1 Leveling: Tortoise not Hare. 2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that.

Slides:



Advertisements
Similar presentations
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Advertisements

Vandal Boat Factory Simulation
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Starting the Journey. Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value.
Just-in-Time and Lean Systems
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
MSE507 Lean Manufacturing
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Basics of Lean How to See and Eliminate Waste Slides courtesy of Doug Fingles, MERC.
Value Stream Mapping.
Process Improvement Strategies Takt Time Future State Value Stream Map
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Lean for Process Manufacturing QAD Midwest User Group Meeting Stephen Dombroski – September 2011.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Reid Lifting - QuickScan Feedback Session Friday 11 July 2014.
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Ten Steps to Lean Production Steps to CIM 1.Re-engineer (revisit, replan) the manufacturing system Form U-cells to produce families of parts (clusters)
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Basics Dewey Warden.
LEAN system.
JIT – Just-In-Time Production
JIT and Lean Operations
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
Chapter 7 – Just-in-Time and Lean Systems
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Lean Manufacturing Chapter 15 pp June 29, 2012.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MAPPING YOUR VALUE STREAM
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
Chap 4 - Facility Layout: Manufacturing and Services.
Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.
Operations Fall 2015 Bruce Duggan Providence University College.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
FMS 300 Series FBP-FMS320A Introduction to Flow Series: FMS320 to FMS325.
Manufacturing/Office Cells
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
A SEMINAR ON “LEAN MANUFACTURING”. What is Lean Manufacturing? Lean manufacturing is a comprehensive term referring to manufacturing methodologies based.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
Introduction to Lean Emily Varnado.
Value Stream Mapping GEOP 4316.
Just-In-Time and Lean Production
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 12 Lean Production. Chapter 12 Lean Production.
Presentation transcript:

1 Leveling: Tortoise not Hare

2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that races ahead and then stops occasionally to doze. The Toyota Production System can be realized only when all the workers become tortoises.

3 The Leveling ParadoxThe Leveling Paradox  The Leveling Paradox  Leveling provides a standardized core for Resource Planning  Why do this to yourself ?  Smoothing demand for upstream processes  How to Level  Initial efforts to level production and mix  Incremental leveling  Slice & Dice  Product families and subfamilies

4 Leveling: Core for Resource Planning

5Example

6 Heijunka 1. Level, smooth production: product volume

7Heijunka 2. Level, smooth production: product mix Traditional production Level production RakeShovelSpadeMonday Tuesday Wednesday Thursday Friday

8 Heijunka 3. Level, smooth production: product sequence

9 Leveling High Variety Product MixLeveling High Variety Product Mix  High volume parts --> built-to-stock signal --> supermarket --> replenished by Kanban  Low volume parts --> built to customer order

10 Why Leveling?Why Leveling?  Problems:  Small batches -->  Frequent changeovers/change in material -->  Lost production -->  Missed schedule  Traditional solution:  Large batches   Less changeovers/change in material

11 Why Leveling?Why Leveling?  Toyota solution:  Lifting the “cloud”  Setup time reduction (SMED)   Increased flexibility  Level material demand  Read Toyota Atsushi Niimi Interview

12 Cell DesignCell Design  Tool for one-piece flow  Cell:  Group of workstations, machines or equipment  arranged such that a product can be processed progressively from one workstation to another  w/o waiting for a batch to be completed and  w/o additional handling between operations

13 Traditional LayoutTraditional Layout

14 Lean Cell LayoutLean Cell Layout

15 U-shaped Cell ExampleU-shaped Cell Example

16 Designing CellsDesigning Cells 1.Group similar products into families that can be processed on the same equipment in the same sequence 2.Calculate takt time 3.Determine the work elements and time required for making one piece 4.Determine equipment cycle time 5.Organize machines in order or processing (U-shaped) 6.Balance the cell 7.Determine how the work will be divided among operators

17 Manage Change ProcessManage Change Process  Operators  Crosstraining  Job rotation  Solve production problems  Improvement suggestions  Plan coordinate, and control their work  Group setting

18 Manage Change ProcessManage Change Process  Managers  Planning  Supervisors  Accounting  Reward system  Plan for demand changes

19 Advantages  Decreased  Transportation  Waiting time  WIP  Floorspace  Lead time  Increases flexibility (Variety and customization)  Better communication between operators --> improved quality and coordination

20 Value Stream Mapping

21 What is Value Stream Mapping  Value stream: Actions required to bring a product through the main flows essential to every product:  Production flow from raw material to customer delivery  Design flow from concept to launch  Information flow as important as material flow

22 Using the Mapping ToolUsing the Mapping Tool

23 Current-State MapCurrent-State Map  Material Flow Icons  General Icons  Information Flow Icons

24 Material Flow Icons 1Material Flow Icons 1

25 Material Flow Icons 2Material Flow Icons 2

26 Information Flow Icons 1Information Flow Icons 1

27 Information Flow Icons 2Information Flow Icons 2

28 General IconsGeneral Icons

29 Characteristics of a Lean Value StreamCharacteristics of a Lean Value Stream  Produce to your takt time  Takt time= rate of customer demand  Develop continuous flow wherever possible  Use supermarkets to control production where continuous flow does not extend upstream  Try to send the customer schedule to only one production process  Level the production mix  Level the production volume  Develop the ability to make “every part every day” (Level production sequence)

30 The Future-State MapThe Future-State Map  Goal:  Built a chain of production where the individual processes are linked to the customer and  Each process gets as close as possible to producing only what its customer needs when they need it  First pass: What can we do with what we have?  Later: Address product design, technology, and location issues

31 Key Question for Future-State MapKey Question for Future-State Map  Will you build to a finished goods supermarket from which the customer pulls, or directly to shipping?  What is the takt time?  At what single point in the production chain will you schedule production  Where will you need to use supermarket pull systems in order to control production of upstream processes  How will you level the production mix  What increment of work will you consistently release  What process improvements will be necessary

32 Future-State Mapping ExampleFuture-State Mapping Example  ACME Stamping  Stamped-steel steering brackets  Hold the steering column to the body of a car  Two versions: Left-hand side and right-hand-side

33 Achieving the Future-State Map  Plan for achieving future-state map  Future-state map  Any detailed process-level maps or layouts that are necessary  A yearly value-stream plan

34 Breaking Implementation into Steps  Divide into value-stream loops  The pacemaker loop  Flow of material and information between your customer and your pacemaker process  Most downstream loop  Impacts all the upstream processes in the value stream  Additional loops  Between pulls  Each pull-system supermarkets separate loop

35 The Value-Stream PlanThe Value-Stream Plan  Shows:  Exactly what to do when, step-by-step  Measurable goals  Clear checkpoints with real deadlines and named reviewer(s)

36 Determine Starting PointDetermine Starting Point  Look for loops where:  Process is well-understood by people  Likelihood of success is high  Big bang for the buck

37 Improvement PatternImprovement Pattern  Develop a continuous flow that operates based on takt time  Establish a pull system to control production  Introduce leveling  Practice kaizen to continually  eliminate waste,  reduce batch sizes,  shrink inventory, and  extend the range of continuous flow

38 Conclusion  VSM cycle not one-time activity  Heart of day-to-day management  Serve the customer  Change in people

39 Homework  Develop Future State Map for TWI  Due: 03/02/09 Before class