Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez
Overall Need/Milestone To find the relationship between weather conditions and the toads’ call. Milestones: – Software Design (10/05) – Power Management System (10/7) – Power System (10/15)
Tasks Completed Testing the audio filter Received all components – FPGA – Weather System
Ongoing/Pending Tasks Software Design – Getting LabView for FPGA from OIT
Upcoming Tasks Software Design Power Management System Assembling Hardware
0% 90% 0% 85% 0% 25%100% 25%
Project Schedule