Bob Iacovazzi Jr. September 20, 2011 GOES-R GLM Calibration GLM Science Meeting 2011.

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

Jeffrey Kronenwetter PLT Director PLT Coordination & Field Campaign Preparations.
GOES-R Program Calibration and Validation Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (1), Steve Goodman (2), Changyong Cao (3), Jaime Daniels (3),
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment 6 th GOES Users’ Conference Madison, Wisconsin Tuesday, November.
Greg Mandt GOES-R System Program Director 2011 GOES-R Proving Ground Annual Meeting Boulder, CO May 17, 2011.
1 GOES-R Calibration Working Group (CWG) June 16, 2010 Presented By: Changyong Cao 1 NOAA/NESDIS/STAR CWG Progress Update.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
DCS Architecture Bob Krzaczek. Key Design Requirement Distilled from the DCS Mission statement and the results of the Conceptual Design Review (June 1999):
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
Calibration Working Group L1b Cal/Val Update 1 Presented by Changyong Cao NOAA/NESDIS/STAR GOES-R Calibration Working Group January 9, 2014.
July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Sensor Calibration/Validation.
Bob Iacovazzi, Jr. GOES-R POSST Ops Manager (POM) January 9-10, 2014 GOES-R Product Operations Science Support Team: Planning for GOES-R Cal/Val AWG Second.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
March 26, 2014 Space Weather Product Team (SWPT) Kick Off Meeting.
GOES-R Program Calibration and Validation (Cal/Val) Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (2), Steve Goodman (1), Changyong Cao (3), Jaime Daniels.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
AERONET Web Data Access and Relational Database David Giles Science Systems and Applications, Inc. NASA Goddard Space Flight Center.
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
1 Long Term Monitoring JPSS Algorithm Team Presented by Date.
1 GOES-R AWG Product Validation Tool Development Aviation Application Team – Volcanic Ash Mike Pavolonis (STAR)
1 GOES-R AWG Product Validation Tool Development Aviation Application Team – Volcanic Ash Mike Pavolonis (STAR)
06/30/ Data Product Service (DPS) Packaging and Context Dan Crichton Steve Hughes Ron Joyner Chris Mattman Paul Ramirez Peter Shames.
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment GOES Users’ Conference Madison, Wisconsin Tuesday, November 3,
Page 1 ENVISAT Validation Review – Frascati – 9-13 December st Envisat Validation Workshop MERIS, December 2002 Conclusions and Recommendations.
2015 AMS Annual Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES- R.
2015 GLM Annual Science Team Meeting: Cal/Val Tools Developers Forum 9-11 September, 2015 DATA MANAGEMENT For GLM Cal/Val Activities Helen Conover Information.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
Calibration/Validation of the NPOESS NPP Instruments: Plan Overview National Polar-Orbiting Operational Environmental Satellite System Karen St.Germain,
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
GLM Lightning Val Plans Monte Bateman, Doug Mach, Rich Blakeslee, Bill Koshak & Steve Goodman.
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Calibration and validation of satellite sensors 1 Sharlene-Asia Naicker Maanda Rambau Sedzani Elia Muravha Amanda Forbes Busisiwe Nkuzani Busisiwe Nkuzani.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
GLM Annual Science Team Meeting Cal/Val Tools Developers Forum 9-11 September 2015 GLM PLT & Cal/Val Status William Koshak, NASA/MSFC.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
1 GOES-R AWG Product Validation Tool Development Hydrology Application Team Bob Kuligowski (STAR)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS JMA’s Cal/Val activities Presented to CGMS-44 Working Group.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
1 CLARREO Advances in Reflected Solar Spectra Calibration Accuracy K. Thome 1, N. Fox 2, G. Kopp 3, J. McCorkel 1, P. Pilewskie 3 1 NASA/Goddard Space.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
GLM Science Meeting GLM Instrument Performance Verification GLM Science Meeting September 27-29, 2016 Dr. Samantha Edgington Clem Tillier Lockheed.
GSICS Procedure for Product Acceptance Update
I&T&C Organization Chart
Planned Activities of GSICS Microwave sub-group
NESDIS-JMA AHI Collaboration
GLAST Large Area Telescope:
Overview of the AATSR Validation Programme
GOES-R Program Systems Engineering (PSE) Cal/Val Lead
Sensor calibration.
Recent activities of OCR-VC
HMI Top Level Requirements
T. Hewison, S. Wagner, A. Burini, O. Perez Navarro, M. Burla, F
T. Hewison, S. Wagner, A. Burini, O. Perez Navarro, M. Burla, F
Integration & Test Instrument Operations Coordination
Presentation transcript:

Bob Iacovazzi Jr. September 20, 2011 GOES-R GLM Calibration GLM Science Meeting 2011

