Fiber-Reinforced Polymer (FRP) Composite Bridge Decking Project Team Award - $460,305 BridgeComposites, LLC Integrated Materials and Applied Computing,

Slides:



Advertisements
Similar presentations
Systems Implementation and Operation
Advertisements

Roofing Barrier System AC100 RF Best Coat  SCS Coatings, LLC 8 Timberbrooke Drive, Hopewell, NJ
Fiberglass Pads and Mats for Heavy Equipment
The future of automated construction excellence. Industry Trend More for Less Metal Construction Components Competitive Advantage Business Concept Process.
New I-65 Interchange at Worthsville Road Welcome!.
Computer Integrated Manufacturing CIM
Facilities and Construction: Did you know your GPO can help?
Congestion Pricing: Competitive Locational Prices of Power Stoft (2002)
IFPAC-NeSSI Report.ppt; 29 January 2008; Slide 1Siemens Energy & Automation, Inc. Criteria for Design and Specification NeSSI Issues Presentation to IFPAC.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Operations Management Design of Goods and Services Chapter 5
Business Data Communications & Networking
Introduction to International Business Discussion Section April 6, 2007 Sanny Liao.
Operations Strategy: Defining How Firms Compete
CONCRETE PROTECTION MATERIALS & TECHNIQUES CE 402 DONE BY AHMED AL-HAWAS FAYEZ AL-SAIKHAN.
SERVICE EVALUATION APPROACHES AND COMPARISON WITH THE USE OF ITIL Matthew Fazo BIS 461.
Copyright by Paradigm Publishing, Inc. INTRODUCTION TO BUSINESS CHAPTER 6 Entrepreneurship and Business Planning.
FRP Reinforcement of Concrete
Fiber-Reinforced Polymer (FRP)
A case study of Quality Standards implementation in TASNEE Company ISO 9001: 2000, ISO 14001:2004 & OHSAS By Abdulgader Alharthi.
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications.
Designing Goods and Services and Process Selection
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Advanced Polymer Composites in the Civil Infrastructure
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Complying with Boiler MACT using CHP as a Manufactured Product Presented by: George Voss, President Sustainability Business Management, LLC
Operations Management Class 20 Tuesday 11/8/11. Operations Management (OM) The development and administration of the activities involved in transforming.
automated Vehicles and transportation system sustainability
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum Cambridge -13 September 2005.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Business Plug-In B4 Enterprise Architectures (on OLC)
LEAGUE OF CITIES & COUNTY GROUPS ProcureAZ The State of Arizona’s eProcurement & Sourcing Solution For Public Entities Statewide 1.
Products and Services Overview. Rev Core Competencies.
Learning Objectives To learn the methods that a firm might employ to successfully achieve each of the four building blocks of competitive advantage.
Chapter 14 Copyright ©2012 by Cengage Learning Inc. All rights reserved 1 Lamb, Hair, McDaniel CHAPTER 14 Supply Chain Management © iStockphoto.com/Robert.
Designing Goods and Services and Process Selection
Bridge Girder Alternatives for Extremely Aggressive Environments Project Manager: Will Potter, P.E. - FDOT Research Team: Jeff R. Brown, PhD, Assoc. Professor.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
PRODUCTION AND OPERATIONS MANAGEMENT OBJECTIVE: DESCRIBE OPERATIONS MANAGEMENT PLANNING ISSUES INCLUDING FACILITY LOCATION, FACILITY LAYOUT, MATERIALS.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
Kansas DOT Research Project Implementation Presented By Rick Kreider (Chief of Research) Created By Susan Barker (T 2 Engineer)
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 1-1 JAMES R. STOCK  DOUGLAS M. LAMBERT STRATEGIC LOGISTICS MANAGEMENT.
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
SYSTEMSDESIGNANALYSIS 1 Chapter 13 The Systems Proposal Jerry Post Copyright © 1997.
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
ME 4182 Mid-Term Presentation The Likus Group 6/21/00 Philip Reale, Group Leader Matt Berrell Justin Disney Anthony Godfrey Gwyneth Smith Lisa Smith The.
Dual-Tower Lift Scaffold Nasif Arefin, Arshdeep Dhaliwal, Saheb Dhody, Dhruba Hasan, Kayla Musalem, Ziwei Wang, Maria Xirui Xie.
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
Supply Chain Management Chapter Definition of Supply Chain Management Supply Chain Management refers to the effort to coordinate suppliers, manufacturers,
IS Development Methodology
CONCRETE PROTECTION MATERIALS & TECHNIQUES
Pull Manufacturing and Just In Time
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
Supplier Partnership Supplier Partnership is the discipline the strategically planning for, and managing, all interactions with third party organization.
SUPPLIER PARTNERSHIP 2.
Automated Oiling System
The Evolution of Building Methods Traditional Methods
Enterprise Resource Planning (ERP) System
The GridSolar Project Presentation – NRCM January 21, 2010
Lecture 10 PROCUREMENT Ferdinand FASSA.
Materials Innovation Hub Challenge Martin Richardson
Building Construction
Title of Presentation dd.mm.yyyy 2-in-1 Product Solution Temporary & permanent application with one product DELTA BLOC - We develop.
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
NIST TE Challenge Phase II
Fiber Reinforced Polymer Systems
Presentation transcript:

Fiber-Reinforced Polymer (FRP) Composite Bridge Decking Project Team Award - $460,305 BridgeComposites, LLC Integrated Materials and Applied Computing, Inc. Penn State University LeTourneau University XC Associates, Inc. Allegany County, NY 1

Barriers to Implementation of Current FRP Deck Systems The initial cost is higher than traditional materials All current systems are proprietary, hindering the ability to obtain competitive prices and standard methods There have been some issues with the durability of wearing surfaces There are relatively few suppliers 2

Benefits of the Proposed Deck System Hybrid nature makes efficient use of materials A lightweight deck replacement can improve the load capacity of an existing bridge Quality can be enhanced by manufacturing in a factory environment using ISO-9001 criteria Life cycle cost of the bridge can be reduced Ease of installation Automated fabrication process can reduce manufacturing costs and improve cost-competitiveness 3

Benefits of the Proposed Deck System Improves long-term durability through the use of corrosion-resistant materials Use of modular components fabricated away from the project site reduces exposure time during installation to enhance motorist and worker safety decrease traffic congestion Non-proprietary system 4

Project Deliverables Improved materials and manufacturing methods that reduce cost Demonstration of connection details that will provide long term durability Documentation of how to install a functional wearing surface 5