National Aeronautics and Space Administration Commercial Crew Program (CCP) Key Paradigm Changes Presenter Title Date of Presentation Philip McAlister.

Slides:



Advertisements
Similar presentations
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advertisements

SunComm 2011 Joyce Riquelme Manager Center Planning and Development Kennedy Space Center Enabling Commercial Space at Kennedy Space Center.
NASA Commercial Crew Program COMSTAC May 2011 Page 1 National Aeronautics and Space Administration COMMERCIAL CREW PROGRAM COMSTAC May 2011 E. Mango Commercial.
Accelerating Tomorrow’s Commercial Space Marketplace Commercial Crew Transportation System Michael Lopez-Alegria Commercial Spaceflight Federation 12 February.
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
Copyright © 2013 United Launch Alliance, LLC. Unpublished Work. All Rights Reserved. Civil Space 2013 Critical Challenges: Safety, Mission Assurance, and.
With each new President, a new administration is installed, new administrators, New direction, new priorities, and a cascade of changes within NASA and.
National Aeronautics and Space Administration Commercial Crew and Cargo Program Overview June 17, 2009 Doug Cooke.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
International Space Station: National Laboratory Development Brad Carpenter Space Operations Mission Directorate NASA Headquarters.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
NASA_G_O_02_09_05.ppt 1 National Goals and Objectives National Goal To advance U.S. scientific, security, and economic interests through a robust space.
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
Partnering & Strategic Alliances
Private Cloud: Application Transformation Business Priorities Presentation.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Buck Crenshaw, Program Element Manager, NASA-Wide.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status with a Focus on Insight / Oversight Approach to the COMSTAC.
CONSTELLATION National Aeronautics and Space Administration Ares Project Overview – Quality in Design Chris Cianciola Kenneth Crane.
NASA Fiscal Year 2016 Budget 9 April NASA Budget for 2016 In a presentation at the Kennedy Space Center in Florida, NASA Administrator Charlie.
Federal Acquisition Service U.S. General Services Administration OASIS One Acquisition Solution for Integrated Services General Services Administration.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Futron Corporation 7315 Wisconsin Avenue, Suite 900W Bethesda, Maryland Phone Fax ISO 9001 Registered Better.
1 PANEL: NASA Human/Systems Integration (HSI) Presentation: Human-Centered Design Capability David J. Fitts Chief, Habitability & Human Factors Branch,
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Software Engineering Lecture # 17
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Michael deLamare Requirements Management Program Functions R-9.
Suborbital Experiment Platform Presented to National Council of Space Grant Directors Executive Committee October 30, 2007 James E. Ball Spaceport Development.
Mario Busacca KSC Spaceport Planning Office March 2014 Transforming to a Multi User Spaceport.
Improving Integration of Learning and Management Systems Paul Shoesmith Director of Technical Strategy Becta.
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
Commercial Space Vehicles Lessons Learned Needs Workshop Bette Siegel, Ph.D. ESMD Bette Siegel, Ph.D. ESMD September 18, 2006.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Manager Date: May 15, 2008 Federal Aviation Administration Federal.
What is SBIR?  SBIR is a federal program where small businesses compete for up to $670,000 to research, develop and commercialize a new technology. 
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Jim Muncy on behalf of Jeff Greason, RLV Working Group Deputy.
Probabilistic Technology Initiative for NASA Pam Caruso Technical Assistant to the Director, Engineering NASA/Marshall Space Flight Center Presented to.
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
International Space Station (ISS) Mission and Program Integration Contract (MAPI) White Paper December 20, 2011.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
Title here Bullet point Jane A. Alexander, PhD Technical Consultant Doing R&D Business with the Federal Government.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
NASA Shared Services Center National Aeronautics and Space Administration Overview.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
1 SBIR/STTR Overview Wang Yongqiang. 2 Federal SBIR/STTR Program ‣ A +$2Billion funding program set-aside for small businesses seeking to early stage.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
1 June 10, 2004 Gary L. Wentz, Jr. Deputy Manager, MSFC Office of Exploration Systems MSFC Office for Exploration Systems.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Competitive and Collaborative Strategies.  General Environment ◦ Social, Technological, Economic, Ecological, and political forces  Task Environment.
Demonstrating Success: NASA Performance and Results Mike A. McNeill Environmental Management Division NASA Headquarters.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
Office of Infrastructure and Management Results-Oriented Government: The Executive Branch Management Scorecard January 25, 2006 White House Summit on Federal.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
National Goals and Objectives
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
AGM
TEMPO’s Commercially Hosted Payload Concept
OASIS One Acquisition Solution for Integrated Services
SUPPLIER PARTNERSHIP 2.
What is the Fusion Industry Association?
BUFFALO FUND: ACCELERATOR Full Proposal Presentation
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Low Power Wide Area Network.
Deep Space Exploration Requires the best from all of us
Presentation transcript:

National Aeronautics and Space Administration Commercial Crew Program (CCP) Key Paradigm Changes Presenter Title Date of Presentation Philip McAlister Director, Commercial Spaceflight Development NASA HQ October 14, 2011

Commercial Crew Program (CCP) The objective of the CCP is to facilitate the development of a U.S. commercial crew space transportation capability with the goal of achieving safe, reliable, and cost effective access to and from low- Earth Orbit and the International Space Station (ISS). The 2010 NASA Authorization Act established commercial crew as the primary means for ISS crew transportation. Together with the capabilities to explore deep space provided by the Space Launch System and the Multi-Purpose Crew Vehicle, NASA has a robust, complementary U.S. human space flight program Missions Demo/Test Flights Fiscal Year Design/Development/Certification 2

