Fast Detector Readout T. Flick University Wuppertal 3. Detector Workshop of the Helmholtz Alliance "Physics at the Terascale" Heidelberg 2010.

Slides:



Advertisements
Similar presentations
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
Advertisements

E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
*Supported by the EU FP7-PEOPLE-2012-ITN project nr , INFIERI, "Intelligent Fast Interconnected and Efficient Devices for Frontier Exploitation in.
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
LHCb DAQ Review, September LHCb Timing and Fast Control System TFC Team: Arek Chlopik, Warsaw Zbigniew Guzik, Warsaw Richard Jacobsson, CERN Beat.
Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe.
IEEE08/NSS R. Kass N Radiation-Hard/High-Speed Data Transmission Using Optical Links W. Fernando, K.K. Gan, A. Law, H.P. Kagan, R.D. Kass, J. Moore,
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
ATLAS Pixel Upgrade Phase 0 (IBL) ACES Workshop , CERN T. Flick University Wuppertal for the IBL collaboration.
Uni-Heidelberg, KIP, V.Angelov 1 International Workshop TRDs – Present & Future September, Romania Wafer Tester, Optical Link, GTU V. Angelov Kirchhoff.
Trigger A front end chip for SLHC CMS strip tracker IN2P3 microelectronic Summer School Frejus, June 2011  Concept of Silicon strip Pt-module.
TRBnet for the CBM MVD-Prototype Borislav Milanović In cooperation with: J. Michel, M. Deveaux, S. Seddiki, M. Traxler, S. Youcef, C. Schrader, I. Fröhlich,
GBT Interface Card for a Linux Computer Carson Teale 1.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
Design and Performance of a PCI Interface with four 2 Gbit/s Serial Optical Links Stefan Haas, Markus Joos CERN Wieslaw Iwanski Henryk Niewodnicznski Institute.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
Design studies of a low power serial data link for a possible upgrade of the CMS pixel detector Beat Meier, Paul Scherrer Institut PSI TWEPP 2008.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Optical telecommunication networks.  Introduction  Multiplexing  Optical Multiplexing  Components of Optical Mux  Application  Advantages  Shortcomings/Future.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
LHCb front-end electronics and its interface to the DAQ.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
1 The Link-On-Chip (LOC) Project at SMU 1.Overview. 2.Status 3.Current work on LOCs6. 4.Plan and summary Jingbo Ye Department of Physics SMU Dallas, Texas.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Legou-Dinkespiler VLVnT worshop Nikhef October 03 CWDM data transmission for the VLVnT  Context and assumptions 1)A VLVnT with ~ 10 K PMT 2)High agregate.
Adam Marmbrant Samuel Silverstein Stockholm University Link Test Status.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
Dirk Wiedner 16 th February OT/ITCALO MUON RICH1/TT RICH2 +TFC system.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
Update on Optical Fibre issues Rainer Schwemmer. Key figures Minimum required bandwidth: 32 Tbit/s –# of 100 Gigabit/s links > 320, # of 40 Gigabit/s.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Performance characteristics of COTS 10Gb/s Optical Links for SLHC Experiments Jan Troska, Markus Axer, Karl Gill, Robert Grabit, Raquel Macias Jareno,
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Optical Communications for Future Trackers ANL/FNAL/UC/VWS Meeting Nov., 2011 Alan Prosser CD/ESE Fermilab 1.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Mu3e Data Acquisition Ideas Dirk Wiedner July /5/20121Dirk Wiedner Mu3e meeting Zurich.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
DAQ read out system Status Report
L1Calo upgrade discussion
Totem Readout using the SRS
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Old ROD + new BOC design plans
TTC system for FP420 reference timing?
Long-Distance Communication (Carriers, Modulation, And Modems)
W. Ali, R. Corsini, E. Ciaramella SSSA Pisa Italy
Optical links in the 25ns test beam
The CMS Tracking Readout and Front End Driver Testing
New DCM, FEMDCM DCM jobs DCM upgrade path
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Fast Detector Readout T. Flick University Wuppertal 3. Detector Workshop of the Helmholtz Alliance "Physics at the Terascale" Heidelberg 2010

Overview Detector readout constraints and strategies Main concepts nowadays Limits to tackle Future ideas and possibilities Summary Fast Detector Readout - T. Flick

Readout Constraints The current particle physics experiments record enormous quantities of data. Accelerators serve very high event density (LHC aim: 40 MHz collision rate, O(20) events /bunch crossing, O(1000) tracks to be recorded) The future development aims for even higher rates or beam intensity to provide more data within a shorter time at even higher energies. Fast tracking will become more and more important for trigger decisions. BUT: Data which is not read out is lost and therefore useless Therefore the readout system must be fast and reliable To be used even in the innermost sub-detector of big detector system it also must be designed as low mass and low power devices and to be radiation hard Since the readout channels are many the communications channels are very dense: Avoid cross talk Fast Detector Readout - T. Flick

Concepts in Use The standard readout system are today Optical links Array based or single channel Different wavelength and components possible 850 nm nm single mode or multi mode transmission Different bandwidths due to detector types Few ten Mb/s up to several Gb/s Commercial / self made devices Radiation tolerance Power and material budget Fast Detector Readout - T. Flick Off.Det. Readout Electonics RX