GOES-R Calibration Definition Calibration: The process to determine factors for converting and correcting raw detector measurements into science data units (e.g., radiance) with the specified level of accuracy. [Calibration requirements are found in MRD Sections ] -GOES-R Program Acronym and Glossary 2

GOES-R Program Cal/Val Documents Roles and Responsibilities 3

Calibration Support for GLM Instrument, Spacecraft and Ground Segments Vendors GOES-R Cal/Val Working (CWG) Group Members and Partners  Flight Project  Ground Segment Project  NOAA/NESDIS/STAR  MIT Lincoln Laboratory  Field Campaign Support (NASA, NOAA, JPL, etc.)  Marshall Space Flight Center/UAH 4

Calibration Coordination Team (CCT) Formed Under New PSE Leadership AWG PSE & Program Science Flight GSP Instr./SC Vendor GS Vendor MOST DOST GOES-R Calibration Coordination Team Scope – A coordinating body to ensure efficient implementation of calibration activities throughout the GOES-R Program during all mission phases. GOES-R Calibration Coordination Team membership diagram CCT members - Representatives of any group with responsibility to ensure L1b Product integrity, e.g., PSE & Program Science Flight (Deputy Project Manager, Instrument Managers) Ground (Deputy Project Manager) Other CWG reps Vendors (Instrument, Spacecraft and Ground) MOST (MOM) DOST (DOM) AWG CCT provides a forum to clarify GOES-R cal/val activities and associated member roles and responsibilities PSE lead has the final authority on cal/val topics 5

Major GLM Cal-related Activities in Each Mission Phase Pre-Launch  Schedule determined by Flight and Vendors  Instrument and Test Design and Review  Instrument Testing and Test Verification  L1b Algorithm Development, Implementation and Review Post-Launch Testing (PLT)  Schedule determined by MOST and DOST  Science Test Design and Review  Science Tests Analysis and Verification  Cal Parameter Verification  Long-Term Monitoring Initialization  Performance Analysis/Anomaly Resolution Mission Operational Lifetime  Schedule determined by Ops  Long-Term Instrument and L1b Product Monitoring  Cal Parameter Updates  Anomaly Resolution 6

Pre-Launch  Schedule determined by Flight and Vendors  Instrument and Test Design and Review  Instrument Testing and Test Verification  L1b Algorithm Development, Implementation and Review Post-Launch Testing (PLT)  Schedule determined by MOST and DOST  Science Test Design and Review  Science Tests Analysis and Verification  Cal Parameter Verification  Long-Term Monitoring Initialization  Performance Analysis/Anomaly Resolution Mission Operational Lifetime  Schedule determined by Ops  Long-Term Instrument and L1b Product Monitoring  Cal Parameter Updates  Anomaly Resolution 7 Major GLM Cal-related Activities in Each Mission Phase

8 GLM is an imager and an event detector and must be radiometrically calibrated for background scenes (images) and for lightning events (optical pulses) Calibration activities consist of six procedures:  Static radiometric response (Linearity and uniformity)  Transient radiometric response (instrument calibration)  Performance test (detection efficiency, false event rate, etc.)  Field of view  Spectral response  Spacecraft motion and jitter simulation Lockheed-Martin Pre-launch Calibration Overview

9 Calibration is performed in a class 10K clean room at LMATC Principal equipment includes  Large integrating sphere (NIST Certified)  Integrating sphere with co-aligned optical pulse emitter  Two precision rotary stages  Collimator  Tunable laser  GLM GSD including a dedicated lightning calibration computer system Lockheed-Martin Pre-launch Calibration Overview

Pre-Launch Design & Development Review Lockheed-Martin GLM Instrument Manager GOES-R Portal Flight / Instrument Vendor Interface Flight/CWG Review Development Plans, Procedures, Reports, Draft CDRLs, RFA Responses, Requested Items CDRLs, Reports Reviews, TIMs, and TRRs Reports, Presentations Feedback, Comments, Requests, RFAs CDRLs, Reports RFA Responses, Requested Items RFAs Feedback, Comments, Requests, Direction, RFAs Feedback, Comments, RFAs 10

Pre-Launch Calibration Data Management Lockheed-Martin Cal TestingCal Analysis GLM Instrument Manager GOES-R Portal Flight / Instrument Vendor Interface Flight/CWG Verification Selected Cal Reports & Data for CDRLs Cal Test Data, Results & Reports Vendor Archive 2030 expiration All Instrument Test Data Cal Test Data Requests, Discrepancy Notification Cal Test Data Requests, Discrepancy Notification Cal Test Data, Discrepancy Resolution Cal Test Data, Documentation, Results Cal Test Validation Reports Cal/Val Long-term Stewardship 11