A Day In The Life… 3

Can NASA Develop a “Commercial” Capability? The key to developing a commercial capability will be the cost effectiveness of the resultant crew transportation system. NASA expects to achieve cost effectiveness through the adoption of several key paradigm changes during the system design and development. –Competition via multiple industry partners –Non-traditional contracting approach which enables contractor owned and operated designs –Efficient and effective government insight/oversight –Mature and stable requirements, managed at a higher level –Smart application of standards –Lean and agile program management 4

Acquisition Roadmap 5

Non-Traditional Contracting Approach The Integrated Design Contract includes several key features which will support cost effectiveness and commercial application: –Contractor-owned and operated systems –Performance milestone payments –Flexibility for the contractor to propose the specific design and development activities to meet NASA’s objectives –Flexibility for the contractor to define their own pace of performance to meet NASA’s objectives –No requirement for certified cost and pricing –Data rights aligned with commercial practices to maximize contractor retention of Intellectual Property rights –Balance of contract clauses, compliance documents, and deliverables to protect both industry and government investments 6

Level of Requirements CCP requirements will be controlled by NASA at a higher level than traditional programs – Lower level requirements controlled by the commercial partner, with NASA having insight – Allows the commercial partner to accelerate decision-making and control costs 7 Level 1 - Agency requirements (provide transportation for ISS) Level 2 - Program requirements (integrated system performance requirements and interfaces) Level 3 - Element level requirements (spacecraft, launch vehicle, ground systems, etc.) Levels 4, 5, 6, etc. - Requirements for subsystems, components, suppliers, etc. Commercial Crew Program Traditional Programs

Number of Requirements CCP has significantly reduced NASA-controlled requirements needing full verification –CCP has approximately 5% of the number of Shuttle requirements –Commercial Crew requirements deal with safety of all mission phases, whereas Commercial Cargo (COTS) deals only with ISS interfaces By controlling fewer, higher level requirements, the contractor is enabled to determine how best to meet NASA’s requirements. 8 ShuttleCommercial Cargo Commercial Crew 10,000 – 12,000 ~ 250 ~ 650 Number of NASA Controlled and Verifiable Requirements

Maturity of Program Requirements Prior to initiating the acquisition of integrated design contract(s), all CCP Level 1 and 2 requirements will be defined. –CCP will have zero missing or incomplete requirements, i.e., no “TBDs” Immature and/or undefined requirements have been a source of significant cost growth on previous government programs. –Undefined requirements introduce uncertainty into the design process and slows decision-making and progress –Designers are forced to make assumptions –Finalizing open requirements after contract award often results in expensive design changes and protracted contract negotiations 9

Standards Compliance with a large volume of unique NASA standards has been a source of increased costs and inefficiency. CCP addressed this by adopting a 3-tier approach to levying standards : –Type 1: Standards which must be fully met and verified (21) –Type 2: Standards which allow a partner to “meet the intent”, such as using their own standards as alternative (46) –Type 3: Reference standards, which do not require strict adherence or verification (45) By comparison, the Constellation Program had dozens of program requirements documents which levied hundreds of NASA standards, containing many thousands of verifiable “shall” statements. Orion alone had 75 must-meet NASA standards levied on its prime contractor. 10

Streamlined Program Decision-Making CCP will maintain only two formal boards, which will be the full extent of the activity the Commercial Partners will be expected to support. Traditional large programs have had a complex hierarchy of boards and panels structured by level and discipline –Typically, a decision package must flow through these forums, in parallel and series, which limits speed and efficiency –Agency institutional processes and technical authority processes (the appeals process) further complicate and slow the decision process 11 Illustration of the Constellation Program board and panel structure CCP Program Control Board CCP Technical Review Board

Lean Commercial Crew Program Office The Commercial Crew Program Office is deliberately lean, never planning to exceed 250 NASA civil servants with the majority of those dedicated to the Partner Teams –This is significantly smaller than other program offices for large, complex endeavors such as Shuttle operations and Constellation Program development 12 Partner Team (Sierra Nevada) Partner Team (Space X) Partner Team (Blue Origin) Partner Team (Boeing) Systems Launch Vehicle Spacecraft Launch & Recovery Systems Mission Planning & Integration Systems Engineering & Requirements Program Control & Integration Partner Integration Commercial Crew Program Office Technical Authority Partner Team (ATK) Partner Team (ULA)

Unique Approach to a Unique Situation Over the years, NASA has used a variety of a different approaches to overseeing and understanding the development of spacecraft. Each approach was tailored to meet the specific needs of the program. Within the context of CCP, the following key ingredients are present which enable the adoption of these key paradigm changes: –No technology breakthroughs were required – we are not pushing the technological state of the art by flying people to and from low Earth orbit –Very real prospect of other customers beyond NASA – spaceflight participants and sovereign clients are existing markets with substantial growth potential –Government foundational customer base – the International Space Station represents a long term, repeatable market –Strong industrial base – many U.S. companies have the capability to develop safe and reliable crew transportation systems. 13

Summary The purpose of contrasting NASA’s traditional and non-traditional approaches does not mean one is better than the other. Each approach is appropriate for the type of program required. –For technically-ambitious, one-of-a-kind programs where NASA is the only customer and production is limited to only one (or a few) of the systems, then a traditional approach is more appropriate. –For more commercial-like programs that feature the key ingredients mentioned previously, the approach being followed by the CCP is more appropriate. The combination of a unique contracting mechanism and an innovative technical approach should enable the development of a safe, reliable, and cost effective crew transportation system for use by a wide range of public and private users. 14