MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
1 Progress report on Calorimeter design comparison simulations MICE detector phone conference Rikard Sandström.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
D. Huang, MICE video conference1 Proton and Pion productions: preliminary simulation & measurements Dazhang Huang.
1 EMCal & PID Rikard Sandström Universite de Geneve MICE collaboration meeting 26/6-05.
Emittance–momentum matrix1 Demonstrating the emittance-momentum matrix Mark Rayner, MICE Video Conference, 21 January Initial 4D.
30 March Global Mice Particle Identification Steve Kahn 30 March 2004 Mice Collaboration Meeting.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
1 PID Detectors & Emittance Resolution Chris Rogers Rutherford Appleton Laboratory MICE CM17.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Oct 15, 2003 Video Conference Energy Deposition Steve Kahn Page 1 Energy Deposition in MICE Absorbers and Coils Steve Kahn October 15, 2003.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
CMPB Alain Blondel 14 April STATUS OF MICE.
18 August 09Mark Rayner – Momentum measurement by The TOFs1 Momentum measurement by the TOFs A correction to an O(4 MeV/c) bias on the current muon momentum.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
Oct 15, 2003 Video Conference Energy Deposition Steve Kahn Page 1 Energy Deposition in MICE Absorbers and Coils Steve Kahn November 2, 2003.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
Rosen07 Two-Photon Exchange Status Update James Johnson Northwestern University & Argonne National Lab For the Rosen07 Collaboration.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
Oct 15, 2003 Video Conference Energy Deposition Steve Kahn Page 1 Energy Deposition in MICE Absorbers and Coils Steve Kahn November 2, 2003.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
TOF Emittance Pion Emittance Measurement with the TOFs? Mark Rayner 11 December 2008.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
A Student on MICE Adam Dobbs, Imperial College Goldsmith’s Particle Physics Summer School 21 st July 2009.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Early Results from Beam Line Studies Jean-Sebastien Graulich, Geneva
TOF Software and Analysis Tools
Luminosity Monitor Status
A BeamLine update m. apollonio 7/7/2010 CM27 - RAL 1.
How to turn on MICE Step IV
MOM Report + RUN PLAN m. apollonio – Imperial College
Presentation transcript:

MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010

Outline I. Introduction I. Beamline II. Analysis Methodology III. Study Conditions II. Results I. November 2009 II. June 2010 III. August 2010 III. Conclusion 17/09/2010A Dobbs2

1. Introduction The MICE Beamline Analysis Methodology 17/09/2010A Dobbs3

Current MICE beamline 17/09/2010A Dobbs D = Dipole bending magnetQ = Quadrupole magnet CKOV = Cherenkov detectorKL = KLOE Light detector GVA1 = Scintillator counterTOF = Time of Flight BM = Beam Profile MonitorDS = Decay Solenoid DSA = Decay Solenoid Area LM = Luminosity Monitor Target ISIS Q1-3 D1 DS D2Q4-6 GVA1BM1CKOV A,B BM2 TOF0 Q7-9 DSA MICE Hall TOF1 TOF2KL LM 4

17/09/2010A Dobbs5 Target DAQ dataDATE DAQ data Data Reduction 1: integrated beam loss analysis, etc Particle rate data extraction with G4MICE Scalers app Reduced Beam Loss data Particle Rate data Combine data by matching time stamps Combined data Data reduction 2: extract means and errors for variables on a run-by-run basis (throw away spill-by-spill correlation) Final plots of beam loss vs particle rate gzipped ascii, sorted by time binary, sorted by run ascii, sorted by time ascii, sorted by run ROOT binary, sorted by run ROOT binary, sorted by study Time-of-Flight data Time-of-Flight data extraction with G4MICE TofTree app Apply cuts to find physical tracks and extract number present Reconstructed TOF track data Use Sector 7 Integrated Beam Loss per run Final plots of beam loss vs reconstructed tracks ROOT binary, sorted by study Match beam loss and TOF track data by run number ROOT binary, sorted by study

