, Budget Manager Sponsors: Naval Surface Warfare Center: Acoustic Research Detachment, Bayview ID Advisor: Dr. Gregory Donohoe, University of Idaho Mentor: Dr. Herbert Hess, University of Idaho

 Problem Statement, Specifications, Deliverables  Current System, Situation  Design Concepts  Trade Study  Equipment  Return on Investment  Timeline/Future Work  Challenges 2

 The Large Scale Vehicle 2 (LSV2) is an autonomous electric submarine used to study acoustic properties of propulsion systems. The Acoustic Research Detachment 3 (ARD) has requested improvement of capacity retention over the course of the propulsion batteries life cycle.

 Document current charging configuration with scheme advantages and disadvantages  Research of potential changes to system to extend capacity retention  Develop a cost-benefit analysis of implementing a new charging scheme  Produce computer simulations of current and alternate configurations  Construct lab scaled model of current and alternate schemes 4

 Current System Report  Trade Study  Selected Choices Summary  Overview of Rejected Proposals  Cost-Benefit Report  Lab Test Report  Proof of Safety Report  Computer Simulation 5

6 1. CC(45A/string) until 2.35V/cell 2. CV until 6.25A/string 3. CC for 3 hours with 2.50V/cell voltage limit2.50V/cell voltage limit Main Charge Overcharge  V batteries divided into 4 parallel strings  Approximately 15min checks  Batteries 4 years(approx. 80% capacity)

 Human charge control can lead to undercharge or overcharge Both OC and UC can lead to battery life degradation  Charging infrastructure maxed Chargers working at max current wiring from chargers to sub at max current Power grid already overloaded  Aux. battery charge ~ 12 hours  Two types of chargers readily available 7

 Extend useful life of batteries Reduce expenses over long term Reduce submarine downtime over long term resulting in higher return for taxpayer dollars  Reduce the capacity loss of batteries over current service life Maintain underway duration over service life 8

 Automate System Free up technicians for other purposes Reduce risk of error of human control  Improve Oxygen recombination efficiency(ORE) Reduce outgassing Decrease energy waste 9

 Zero Delta Voltage (ZDV) Concept  Max current charges until 70% return of charge  Constant Current (C/5) until ZDV is reached  ZDV is defined as a limit in change in voltage between two readings  A reading is defined as 30 second averages of voltage readings 10 ΔVoltage

Pros  Accurately detects end of charge cycle  Reduces human error during charge cycle  Reduces possibility of detrimental undercharge/overcharge  Possible 100% increase of battery life Cons  Will need to be tested on multiple battery system  Variable voltage termination limit over life of batteries 11

 Current Interrupt (CI) Concept  Used after primary charge has completed (overcharge)  Charge algorithm consists of a pulsed current  CI is employed until 10% overcharge has been achieved 12...

Pros  Allows cooling period for batteries preventing excessive thermal degradation  Allows for chemical reactions to stabilize during the off period leading to higher ORE  Can be used independently of main charge method Cons  Unknown change in charge time  Setup of system may be complex  Normally employed after a fast charge algorithm has delivered 100% of depleted charge 13

 Fast Charging Start with large current pulses (up to 4C) Monitor voltage and step down current each time voltage limit is reached 14

15  Pros Is an extremely fast charge method Increases capacity retention throughout life  Cons Requires enormous amounts of current (up to 600A) Generates large amounts of heat

16 ItemMethodWeight CI/CVZDVCIFC Cat Caps Software Complexity % Power Requirements % Shore Power Considerations % Rewiring of both Barge and Vessel % Difficulty of Implementation % Charge available for Underway % Expected EOL Capacity % External Interfacing of Controls?????8% Reduction in Charge time?????1% Cost of Implementation?????5% Long term Costs reduction?????25% Higher score is better % 39%

 CI and ZDV require testing  Charge module capabilities unknown  Testing is required to determine charge time  Long term effects to be determined 17

18

 Software capable of accurately simulating cycle life has yet to be discovered  State of health simulation is unfeasible at this time due to: Varying discharge rates during each test run Varying internal characteristics and chemical composition over battery life Varying and unknown cell temperatures for charge and discharge cycles  Development contingent upon lab data 19

20 ItemDescriptionQty Base Cost Total BatteriesNew LSV2 battery (2025 Lead) 6 $ $2, Charge/Discharge System Arbin BT2000 / AeroVironment ABC- 150 or ABC-5 1 PENDING Catalyst CapsOxygen Recombination Catalyst 3 $35.00 $ Total PENDING

CONTINUED USE OF SYSTEM BENEFITS OF NEW SYSTEM  $593,000/4 years for Main battery replacement  Labor costs of replacement process  Extending battery service life by at least 50% yields savings of $50,000/year (not including man hours)  Length of underways can be maintained over longer period of time yielding more data collected per run 21

 State of health simulations non-existent  Time constraints for cycle life testing  Managing multiple test cases  Access to charger control module  Access to /Purchase of testing equipment 22

 Schedule with design of charge/discharge system  Alternative budget to be determined 23

24