AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]

Slides:



Advertisements
Similar presentations
Introduction to MS3: Media Investigation and Production.
Advertisements

AAE450 Spring 2009 Reliability Analysis Solomon Westerman, PM Week 5, 2/12/09 [Solomon Westerman] [PM] 1.
Harmony School of Political Science and Communication Presents: The 2012 International Fest.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring 2009 Week 9 [Solomon Westerman] [PM] Design Freeze on Thursday night!
AAE450 Spring 2009 Week 4 Presentations [Solomon Westerman][PM]
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
AAE450 Spring 2009 Week 8 – Ahhhhhh! Only un-reprinted C&H strip!
Week 13 Presentation Thursday, April 9 th, 2009 Saad Tanvir Propulsion Group 1 Lunar Descent – Hybrid Propulsion System Propulsion System Inert Mass Finals.
AAE450 Spring Gram Lander CATIA Design Communications Group Trans Lunar Phase Group Toy Ball Analysis Lander CATIA Design Joshua Elmshaeuser Communications.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Project Plan Review AAE451 – Team 3 October 2, 2003 Brian Chesko Brian Hronchek Paul Johnson (MIA) Ted Light Doug Mousseau Brent Robbins Emil Tchilian.
AIM Getting ready to launch!. What are we doing here? It’s time to make a plan! Actually, it’s time to make a unit! And then a plan!
Welcome to the Partners In Care Programme Websession Six 15 th April 2015 The session will start at midday Dr. Lynne Maher Director for
YEAR 11 – EXAM PERIOD Monday 8 th June - Friday 12 th June WEEK 5.
© M. Reber 10/17/2015 TWRT 62: 4 October 2012 A presentation for when the loudmouth teacher has no voice—All rejoice!
For your CSA final presentation... Okay for your group to just give me the hard copy of PowerPoint slides—no need to submit formal paper. Please do the.
1 February 8, :00AM TO 6:00PM 1 VP Career Development Collin Rich VP Case Competition Neetu Jindal VP FEMBA/EMBA Arthur Zhang.
Reduced Cost for Using The most important justification for the companies who resorts to outsourcing is petty expenses for searching. More of that companies.
Bell Work: Tuesday 8/11 1. Pick up a Bell Work paper from the front table. 2. Take a seat in your assigned seat from yesterday. If you don’t remember where.
Welcome to the Partners in Care programme Web session five 24 March 2015 The session will start at midday Dr. Lynne Maher Director for
Senior Trips 4/28 and 4/29  Must be inside the auditorium by 9 AM. Bus routes will run 25 minutes earlier.  Only students who turned in their permission.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
Public Speaking Course Details. Public Speaking School Year, Spring Semester Monday – 10:00 to 11:45 AM Wednesday – 2:00 to 3:45 PM Room B205.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
Enterprise Project & Resource Management (EPRM) How the Regional IT Infrastructure Program Management team uses MS Project Marc Fullman, IT Program Manager,
Motion of the Moon. Moon shines not by its own light but by reflected light of Sun  Origin of the phases of the moon Moon revolves around the Earth period.
STRATEGIC PLANNING Prototype 4 ALL RIDE FEEDBACK May 2015.
Pick up your Packet TODAY! Next WCT – April 4 th **Test begins at 9:00am. Please be in the office minutes prior.** Please keep in mind it may take.
AAE450 Spring 2009 Hydrogen Peroxide vs. Hydrazine Attitude Control Thrusters Brittany Waletzko Translunar/OTV Phase Week 5 Brittany Waletzko - ATT.
© K. V. Fernandez Tutorial One MKTG 201, First Semester, 2010, Week 3.
Senior Design SR22 Canard September 28, Meeting Objectives 1.Decide on deliverables for PDR (20min) 1.Establish a presentation for Tuesdays Trip.
What is the name of the strategy we are learning today? What does SIM stand for? How.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
The Problem Present the problem you intend to solve and how this problem is addressed today. Add only relevant details to describe the pain/problem.
April 17, 2017 Syllabus Oral 4 Feedback Demo Day
PM 598 RANK Education Your Life / pm598rank.com
PM 598 RANK Education for Service-- pm598rank.com.
Attitude, Lunar Transfer Phase
DS595/CS525: Urban Network Analysis Prof. Yanhua Li
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
[Solomon Westerman] [PM]
[Solomon Westerman] [PM]
Alternative Locomotion Concept Feasibility Study
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
[Solomon Westerman] [PM]
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
It’s Time for a Break!!!.
It’s Time for a Break!!!.
Timeline Week ___ ✓ Team Member Category Task Donors Board Staff
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Timeline Week ___ ✓ Team Member Category Task Donors Board Staff
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Presentation transcript:

AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]

AAE450 Spring 2009 Project Timeline 2/9/2008 TaskWeek 5Week 6Week 7Week 8Week 9 MWFMWFMWFMWFMWF PDR Complete Design Freeze (Mass/Power/Volume set) Draft Writing Evaluation of design alternatives (all phases) All design alternatives reach maturity and freeze Selection of final configurations Detailed analysis of X1, X2 Detailed analysis of final configurations

AAE450 Spring 2009 To-Do Today [Solomon Westerman] [PM] 1.Team Name Ideas Aura / Corona / Blue Moon (sponsorship?) T-shirts/Pins? 2.Presentations next week Order will be grouped based on relevance vehicle / plan on presentation to PM by Wed 3:00 PM Order will be given Thursday morning 1.Remember design requirements!!! Check PDR!!! Must be able to move up 45 degree solid slope! 90% communication until we land on Moon!

AAE450 Spring Break into the following groups (pick the one you are most focused in) TLI (Prop / Power / Strc /Ops ) Lunar Descent / Locomotion (Hopper) Locomotion (Toy Ball) Locomotion (Rover) Locomotion (Other) 2.Determine the following (15 minutes) – then short presentation, Q&A –Potential trouble spots with design –Sub-component largest potential for savings (M/P/V) –Work to be completed by Monday 8:00 PM