Lockheed-Martin L1b GPA Development GOES-R Portal CLASS Ground / Ground Segment Vendor Interface Import: L1b GPA, Test Case IO Export: L1b GPA Implementation Results Import: GPA, Test IO, Cal Database, etc. Export: L1b GPA Review Harris L1b GPA Implementation Flight / Instrument Vendor Interface L1b Ground Processing Algorithm (GPA) Development and Implementation Export: L1b GPA (CDRLs), Test IO, Description, and Implementation Certification Import: L1b GPA GS Vendor Implementation Results CWG TIMs (GSP L1b IPT Chair facilitating) TIMs (GLM Instrument Manager Facilitating) 12

Pre-Launch  Schedule determined by Flight and Vendors  Instrument and Test Design and Review  Instrument Testing and Test Verification  L1b Algorithm Development, Implementation and Review Post-Launch Testing (PLT)  Schedule determined by MOST and DOST  Science Test Design and Review  Science Tests Analysis and Verification  Cal Parameter Verification  Long-Term Monitoring Initialization  Performance Analysis/Anomaly Resolution Mission Operational Lifetime  Schedule determined by Ops  Long-Term Instrument and L1b Product Monitoring  Cal Parameter Updates  Anomaly Resolution 13 Major GLM Cal-related Activities in Each Mission Phase

Postlaunch Instrument Calibration Data Flow 2-Day Store Cal Parameter Tables and Algorithms (Wallops only) NOAA Satellite Operations Facility (NSOF) L1b Data, GLM L2+ GRB CLASS GAS MM, PG, PD and DE CWG Instrument Radiometric, Spectral. Spatial Calibration Data Quality Assurance for GOES Series-R Post Launch Verification Long-term Instr. Monitoring Deep-Dive Calibration Analysis and L1b Product Anomaly Resolution Calibration Parameter Updates Wallops Command and Data Acquisition System (WCDAS) Fairmount, WV (RBU) Instrument Calibration Data GLM Background Images Calibration-relevant instrument housekeeping & engineering data L0 Data L1Data, GLM L2+ GRB Product Generation Operational Environment L0 & Input Data Ground Processing Algorithm L1b Calibrated Data Product Generation Development Environment L0 & Input Data Experimental Ground Processing Algorithm Experimental L1b Calibrated Data CLASS Updated Calibration Parameter Tables Cal L0 and Processing Data L1b, L2+ Products, Instr. Cal Data L0 Data Instrument Calibration Data Via Terrestrial Data Link MLS 14

Anomaly Resolution L1b Product Performance Monitoring and Anomaly Resolution Instr. Telemetry 5-Day RDR CLASS WCDAS/RBU-SOZ NSOF-SOZ DE in WCDAS SOZ SOZ-wide Access to Cal Terminals CALVAL Workstation Gov’t Tools MLS 2-day GAS SOZ-wide Access to Cal Terminals CLASS External Org Anomaly Resolution Org LS External Org Workstations Automated Cal Data Acquisition GOES-R Integrated Cal/Val Instrument Performance Web Displays CALVAL Workstation Gov’t Tools Org GOES-R Terminals Org Firewall L1b, CAL Product Generation: Product Performance Monitor Mission Mgmt: GRB Downlink & Monitor L0 L1b (GRB) Mission Mgmt: GRB Uplink Mission Mgmt: Instr. Temps, etc. H & S Monitor CAL (RDL) L1b (GRB) 2-day L0 Product Generation/ Distribution: Create L0, L0 to L1b processing and GRB generation. 15

Long-term Radiometric Trending Comparison of GOES-E/W GLM background images Ratio of GLM background image radiances with ABI and other instruments Post-Launch Calibration Evaluation GEO-LEO GEO-GEO Instrument Performance Monitoring Tracking of thermal stability of GLM components Quick views of GLM background images, output every 2.5 minutes 16

Long-term Radiometric Trending Sonoran Desert and White Sands Site Characterization  Sonoran Desert has been used for GOES Imager long-term radiometric trending  White Sands is a possible new site for GOES-R  Characterization of BRDF to remove seasonal signal variation for vicarious calibration. ER-2 AVIRIS/MASTER Flight Acquisitions Completed: WSMR (May 23, 2011), Sonoran Desert (June 10, 2011) Several methods have applicability to determining lifetime GLM radiometric calibration drift:  Vicarious calibration using deep convective clouds (DCC), sun glint, and deserts  Radiance bias estimate using NWP and radiative transfer models 17 Post-Launch Calibration Evaluation

Summary GLM calibration leveraging diverse complementary technical capabilities Comprehensive GOES-R GLM Cal/Val Strategy and Plan developed to ensure product quality  Pre-launch Vendor implementation and Government review processes for GLM calibration testing and data, and ground processing algorithm  Post-launch  GLM calibration-relevant data capture and monitoring to support anomaly resolution  Long-term calibration trending 18