Limits to tackle Maximal data rate Usable bandwidth Contingency for peak data rates Overhead for encoding schemes or error checking Space limits Not much space in the innermost parts of detectors Redundancy Technology limits Power consumption Radiation hardness Mass Modularities Data transmission channels per readout device vs. serialisers and multiplexers Fast Detector Readout - T. Flick Typical space situation inside the detector

Next Readout Generations Situation today: High bandwidth (Gb/s) links, very few radiation hard components Telecommunication around 60 Gb/s already Lower bandwidth O(100 Mb/s) is radiation tolerant Next developments under test or design will reach a 5-10 Gb/s data transmission bandwidth (even in radiation hard designs) Several R&D projects are under investigation spread all over the world GBT / versatile link (CERN + several groups worldwide) Modulated light signals (i.e. ideas at NIKHEF) Wireless readout (i.e. Upsalla University) Fast Detector Readout - T. Flick

GBT / Versatile Link Idea GBT: Provide at common receiver / driver for on- and off-detector usage for as many experiments as possible. 4.8 Gb/s electrical implementation for a TTC and data link 3.2 Gb/s usable bandwidth for data Rest for error checking, encoding, … Consists of trigger link, DAQ link and slow control link Custom made chip set on detector side, FPGA based implementation off-detector Fast Detector Readout - T. Flick

GBT / Versatile Link Idea Versatile Link: Provide a fast and radiation hard optical for as many experiments as possible Studies for radiation hardness for all components underway To qualify up to the inner tracker levels 850nm and 1310nm versions Commercial opto components with custom drivers and packaging Fast Detector Readout - T. Flick 8

Modulated Light For transmission over long distances with high bandwidth (~40 Gb/s) the lasers are not switched anymore. Light signal is externally modulated (switched) Switchers (pockets cells) must be fast, small, radiation hard. First proposals are around to use it in physics detectors on-detector modulators are on top of the laser driver  more components as in the standard design. Low mass and power needs more study. Encyclopedia of Laser Physics and Technolo Fast Detector Readout - T. Flick

Wireless Detector Readout Transmission using millimeter waves (invented for wireless computer and television needs, HDTV need 3Gb/s) Free space communication, realized in 60 GHz band Enables small chips 2.5x2.75mm chips, ~150mW power consumption (90nm processes) Antennas must be oriented very precisely Measured with 4Gb/s: BER of Possible to read out independent on detector geometry Signals do not pass the silicon layers  Reflections Interlayer „Cluster“-finding Fast Detector Readout - T. Flick 10

Readout Topic in Helmholtz Alliance Several Groups are dealing with readout issues in the Alliance Several experiments / detectors Many common questions and problems (also solutions?) These activities can be supported by the Alliance. Forums to communicate are needed to exchange experiences and work together on common items. Two topics has been started / initiated lately to get a closer communication between Alliance groups. Data transmission test bench (under development) Topical workshop Detector Readout Links (planned) Fast Detector Readout - T. Flick

Readout Link Test Bench Seria- lizer De- Serializer Pattern Generator PC Fast Scope Optical or electrical transmitter Receiver Opt./electr. Link Complete Transmission Line Data Generator BERT Reference FPGA board Fast Detector Readout - T. Flick

Test Bench Purpose Aim of the setup is to provide a test bench in which each component of the transmission line can be tested. Very modular concept Data protocol, transmitters, receivers, electrical/optical links can be exchanged to DUT Tests in irradiation environments are supported External devices (Pattern Generator, Scope) for testing of signal quality, jitters, screws, latencies, etc. Do not belong to the test bench, but are to be taken from VLDT The setup is to be done using commercial devices and serves as comparison benchmark Fast Detector Readout - T. Flick

Status Since no positions have been financed for this the development work is going in parallel to the “normal” lab- work HD (LHCb / U. Uwer): Working on a test card for irradiation (10k funding 2010) Board has most of the functions (FPGA firmware) on it, which are need for this setup: Data generations, transmission/receiving, comparison Test of different optical components W (ATLAS / P. Mättig): FPGA firmware for data transmission and receiving (10k funding in 2011) Encoding / Decoding schemes Phase adjustments Duty cycle controls Optical components test DESY (ATLAS / I. Gregor): Will be the central place for keeping the setup (10k funding in 2012) Development / Production work to come No expensive devices will be bought (Pattern Generator / Scope)  to be used from from the Alliance pool (VLDT) Hardware production should start in first half of Fast Detector Readout - T. Flick

1. Topical Workshop of the Helmholtz Alliance for Detector Readout Links Will take place in Wuppertal 2 days in week of February 2011 Topics: Overview of institutes involved in detector readout links Transmission bandwidths, what is useful, what is possible Implications on detector performances Technology items: Radiation tolerance Power budgets Radiation length Techniques for data transmission Protocols Trigger (Fast Tracker, ROI, …) Invitation and announcement will follow soon Fast Detector Readout - T. Flick

Summary Fast detector readout systems are to be driven to the next generation to satisfy needs for higher luminosity machines, higher detector occupancies and fast trigger decisions Several R&D projects are underway world wide Two possibilities to strengthen the Alliance groups have been started Support by common infrastructure (test bench) Providing a forum for discussion and knowledge sharing Fast Detector Readout - T. Flick