AIRFRAME MEASUREMENTS P09233 – Managerial Design Review SDII.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Dan Garber, Jacob Hindle, and Bradley Lan Advisor: Dr. Joseph Driscoll
MicroCART Micro processor C ontrolled A erial R obotics T eam Abstract MicroCART is a group of EE/CprE students tasked with developing an autonomous helicopter.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Using inertial navigation systems (INS) to navigate
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
AIRFRAME MEASUREMENTS P09233 – Managerial Design Review.
11/10/2008 Airframe Measurements P09233 Michael
Inertial Measurement Unit “IMU” (Analog Devices ADIS16350) - Tri-axis gyroscope ± 75°/s, ± 150°/s, ± 300°/s settings - Tri-axis accelerometer ± 10 g measurement.
P09233 Flight Parameter Measurements Michael Skube & James Hunt P09233
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
U NIVERSITY OF M ASSACHUSETTS, A MHERST Department of Electrical and Computer Engineering.
MSD Project P10236: Versatile Adaptive Controller Project Introduction P10236 Introduction.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Project Status Update R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Airbag Automaton John Bailey Hattie Hiatt Chun Hau Low Jason Harwood Wayne Gallup Jason Canaday.
EDGE™ Project Status Update P09121 – MAV Airframe P09122 – MAV Control System P09123 – MAV Platform Structure Aaron Nash (Mechanical Engineering) Erik.
Vehicle Tracking/Payload Release System For Small UAV Project Team
EDGE™ MAV Control System - P09122 Final Project Review Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
P13625 – Indoor AIR Quality Monitor
Assembly Line Simulation With Multi-Robot Control Peter McHugh Thomas Zack Kyle Fecteau.
Μ - CART Microprocessor – Controlled Aerial Robotics Team (Ongo03) An Ongoing Senior Design Project Department of Electrical and Computer Engineering Iowa.
DemoSat IV Critical Design Review Metropolitan State College of Denver April 21, 2006.
o Portable low-cost aerial drone that can be used for reconnaissance o Relay real-time video and data, like location, heading, battery life o Take high-resolution.
MAGIC Robot Demo ESE111 November Joe Trovato, James Yang.
RP10 Robotics Platform RP10 Robotics Platform Team Cyberdyne Final Presentation Sahil Verma Adam Nabinger Paul Berens Joseph Wertz Karl Orosz Jeff Kinner.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
M E T ROVER MSCD Engineering Technology Critical Design Review Metropolitan State College of Denver April 2004.
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
-Team Member Name 1 -Team Member Name 2 -Team Member Name 3 -Team Member Name 4 -Team Member Name 5.
High Altitude Balloon Instrument Survival Package Joseph Burns, Tom Fox, Austin Isitor, Nick Schuyler.
Introduction UAV is an Unmanned Aerial Vehicle Our goal is to setup two different plane configurations with Paparazzi autopilot and fly them autonomously.
EE/CS 481 Spring February, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Team Awesome-O Senior Design Project Proposal Presentation 1 October 2008 John Burke Blake Jones David Ladao Bryan Winther.
EE/CS 480 Fall November, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Spalding Gymnastics Scoreboard Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer Ali Khan.
Aerospace Digital Communication Instrument Senior Design 1 Presentation.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
A.M.E.N. Autonomous Meteorological Embedded Network for Fire Fighting Fan Zhang, Dmitry Stomakhin, Flavio Sira, Brian Hansen.
Aerospace Digital Communication Instrument Senior Design Presentation.
EE/CS 481 Spring 2008 Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano James Kelly Kevin Young Advisor Dr. Joseph Hoffbeck Industry.
Spring CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser.
Final Semester 2 Presentation: April 24, Joshua Lasseigne: Team Lead and Autopilot Programming Christopher Edwards: AGL Subsystem and Website Maintenance.
Abstract Each July, the Association for Unmanned Vehicle Systems International holds an annual International Aerial Robotics Competition (IARC), with major.
Mid Semester 2 Presentation: February 27, Joshua Lasseigne: Team Lead and Autopilot Programming Christopher Edwards: AGL Subsystem and Website Maintenance.
Scrumm meeting. Mechanical Done. Work on RFID attachments Started designing top Working on encoders What to do? Work on design encoders.
Educational Apparatus to Demonstrate 1-D Conductive Heat Transfer David Olney Todd Jackson Edward Turfitt Charles Pueschel Ian Abramson Alysha Helenic.
RIT MAV System Review (P08121) Dr. Jeffrey Kozak – Faculty Guide Michael Reeder – Team Leader Kevin Hand – Lead Engineer Todd Fernandez – ME.
Airframe Measurements
SENSOR SELECTION CALIBRATION OVERVIEWOVERVIEW DESIGN ROADMAP ACKNOWLEDGEMENTSACKNOWLEDGEMENTS The project would not have been possible without the extensive.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Micro-CART SDongo3b Secondary Vehicle Team April 26, 2006
Hybrid Engine Test Stand
ECE477 Final Review: Team #1: Project Dada
Vehicle Electrics Institute
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
ECE 4006 Mid-Term Presentation
Engineering Design Process
Snow Penetrometer Embedded System Design
Engineering Design Process
C140 Navigation System Upgrade Manual
Airframe Measurements P09233
C140 Navigation System Upgrade Manual
Presentation transcript:

AIRFRAME MEASUREMENTS P09233 – Managerial Design Review SDII

Team Structure  Team Lead: Michael Skube – Mechanical Engineer  Co-Team Lead: James Hunt – Mechanical Engineer  Electrical Lead: Joseph Peters – Electrical Engineer  Kevin Li – Electrical Engineer  William Atkinson – Mechanical Engineer  Heidi Morgan – Electrical Engineer  John Isely – Mechanical Engineer

Project Concept Summary GPS Velocity IMU Altitude Data Processing Provide Measurements for Controlled Flight Interchangeable Sensors Single Mounting Structure Low Impact on Airframe Provide Measurements Package Sensor Function Measurement System Usage/Implementation Measurement System Assembly Provide Documentation

Airframe Measurement System

Measurements Box Final Design Microcontroller Altimeter GPS Ultrasonic IMU

Sensor Testing

Project Costs  Measurements Box BOM:  $1100 (includes IMU cost ~$500)  $600 (assumes donated IMU)  The Final Project Cost: $1765 See for complete expense report

Project Evaluation: Success and Failure  Successes:  Sensor Testing  MCU Communication w/ Sensors  In-Flight SD Card Data Collection  Box Crash Survival  Future Work:  Measurement Box Users Manual  Further IMU Testing  Complete Box Testing