Working group report T500 and E203 Armin Reichold 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 1.

Slides:



Advertisements
Similar presentations
Longitudinal Bunch Profiling at FACET using Smith Purcell Radiation The cheap and cheerful way of profiling R. Bartolini, N. Delerue, G. Doucas, S. Hooker,
Advertisements

X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 4/3/06.
Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Software Development, Programming, Testing & Implementation.
The TIMING System … …as used in the PS accelerators.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
 Timing between LabVIEW 7.1 and phased array hardware  Designing inexpensive yet accurate variable delay lines  Controlling 8 serial inputs through.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
BPM System Status P. Cameron 13 Aug 07. Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
TK Dry Gas System Operation  System overview  Dry Gas Consumption  Interlocks and thresholds  Documentation  Operational model  Final comments.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
Why A Software Review? Now have experience of real data and first major analysis results –What have we learned? –How should that change what we do next.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Introduction to LabVIEW
Management Sunspots Quality Emittance IP3 Aberrations Grounding CSR APE Accelerator Physics and Engineering Providing a new paradigm for a forward-looking.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
TREND DAQ BASIC PRINCIPLES … Antennas DAQ ADC Trigger condition: Max > N.σ ??? First level trigger: Nant > 3 antennas ? -By antenna : - 1 data file (Nevent.
+ SwissFEL Matlab Toolbox ADAQA used for Emittance Measurements Bolko Beutner, Rasmus Ischebeck PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics.
MTA Data Acquisition System K. Yonehara APC, Fermilab 1/14/15MTA DAQ, K. Yonehara1.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
LCLS Commissioning & Operations High Level Software
Operations Machine Simulator.
RF acceleration and transverse damper systems
ATF/ATF2 Control System
Data Acquisition Systems
Need for Alignment Position of off-momentum proton w.r.t. beam
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Computing Infrastructure for DAQ, DM and SC
LCLS Commissioning & Operations High Level Software
SLAC - End Station A ILC testrun – April '06 ...
A Virtual Implementation of VELA (CLARA)
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
High Level applications development status
VELA – CLARA AP (Draft) Goals Software Goals
High Level Physics Applications for LCLS Commissioning
Beam Synchronous Acquisition on IOC
Linac Diagnostics Commissioning Experience
Online Phase Space Tomography
Breakout Session: Controls
Presentation transcript:

Working group report T500 and E203 Armin Reichold 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 1

Wish list for FACET for user run (E203) Reliable and calibrated beam data (BPM TMIT’s vary among themselves and from toroids) Clear written instructions which instruments give reliable data, how to access them and what their calibration is or how it can be found Layout of facet with actual survey positions of instrumentation and experimental apparatus Toroid data should be available in EPICS and EPICS archive Access to EPICS archive from outside SLAC (so far only via facet-srv01) Users should not write their own beam data logging system. This should be central EPIC archive. Need help with this. Probably in form of software and hardware. Access routines to EPICS archives from user code (not just from interactive tool such as FACET home) to be provided by SLAC 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 2

Wish list for FACET for user run (E203) EPICS tutorials and examples Beam profiles in LI20 to be taken under user control and archived If “SLAC” want to use E203 in our absence we need a new grating and filter control system with digital controls (all analogue & manual now). Do we need to mover our DAQ-control from matlab to EPICS. Need to collaborate on this. Beams at E203 circular or elliptical with dy>dx and a method for measuring/extrapolating the beam cross-section at our location from wire scans Alternative method for measuring grating approach to beam. Now we monitor backgrounds and “inch” forward until “it hurts”. Maybe could use pick-ups on gratings? Need advice and collaboration. IR background reduction using coated beam pipes Moving DAQ below the table (needs tray fixed to bottom of table, cable could not reach floor level) 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 3

Joint list T500 – E203 Both experiments will define common bunch length variable by using time in which 1-sigma and 90% charge is contained T500 will use temporal reconstruction based on same phase reconstruction algorithm DAQ and data storage – Initially aim to write both of our data into EPCIS or other common platform in offline mode but have no idea yet how to do this. – Need to be able to do Beam Synchronous Acquisition (BSA) First step: time server to synchronise better than 10Hz Real BSA – Clarify the relation between beam pulse ID in EPICS and SCP Both experiments would like to have burst mode (single bunch) Humidity, temperature and pressure measurements on T500 and E203 experiments Preparation for dry air volumes around experiments to reduce absorption. Dry air supply, “tent or box” 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 4