Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CAT’S.

Slides:



Advertisements
Similar presentations
How to Make a Patch Pocket
Advertisements

Press Forming By Lewis & Joe What Is Press Forming Where Is It Used In
DYNAMIC ELECTRICITY.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Heat Exchanger Design Thermal / Fluid System Design Final Project Department of Mechanical Engineering Fall 2005 December 13, 2005 Team Members: Andrew.
January 6. January 7 January 8 January 9 January 10.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Click on this image to open the full PDF document.
Model 12 Intek Horizontal OHV
Intake & Exhaust Team James Hogge Rebekah McNally Alisa Phillips Henos Woldegiorgis Front Upright Team Lloyd Outten Joseph Perry Rear Upright Team Josh.
Formula High School: Team Del-Tech. Team Del-Tech Left to right: Xao Yang, Rob DeLeers, Bart Amenson, Eric Simon, and Derek Blackman.
University of New Hampshire Clean Snowmobile Challenge 2006.
Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CAT’S.
P.V. PANEL WIND LOAD EFFECTS M ARCH 2011 Arman Hemmati, Brady Zaiser, Chaneel Park, Jeff Symons, Katie Olver Interim Review II TEAM 12.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
MECHANICAL DRAWING Chapter 11: Threads Fasteners and Springs
Kern Method of SHELL-AND-TUBE HEAT EXCHANGER Analysis
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Old Main Members: KaLee Allen Mike Berry Jen Dronetti Greg Hofmann Charlie Miracola.
Design of Vessels Under External Pressure
Vessel Design.
How to make a paper airplane
INTRODUCTION Definition:
Threads, Fasteners, and Springs Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Mark a line at the center of the canvas for its entire length. Place frame on a table or saw horses, bottom up.
Noise Control A Guide for Workers and Employers. Steps used to solve Noise Control Problems Define the problem Establish a noise reduction target Determine.
Presented By Dillon Savage & Crystal Green UNIVERSITY OF IDAHO TWO-STROKE WITH DIRECT INJECTION AND SOUND REDUCTION.
Metal Joining Metal joints can be temporary or permanent.
TRENTON Casing Filler Presentation
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Oneone IN-4 Objective: To construct a catapult or series of catapults in order to test an experimental variable. Core Question: How is the experimental.
If I wanted to walk around the yellow area, how far would you need to walk?
Safe Spot ME 4182 Prototype Review #1 March 29, 2006 J.J. Couvillion - Drew Bartlett - Manish Patel - Nick Roberts - Elisha Mellitz.
A box of seeds weighs 0.9 pound. How many pounds would 6 boxes weigh?
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Electricity Unit J. Do Now: DRB5faU DRB5faU.
2006 SAE Clean Snowmobile Challenge Team Members: Steve Battaglia, Brian Belmont, Dan Bughbee, Kevin Gastle Mike Ide, Kelly McRory, Eric Peckham, Dan Sweeney,
Electric Currents Let’s Review…. An electric current is a flow of electric charges along a wire in a circuit.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Three View Drawing Technical Drawing and Design Osbourn Park High School Mrs. House.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Three Ways to Draw a Threaded Bolt Even though they look different, they all mean the exact same thing. It is the CALL-OUT information that is critical.
Benchwork IV –Hand Taps and Hand Reamers
Common Woodworking Hand Tools
Flexible Manufacturing
FASTENERS AND THREAD REPAIR
Fasteners and Cold Metal
Team Members Jacob Schofield - President Nels Eide – Driveline / Testing Mark Boeckmann - Engine Keith Propson – Sound / Exhaust.
Processes used to form metallic materials
Plywood cutlist BP - Base Plate (Dock item#1) BR - Base Rack
4th Grade Physical Science Part 1
Methods for Troubleshooting a Clogged Catalytic Converter
Shop Top Quality Exhaust pipes Parts At PartsAvatar! A typical exhaust system consists of an exhaust manifold, Muffler And Pipe Assembly, connecting pipe,
Electricity is a very useful form of energy.
Iowa State University Design Presentation
2018 SAE Clean Snowmobile Challenge Design Presentation
Overview Project Management Base Sled Selection Engine Management
Plywood cutlist BP - Base Plate (Dock item#1) BR - Base Rack
Wiring the Light and Relay
TRENTON Casing Filler Presentation
Mechanical hardware.
Mechanical hardware.
Iowa State University Clean Snowmobile Challenge
SAE Clean Snowmobile Challenge Design Presentation
LCLS Vacuum System Plans (July 07)
Presentation transcript:

Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CAT’S

UPDATED PROBLEM STATEMENT Want the 2011 U of I CSC sled to be CLEANER and QUIETER Cleaner: Goal: meet National Park Standards E-score of 170 Carbon Monoxide less than 120 g/kW-h Unburned Hydrocarbons less than 15 g/kW-h Quieter: Target: pass competition with 78 dB Goal: meet National Park Standards of 73 dB

UPDATED SPECIFICATIONS SOUNDQuieter than stock CATEasily removable and replaceable SIZEFits in chassis BACK PRESURESimilar to stock

One blank CAT for back pressure testing One CAT with 200 cells per inch CAT Size: 3.5” x 3.5” Body size: 4.5” length x 3.5” dia. Four more CAT’s on the way Put one aside for use in competition with 2-3 hours break- in time During testing we have met NPS CATALYTIC CONVERTER (CAT) FROM ARISTO

EXPERIMENTATION 112/2/2010 Each configuration was tested 6 times: 3 times per side dBA is the average of all the runs ConfigurationdBA Stock with Panels83.93 Stock without Panels Hushpower in Parallel Hushpower in Series Hushpower in Series Hushpower89.13 Laminar Flow90.25

PROTOTYPES

EXPERIMENTATION 21/9/2011 Wondered if stock was quieter simply because it was inside the chassis Ran another set of tests with the stock hanging outside Determined that inside versus outside the sled did not affect sound ConfigurationdBA Stock external85.65 Stock internal Hushpower in Series85.6

POSSIBLE OPTIONS W/TWO HUSHPOWERS LinearTriangular

SYSTEM DIAGRAM Hushpower Mufflers Intake Exhaust Welded Top Cap Welded Bottom Cap Shell CAT Removable End Cap

BILL OF MATERIALS PART NAMEQTY.OVERALL SIZECOST Shell Wrap117.8" x 48" x 1/16" /16" SHEET METAL2" x 48" x 1/16" (2" x 15" EXTRA)1.71 Top band12" x 20" x 1/16" Top Baffle12" x 3.875" x 1/16" Bottom12" x 8.5" x 1/16" 1/16" SHEET METAL4" x 24" x 1/16"1.71 Top 214" x 7.375" x 1/16" Bottom Band14" x 8.25" x 1/16" Bottom spacer14" x 8.25" x 1/16" 1/16" SHEET METAL7.5" x 48" x 1/16" (7.5" x 8" EXTRA)6.39 Shell Top17.5"x 13.5" x 1/16" Shell Bottom15" x 9.25" x 1/16" Top spacer16.5" x 10.5" x 1/16" Top " x 6.75" x 1/16" 1/4" SHEET METAL5" x 16" x 1/4"5.68 Cat upper ring14"OD x.5" (3.25"ID) Cat Bottom ring15"OD x.25" (4"ID) Cat cap15"OD x.5" (3"ID) MISCILANIOUS HARDWARE19.17 TOTAL50.00

DRAWING PACKAGE Three parts to machine Several to cut Everything will be welded but the end cap which will be bolted Settling Chamber

SCHEDULE January 26 th Finish Flow Testing Large and Small diameter CAT’s Stock Muffler Hushpower Mufflers in Series January 26 th Building Materials Obtained Acquire materials from Hushpower Buy steel from Facilities Cut parts January 27 th Begin Muffler Fabrication February 3 rd End of Fabrication February 4 th Begin Dyno Testing Muffler Develop MAP February 9 th Begin Sled Testing March 4 th Leave for Competition March 7 th to 11 th Competition

QUESTIONS?