The Team Industrial Engineers Andrew Chorney (Project Manager) Tim Bukowski Jason Hess Mechanical Engineers Michael Goldberg (Lead Engineer) Martin Martinez.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
DEVELOPING A TECHNOLOGY PROJECT IN STUDENT AFFAIRS A Guide to the Process Paul Schantz November, 2010.
P09011 Object Recognition Mystic Design Review February 20, 2009.
Technical Communication and the RosE-Portfolio Documenting and Reflecting on the Development of Your Communication Skills.
Design Project Management Final Presentation Zachary Kirsch 15 November 2012.
P09011 Object Recognition Detailed Design Review February 12, 2009.
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
Andrew Chorney- Project Manager Michael Goldberg- Lead Engineer Timothy Bukowski- Industrial Engineer Mahmudul Khan- Electrical Engineer Martin Martinez-
© Nintendo Game Document Game Development - Spring
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter
EWF – Water Supply Proposal Spring 2003 Presented by: Meaghan O’Neil Amy Pickering Martin Kistenmacher.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Computer Science ABET Visit Update November 8, 2003.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Capstone Design Course for NASA ESMD
The R&M Task Group mandate is to: Develop specific recommendations on how social housing project reporting and monitoring could be improved and made more.
Planning a Trade Show - Seven Steps 1. Define Goals & Objectives 2. Select the Show & the Space 3. Set a Realistic Budget 4. Design the Booth 5. Train.
Electrical Engineering Capstone Courses EE-4BI6 Electrical and Biomedical Engineering  Dr. Hubert deBruin EE-4OI6 Electrical and Computer Engineering.
Assessment Cadre #3: “Assess How? Designing Assessments to Do What You Want”
Chapter : Software Process
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
New Advanced Higher Subject Implementation Events
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
4.2 Develop Project Management Plan
The Differences Between the Project Manager and the Systems Engineer Kasse Tim Kasse Kasse Initiatives LLC +1 – USA +49 (0)
IMGD 1001: Game Design Documents
Bob Kois PMP MBA Project Management Basics Scope Management EPICPM ®
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Applying “Engineering Processes” to solve problems Learning to apply project management systems Tools to manage time and resources Accessing information.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Senior Design Laboratory Design Dec 05-01
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
Write On! Your Course Outline. Pedagogy Unbound Series Facilitated by: Deborah Richards Florence Daddey.
The Future of Immersive Virtual Environments: issues and challenges Dr. Xiangyu Wang Acknowledge to Dr. Doug Bowman’s lecture notes.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
PRIJ, 3030 January the 22nd Assessment. Guiding questions… What are the implications for your general practices around planning and assessment? How will.
Process: A Generic View
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
eMerger Integration Planning
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
IMGD 1001: Game Design Documents
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
Luminaire Vibration Test Apparatus: P14471 Team MemberMajor Brett Billings, Team LeadIndustrial and Systems Engineering Nicholas Greco, Lead Mechanical.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
P15051: Robotic Eye Final Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Prevent Teach Reinforce PTR and PTR-YC
“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” Systems Design Review P13465 – Water Table.
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
Technical Project Manager Scope of Work Erler & Kalinowski, Inc. Michael Steiger Andy Safford.
Writing Assignments in Mechanical Engineering Anne Parker University of Manitoba A. Parker, CASDW, UVic,
Name Role & Responsibility Kyle Mininni
Project Management PTM721S
Final project review presentation MSD P Visual and Auditory Object Recognition testing apparatus & objects Andrew Chorney- Project Manager Michael.
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Project Readiness Review P10029 – Air Muscle Artificial Limb
Optical Stage Redesign
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

The Team Industrial Engineers Andrew Chorney (Project Manager) Tim Bukowski Jason Hess Mechanical Engineers Michael Goldberg (Lead Engineer) Martin Martinez Electrical Engineer Mahmudul Khan Faculty Guides John Wellin Risa Robinson Customer Dr. Caroline Delong

Project Description Design an apparatus that will be used to present three- dimensional objects to a beluga whale. Develop a functioning match-to-sample procedure. Design 3-D Objects. A sample object is shown to the whale, then the sample object is removed and finally three choice objects are presented to the whale. The whale’s task is to select the choice object that matches the sample. Tool for research with Beluga whales at Mystic Aquarium. Assess the Beluga whale’s visual and auditory perception.

Key Challenges Mystic Aquarium located in Connecticut Team communication Budget and Time Salt water Objects must be immune to rust Durable for up to 12 months Limited space inside of aquarium Portability of apparatus and objects

Expectations from Detailed Design Review Feedback about feasibility of design Issues that could prevent success of project Comments on mechanical and electrical system design Customer final approval of design direction Design, budget, schedule Critique of technical content of design Component selection