Report from TB CB, July 2 nd 2010 W. Riegler. TF – 1.7.10 P2 issues, shutdown plans2 Next LHC technical stops Dates: 19 th to 22 nd July 30 th August.

Slides:



Advertisements
Similar presentations
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
DCal Meeting
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
Requirements from the experiments D. Macina (EN/MEF) Conceptual Design Review LHC Phase II Collimation, CERN April Many thanks for input and discussion.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
André Augustinus 9 October 2006 Interlocks update.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
With a lot of help from Reine Versteegen, John Jowett, Richard Jacobson, Burkhard Schmidt, Gilda Scioli, Werner Herr CERN-LHC * IP5 IP1 IP8 Spectrometer.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
DCal Insertion Tooling 24/02/ DCal Insertion Tooling DCal Insertion System feature following main components 1. One rotator : cylindric welded structure.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
TC meeting P2 planning wks 3&4 A.Tauro
DCal-ALICE integration and installation plan and status A. Tauro.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
First collisions in LHC
LS1 planning meeting
The LHC - Status Is COLD Is almost fully commissioned
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
Summary Friday h38: Ramp down and pre-cycle.
Spectrometer Operation in IP2 & 8
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tuesday 22nd January - morning
Summary of Week 16 G. Arduini, J. Wenninger
Week 35 – Technical Stop and Restart
Friday Morning 7:30 injection for fill 2908
Saturday 7th May Sat – Sun night
Another Immortal Fill….
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Review of hardware commissioning
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Report from TB CB, July 2 nd 2010 W. Riegler

TF – P2 issues, shutdown plans2 Next LHC technical stops Dates: 19 th to 22 nd July 30 th August to 2 nd September 18 th to 21 st October The new scheme foresees 4 days of stop every 6 weeks P2 water interruption – 19 th July 1 day interruption of cooling (chilled, mixed water), affecting whole P2, in order to install flowmeters on chilled water lines. Need to stop cooling plants, racks, DAQ, DCS,… This action is crucial to monitor the total water consumption, and to clearly address the question whether we need to improve the P2 cooling power.

3TF – P2 issues, shutdown plans L3 cooling test Layout of distribution network Settings: T in = 20°C T screen = 17,4°C Problem: if hot/humid weather, the primary water goes to 26-27°C → overconsumption chilled water → instabilities detector cooling units Primary water Demineralized water L3 Tin=20°C Tscreen=17.4°C 6°C 11°C 24°C 34°C 24°C Detector cooling units 6°C 11°C 6°C Tout=35°C UX-25Surface Chilled water

4TF – P2 issues, shutdown plans L3 cooling test Changing the inlet temperature Increased inlet temperature: T in = 22°C T out increases of 2°C (37 instead of 35) By operating (manually) the heat exchanger of the thermal screen, we have achieved T screen = 17,4°C Primary water Chilled water L3 Tin=22°C Tscreen=17.4°C 6°C 11°C 24°C 34°C 24°C Tout=37°C Detector cooling units 6°C 11°C 6°C UX-25Surface Demineralized water

TF – P2 issues, shutdown plans5 The current plan is to stop the LHC for 9 weeks, i.e. from December 6 th 2010 to February 4 th This period will be sufficient to provide standard maintenance of the detector and infrastructure and to fix several problems known to this date. However, this is not enough to install further TRD and/or EMCAL modules, which would require 10 to 11 weeks, if we work in two shifts and through Christmas. Trying to “squeeze” this plan into 9 weeks is not possible, because the 10 weeks are already compressed. In addition, lifting the space frame is a risky operation that should be done carefully. On the other hand, it should be possible to remove the PMD, repair and reinstall it. 2009/2010 end of year technical stop

TF – P2 issues, shutdown plans6 Update on new storage building Our request is the following: –2 nd floor bld. 3294: 18 offices –New storage building: with lockable slots for each detector/group to store small objects (250m 2 ). Preferred installation area: close to SX2 GS will gradually remove the barracks on site. –Consulting firms to get rid of the 4 red ones During long shutdowns we might need – as we did in the past – to install barracks (SPIE, sub-contractors,…).

7TF – P2 issues, shutdown plans New delphi frame table P.Lenoir

8TF – P2 issues, shutdown plans New delphi frame table P.Lenoir

André Augustinus Perturbations since last ALICE week  Power glitches (7) and power cuts (3) Glitches are mainly due to thunderstorms Typically drop of 20-30% on 400kV into CERN for 2-3 cycles CERN wide, usually loss of beams ALICE (typically): Dipole trip, detector equipment trip Cuts have different causes and different extend Dipole transformer: limited to P2 18/66kV transformer north area: cern-wide Rack in CR3: part of DCS and CTP ALICE Technical Forum1 July 2010