Beam Loss Analysis Methods 17/09/2010 Peak Value Integral Value Target DAQ data Data Reduction 1 – fitted peak beam loss analysis, etc Reduced Beam Loss data A Dobbs6

17/09/2010A Dobbs Study Conditions 7

2. Results November th June th June 2010 August /09/2010A Dobbs8

Nov 09: Target Depth and S7 vs S8 17/09/2010A Dobbs9

17/09/2010A Dobbs Nov 09: Rate Vs. Beam Loss 10

June 10: Target Depth Vs. Beam Loss 17/09/2010A Dobbs11

June 10: Luminosity Vs. Beam Loss 17/09/2010A Dobbs12

June 10: Luminosity Vs. Beam Loss Spill-by-Spill 17/09/2010A Dobbs13

15 th & 16 th June10: Rate Detectors 17/09/2010A Dobbs14 15th study: 15 TOF1 hits per 3.2ms spill at 1.3V.ms 25 TOF1 hits per 3.2ms spill at 2V.ms Assuming linearity of rate across the spill: 5 TOF1 hits per 1 ms spill at 1.3V.ms 8 TOF1 hits per 1ms spill at 2V.ms. 1 16th study: 30 TOF1 hits per 1ms spill at 1.3V.ms 60 TOF1 hits per 1ms spill at 2V.ms. NB: 1.3V.ms ~ 2V peak in R8BLM1

16 th June: TOF PID for Run /09/2010A Dobbs15  Large peak is mainly muons with perhaps some pion contamination in tail  Small peak to the left is positrons

15th study:Average # of pulses per run = tracks per 3.2ms spill at 1.3V.ms 10.5 tracks per 3.2ms spill at 2V.ms Assuming linearity of rate across the spill: 2 tracks per 1 ms spill at 1.3V.ms 3 tracks per 1ms spill at 2V.ms. Reconstructed TOF Tracks Vs. Beam Loss 17/09/2010A Dobbs16 NB Removed run 2011 from 16th plot, bad reconstruction due to DAQ error 16th study:Average # of pulses per run = tracks per 1ms spill at 1.3V.ms 33.5 tracks per 1ms spill at 2V.ms → Reduction of ~ 60% for 15 th, ~ 40% for 16 th Possible causes include particle decay between TOF0 and TOF1 and DAQ deadtime.

Aug 10: Target Depth and S7 Vs S8 17/09/2010A Dobbs17

Aug 10: Rate Vs. Beam Loss 17/09/2010A Dobbs18 DATE DAQ Gate short and late wrt to spill → target parabola swinging later in spill as depth increases could cause observed non – linear rate increase with beam loss. Tail off at the end of TOF Tracks plot probably caused by DAQ deadtime or software reconstruction inefficiency (although number of particles in whole spill gate is not high, very large beam losses do lead to very large instantaneous rates).

3. Conclusion Summary Future Plans 17/09/2010A Dobbs19

Summary 17/09/2010A Dobbs  Beam Loss varies approximately linearly with target BCD for 25mm ≤ BCD ≤ 30mm, for ‘normal’ short target delay  Particle Rate in the MICE Beamline scales approximately linearly with increasing Beam Loss up to 5V.ms in (Sector 7 Integral)  At 2V beam loss for π → µ optics observed:  8 TOF1 hits per 1ms spill for –ve  60 TOF1 hits per 1ms spill for +ve NBRemember doublet optics, and losses due to reconstruction when interpreting this. 20

Future Plans 17/09/2010  No more data runs planned in nearer future  TOF reconstruction – understand why seem to lose particles c.f. Scalers  Model beam line rates with G4BeamLine / G4MICE simulations  Use ORBIT to understand loss patterns around ISIS and relate beam loss to protons-on-target A Dobbs21

Spares 17/09/2010A Dobbs22

Preliminary TOF Analysis 17/09/2010A Dobbs23