AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)

Slides:



Advertisements
Similar presentations
AAE450 Spring 2009 Reliability Analysis Solomon Westerman, PM Week 5, 2/12/09 [Solomon Westerman] [PM] 1.
Advertisements

Lunar Lander Power Systems
AAE450 Spring 2009 UHF Lander-Rover COM Systems Toy Ball Shell Structure Communications Group Trans Lunar Phase Group Toy Ball Analysis Lander CATIA Design.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
AAE450 Spring 2009 Arbitrary Payload Cost Optimization to LLO Tasks: Payload Cost / Mass Optimization (Launch to LLO) Disprove Momentum Transfer Alternative.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Slide 1 of 8 Orbital Transfer Vehicle (OTV) Masses and Costs Ian Meginnis March 12, 2009 Group Leader - Power Systems Phase Leader -
AAE450 Spring 2009 Kelly Leffel 3/26/09 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control (Day) Kelly Leffel Structures.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Analysis Cold Xe Gas Thrusters [Brian Erson] [Attitude] 1.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring Attitude Control – Arbitrary Payload Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis Design.
AAE450 Spring Spinning Descent and Compressed Gas Hopper Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Week 4 Presentations [Solomon Westerman][PM]
AAE450 Spring 2009 Tony Cofer Power Group TLI Phase 03/05/09 Power Limitations for Arbitrary Payload Tony Cofer] [Power] page 1.
AAE450 Spring 2009 Propellant Requirements Attitude Control Thrusters with Low Thrust Orbit Trajectories [Josh Lukasak] [Attitude Group Lead]
AAE450 Spring 2009 LEO Atmospheric Drag Analysis and Lunar Orbit Circularization [Andrew Damon] [Mission Ops] February 19,
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Translunar Orbit Transfer Vehicle (OTV): Propulsion System Setup for 100g & 10 kg Case Launch Vehicle Selection for Arbitrary Case Thermal.
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
Project X pedition Spacecraft Senior Design – Spring 2009
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Electronic Hardware Systems Communications Trans-Lunar Phase Joshua Elmshaeuser Communications 1.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Thruster Analysis [Brian Erson] [Attitude] 1.
AAE450 Spring Lunar Descent Attitude Control Analysis Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 X 0 Power System Solar - Battery Solar arrays Tony Cofer- Power System.
AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
Week 13 Presentation Thursday, April 9 th, 2009 Saad Tanvir Propulsion Group 1 Lunar Descent – Hybrid Propulsion System Propulsion System Inert Mass Finals.
AAE450 Spring 2009 Patch Antenna Pivot Michael Christopher -Communications Group -TLI Phase Group 1 OF 5Michael Christopher - COM.
A spring with a mass of 6 kg has damping constant 33 and spring constant 234. Find the damping constant that would produce critical damping
AAE450 Spring 2009 X 0 Secondary Power System Battery (Lithium-Ion) Jeff Knowlton-Power System.
AAE450 Spring 2009 Communications Ground Stations Communication Equipment Alternative Landing Method March 26, 2009 [Trent Muller] [COM]
AAE450 Spring 2009 Slide 1 of 7 Final Presentation Slides Ian Meginnis April 9, 2009 Group Leader - Power Systems Phase Leader - Translunar Injection OTV.
AAE450 Spring 2009 Slide 1 of 8 Final Presentation Back-up Slides Orbital Transfer Vehicle (OTV) Power and Thermal Control Ian Meginnis Ian Meginnis Power.
Force of Gravity Pre-Lab Are the forces of gravity acting on the two students different? What is another term that means the force of gravity? Weight –
AAE450 Spring 2009 Lunar Lander Power Systems Thursday March 12 th Adham Fakhry Power Group Lunar Lander Descent Night Thermal.
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Final Slides Lunar Lander Structure April 9, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
Apollo 50 Lunar Mission Concept Goal: Initiate a series of lunar campaign missions, inspired by Apollo 11, to explore the potential of the Moon for science.
AAE450 Spring 2009 Thermal Transport Subsystems Toy Ball System,100g Payload John Dixon COM GL, Loco PL [John Dixon] [COM GL] 1.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
AAE450 Spring 2009 Lander CATIA Design Communications Group Trans Lunar Phase Group Space Ball Analysis Lander CATIA Design Joshua Elmshaeuser Communications.
Hopper Spacecraft Simulator. The “Hopping” Concept -Land on a celestial body using engines, conduct surface operations, then re-ignite engines and ‘hop’
AAE450 Spring 2009 Kelly Leffel 2/5/09 Structures and Thermal Lunar Descent Phase Kelly Leffel Structures and Thermal 1.
AAE450 Spring 2009 Lunar Night and Lander Power System Adham Fakhry February 26th, 2009 Power Group Lunar Descent Phase Passive Thermal Control for Lunar.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
AAE450 Spring 2009 Power Systems for Lander Adham Fakhry [Adham Fakhry] [Power]
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
AAE450 Spring 2009 Lander Sizing and Launch Vibrations Feb. 12, 2009 Earth Launch/Lunar Descent Phase Group 1 [Ryan Nelson] [STRC]
Cost Comparison of Higher Parking Orbit Scale up for Arbitrary Payload
Attitude, Lunar Transfer Phase
Lunar Descent Slide Suggestions & Questions
Lunar Descent Trajectory
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
By: Josh Lukasak Attitude Group Lead Lunar Descent Phase Manager
[Solomon Westerman] [PM]
[Solomon Westerman] [PM]
John Dixon Communications Group Lead Locomotion Phase Lead
Launch Vehicle Selection Spring Cannon Launch Vehicle Alternatives
Force of Gravity Pre-Lab
Final Slides Attitude Control System (ACS) – Lunar Transfer
Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.
Presentation transcript:

AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)

AAE450 Spring 2009 Hopper Alternative for GLXP  The hopper design for the 10 kg and 100g payload cases has considerable savings. –Lander/Rover total system mass of 278 kg –Hopper total system mass of kg –Reduction in two COM systems, one on the Lander and one on the rover, totaling over $200,000.  Complexity from a mission stand point may eliminate this from a viable option for the low mass payloads [Josh Lukasak] [Attitude] (2)

AAE450 Spring 2009 Hopper Scale Up [Josh Lukasak] [Attitude] (3)  Based on initial scale up calculations the hopper seems to be the most viable option for the arbitrary payload case.  The Lander/rover system delivers more to the lunar surface but requires a large rover to move the payload. –For the DNEPR arbitrary case the Lander/Rover system can deliver 555 kg compared to 415 kg from the hopper case. –This requires that for the Lander/rover case to be viable a rover of only 140 kg must be created to transport 415 kg the required 500 meters.  This assumes that the arbitrary payload must touchdown and relight.

AAE450 Spring 2009  Back Up Slides [Josh Lukasak] [Attitude Group Lead] (4)