André Augustinus Magnets since last ALICE week  Solenoid tripped 7 times: Failing temperature sensor (2) Stop of cooling Power converter fault (2) Power cut (2)  Dipole tripped 10 times: Power glitches/cut (5) Short circuit on power converter Power converter fault (2) Stop of cooling During cooling test ALICE Technical Forum1 July 2010

01 2 3

89 C. Bortolin – R. Turrisi Freon flow in SPD always changes slightly whenever the plant stops and is restarted. Situation did not change significantly in the last months. Currently 97/120 Halfstaves ON

Machine Luminosity increasing in steps – reached 7-8∙10 29 cm -2 s -1 – ‘background’ increases accordingly Several weeks to commission nominal bunches Goal is to achieve 1 pb -1 by end of year 4 weeks of HI running (+ 1 week commissioning) TF - RC news

ALICE and nominal bunches At present nominal conditions  ≈ 1.5 – Bunch charge = –  * = 3.5 m – average emittance = 5 mm mrad Trigger rate kHz, but saturates at 20 kHz In order to eliminate pile-up (  = 0.05), collisions at IR2 with displaced beams (s ≥ 3.8) were tested yesterday ! – Stability of beams and luminosity to be monitored TF - RC news

TF - RC news Integrated Triggers and Luminosity

Collimation scheme in IR2 Low β TCT VB TDI (V)TCDD (V) TCTVB TCTH TCLI (V) D2 IP2 D1 Beam 1 Beam 2 Beam 1 ZN ZP ZP ZN not to scale TCTH Movable collimators for low  triplet protection in case of peaks in the secondary beam halo due to transient drops in the beam lifetime: TCTH (horizontal plane) TCTVB (vertical plane). It is a special single pipe design since no space for a standard TCTV between the ALICE ZDCs and D2 Movable collimators for protection at injection (only vertical plane) N. De Marco17Technical Forum, 1 July 2010 Side ASide C TCT Collimator partly shadows the ZDC – negotiations with the machine to change the collimator position

N. De MarcoTechnical Forum, 1 July Reconstructed Centroid - data TCTVB effect - pp 7 TeV β* = 2m -> TCTVB gap: 15.1mm side C, 17.2mm side A Red boxes->projected shadows at ZDC location (22.9mm sideC, 26.4mm sideA) Platform at nominal positions : ZNC 178 mm, ZNA 182 mm ZNC ZNA Run ,Trigger CINT1B-ABCE-NOPF-ALL, L3/Dip off/off -> Vert. Beam Crossing Angle 0 μrad 3.5 cm (half dimension)

July 1, 2010TB Meeting, T.Awes, ORNL 19 ALICE EMCal SM US Scope: –7 2/3 Super Modules 2 SM installed 2/3 -> DCal EU Scope (France, Italy): –3 Super Modules 2 SM installed 4 SMs installed and fully commissioned in ALICE 90 o and 70 o

July 1, 2010TB Meeting, T.Awes, ORNL 20 EMCal Production Status US: 7 EMCal Super Modules –SM No. 1 and 2: Installed in ALICE –SM No. 3: Complete at CERN –SM No. 4: At Grenoble. Ready in July –SM No. 5: Ready ship to CERN before end of July. 16 strip modules at Yale 8 strips are ready to ship from WSU to Yale –SM No. 6: All modules are complete 12 strip modules are in Europe (Grenoble-Catania-Nantes) WSU will ship 12 stripmodule before the end of July –SM No. 7: 20 modules are complete. Will ship 24 stripmodule to Grenoble early September EU: 3 EMCal Super Modules –SM No. 1 and 2: Installed in ALICE –SM No. 3: Complete at Grenoble Remaining 6 SMs will be ready to install by late 2010.

July 1, 2010TB Meeting, T.Awes, ORNL 21 PHOS+DCal Acceptance  x  = 1.4 x 0.7 New DCal super modules = 2/3 EMCal SM DCal+PHOS+CPV+VHMPID PHOS modules VHMPID modules New Rails & Support

July 1, 2010TB Meeting, T.Awes, ORNL 22 DCal Status DCal-PHOS-VHMPID common structure –Funding to start support structure and rail fabrication - OK –Design Review - complete –Raw material order May 2010 –Orders for Rail materials May 2010 –Orders for Cradles July 2010 –Support Structure available January 2011 DCal Modules production (Asia, EU, and US) –Design : exactly same as EMCal –Funding approved –Main component orders underway – Production to start in July 2010 (earlier in Tsukuba) – Assembly of first DCal Super Module foreseen September 2010 –First 3 super modules (C-Side) ready February 2011

July 1, CPV detector 1 st module installed in 2012

July 1, 2010TB Meeting, T.Awes, ORNL24 CPV detector 1 st module installed in 2012

TF – P2 issues, shutdown plans25 TPC Trips

TF – P2 issues, shutdown plans26 TPC Trips

TF – P2 issues, shutdown plans27 TPC Trips

TF – P2 issues, shutdown plans28 TPC Trips