EVLA Siting Logistics Sean Dougherty, HIA Chris Langley, NRAO 1DVA1 Meeting at NSFApril 15-16, 2010.

Slides:



Advertisements
Similar presentations
7. Facilities layout.
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
BSA Health System, May 2009 Next Slide Previous Slide BSA HEALTH SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
Good hygienic practices
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
Health and Safety Manual Section C3 Cryogens. Cryogens  Fluids which at ambient temperature cannot be liquefied solely by pressure  Include liquid oxygen,
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
Topic C1 Superstructures - walls
EVLA Fiber Selection Critical Design Review December 5, 2001.
Strength Training and Conditioning Facilities Day 27 Reference: Earle and Baechle - Chapter 24.
Product Evaluation ACT Objective O Emphasize the importance of proper product evaluation and selection O Develop insight into effective procedures,
SJD/JJAdvisory - Sept Fiber Phase Stability Status Steven Durand & Jim Jackson September 8, 2003 National Radio Astronomy Observatory a facility.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
1. 1. Overview: Telecommunications Project  Planning and implementation (2007-today) 2. Discussion: Proposal to Improve Infrastructure  Upgrade horizontal.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
Essential Standard 2.00 Understand the nature of business. 1.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
For Discussion Purposes Only Digital 395 August 2-5, 2011 Vendor Overview for Electronics Requirements.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Utility Engineers, PC.  Generation  Transmission  Distribution.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
Module 9Slide 1 of 25 WHO - EDM Premises Part One Basic Principles of GMP Part One, 11.
HEALTH & SAFETY AT WORK ACT (HASAWA)
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Welcome to Odyssey Industrial Systems. 2 Odyssey Today 18,000 Square feet of leased space in two buildings Outsourcing powder coating today; in-house.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Wireless Networking Devices. wireless LAN adapter cards wireless access Points wireless bridges wireless routers.
Global Project Cargo Solutions brunelprojectcargo.co.uk.
Hot Work Permit Osan AB Fire Emergency Services.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Future LBO Developments
Planning for Proto-DUNE PD Installation and Cabling at CERN
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Electronics and Controls
Generic Site Preparation
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
CP220x The Industry’s Smallest Ethernet Controller
Junction Boxes for KM3NeT
Sapphire FULL BUILD & REFURBISHMENTS
Fiber Installation Preliminary Design Review
EVLA NSF Mid-Project Review System / Antenna Status
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Jim Cordes Cornell University
EVLA NSF Mid-Project Review System / Antenna Status
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
Sapphire FULL BUILD & REFURBISHMENTS
Value of contract: Length of contract: Contract start date:
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
Presentation transcript:

EVLA Siting Logistics Sean Dougherty, HIA Chris Langley, NRAO 1DVA1 Meeting at NSFApril 15-16, 2010

The following discussion will examine the site challenges associated with testing a 15 meter (or to a lesser extent, 12m). The EVLA site has been discussed as a strong candidate for these tests. Involvement of the NRAO in the DVA1 project is presently being negotiated. April 15-16, 2010DVA1 Meeting at NSF2

Siting Concerns Antenna Fabrication Building Antenna Pads / Interconnections Existing Key Subsystems Available Technical Support Safety Visitor-friendly Location DVA1 Meeting at NSF3April 15-16, 2010

Antenna Fabrication Building Dish cannot be manufactured in the open air – Dish mold (heavy) requires a concrete floor – Controlled air temperature required Safe mold storage temperature is 5 ⁰C to 35 ⁰C, with minimal fluctuation Resin infusion may occur between 15 ⁰C and 35 ⁰C – Clean environment required Space required to manufacture a 15m X 18m dish 1 – 55m L X 22m H X 10m ceiling apex, TBC – 19m L X 10m H opening – Fully outfitted Lights, floor, HVAC, ventilation, work and storage, … April 15-16, 2010DVA1 Meeting at NSF4 [1] R. Hellyer, “Composite Applications for Radio Telescopes (CART): Portable Factory for Fabrication of Composite Dishes,” NRC-CART Memo #0026, December 24, 2009.

Antenna Fabrication Building Cost to provide a suitable building could be significant (~ $500K) Existing EVLA structures – Do not fulfill basic requirements – Are unavailable due to EVLA construction schedule Is a building capable of housing full production necessary at this time? April 15-16, 2010DVA1 Meeting at NSF5 [1] R. Hellyer, “Composite Applications for Radio Telescopes (CART): Portable Factory for Fabrication of Composite Dishes,” NRC-CART Memo #0026, December 24, 2009.

Antenna Pads / Interconnections Seventy-two available EVLA pads – 12 Core SMF cable 2 ethernet, 2 LO, 1 Data Transmission, 7 spares – 208 Vac 3 Ø, 60 Hz, 160 A/Ø – Antenna may occupy different locations One available ALMA Test Facility pad – SM Corning Freedom 12 fibers – 208 Vac 3 phase, 60 Hz, 250 A/Ø & 400 Vac 3 Ø, 200 A/Ø – Does not allow for multiple DVA1 locations – Requires limited re-work DVA1 will require a metal frame adapter regardless of pad type April 15-16, 2010DVA1 Meeting at NSF6

EVLA Pad Fiber Interface Pad Box – houses 12 terminated fibers Each Antenna travels with its own umbilical cord. April 15-16, 2010DVA1 Meeting at NSF7

Existing Key Subsystems Slots are available in WIDAR correlator for data receiver cards. LO signals are available at all pads. Monitor and Control System may be expanded to accommodate DVA1. April 15-16, 2010DVA1 Meeting at NSF8

Available Support Machine shop Cryogenics group HVAC expertise Heavy lifting equipment & operators Additional local expertise April 15-16, 2010DVA1 Meeting at NSF9

Safety EVLA Safety Officer present on site Established safety procedures Safety equipment available April 15-16, 2010DVA1 Meeting at NSF10

Visitor-friendly Location NRAO Guest House along with ample hotel rooms in Socorro Restaurants and shopping in area Tourist venues in the immediate area Daily scheduled shuttles to/from the site April 15-16, 2010DVA1 Meeting at NSF11