Daniel Sayle, Patrick Byrne, Sarah Kemp, Anne Mcleland, Katie Thompson 10/5/2010 TEAM MUNCHIES CRITICAL DESIGN REVIEW Fall 2010 Rev B.

Slides:



Advertisements
Similar presentations
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team Space Jam Conceptual Design Review Ben Azlein, Bridget Chase, Paul Guerrie, Taylor King, Shane Meikle, Megan Scheele, Jamie Usherwood 09/16/10 Fall.
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Dynamo Team Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Launch Readiness Review.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
The Wright Stuff Conceptual Design Review Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata September 20th 2011 Fall 2011 Rev.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Daniel Sayle, Patrick Byrne, Sarah Kemp, Anna McLeland, Katie Thompson 11/2/10 TEAM MUNCHIES LAUNCH READINESS REVIEW.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata October 6, 2011 The Wright Stuff Conceptual Design Review.
Team Dionysus Critical Design Review Alijah Smith, Chris Koncilja, Elise Kowalski, Josh Tiras, Mike Beach, Becca Seigel 10/06/09.
Tres Volcanus “Team V” Conceptual Design Review Community College of Aurora Adam Kim Ian Jones Dani Strohmier 06/10/10.
Daniel Sayle, Katie Thompson, Anna McLeland, Sarah Kemp, Patrick Byrne 11/30/10 TEAM MUNCHIES FINAL PRESENTATION.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Amelia Weller, Erick Chewakin, Will Hakes, Emma Mossinger, Brendon Barela, Jason Schelz, Ethan Long October 5, 2010 TEAM MATE CRITICAL DESIGN REVIEW Fall.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Ryan Olin, Austin Granger, R.J. Kakach, Seth Frick, Joey Senkyr AEM /24/09.
Team Pegasus MSF: BalloonSat SatElysium Conceptual Design Review Jordan Burns Miranda Link Brenden Hogan Cody Spiker Chris Dehoyos Hemal Sewal September.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Skillz That Killz Critical Design Review Jocelyn Mulkey, Jess Davidoff, Kaitlyn Zimmitti, Taylor Smith, Travis Dowdy, Hunter Hoopes October 8, 2009.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A/B
Conceptual Design Review Brandon Scott Bosomworth Edgar Alejandro Flores Vicki Wei Hsu Filip Maksimovic Scott Michael Randolph Jonathan Michael Taylor.
Mission Statement... The Space Wolverines will;
S^3 Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Launch Readiness Review
Team Mate Conceptual Design Review
Team Munchies Conceptual Design Review
Team SCREAM Launch Readiness Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Panoramic Rays Critical Design Review
Presentation transcript:

Daniel Sayle, Patrick Byrne, Sarah Kemp, Anne Mcleland, Katie Thompson 10/5/2010 TEAM MUNCHIES CRITICAL DESIGN REVIEW Fall 2010 Rev B

MISSION OVERVIEW - The purpose of the balloon satellite Astraios is to test whether or not red algae can survive the harsh environment of near space at an altitude of approximately 30,500 meters or 100,000 feet. - Possibility that our research can be applied to other extreme environments such as high mountains, the polar regions of the Earth, and the environment in which the first extra terrestrial settlements will be created when the terra-forming of Mars takes place.

OVERVIEW, CTD. The Results of this Mission, depending on whether the samples survive the flight, can provide plausible doubt to the possibility of marine life forms in high pressure environments or even extraterrestrial ones. Due to algal blooms supplying the majority of breathable Oxygen to life under water, the survivability of our samples will provide insight to the possibility of oxygen breathing marine life (unicellular or not) in other atmospheres or hostile environments.

HYPOTHESIS Due to the rarity of ice specialized algae, our group is using a very common strain of red algae for the flight. This algae is relatively self-sustaining, and able to live without high amounts of sunlight or warm temperatures. Therefore, our samples are most likely to survive in a standard temperature and pressure environment. Once pressure and temperature begin to decrease as elevation increases, we expect the chances of survival of the algae will decrease exponentially, but are not made impossible. The most likely sample to survive the flight will be the sealed and heated one. However, there is reason to speculate the samples prone to pressure changes may still be able to complete photosynthesis functions.

REQUIREMENTS FLOW DOWN LevelRequirementDetail 0 Mission Objectives A Astraios shall reach an altitude of approximately 30,500 m on launch day, November 6, 2010, weighing no more than 850g, and costing less than $300 B Astraios will carry 4 algae samples in order to study the effects of a near space environment upon samples under varying conditions C The algae samples will be successfully recovered and then analyzed DThe results will allow Team Munchies to draw conclusions about algae’s usefulness in a near space environment.

CONTINUED 1 A.1 Astraios shall be fully assembled and tested by November 3, 2010 and then turned in to Chris Koehler on November 5, 2010 ready to fly. A.2 Astraios will we weighed following assembly to ensure it is within the weight limit. Reconfiguration will occur if necessary A.3 Budget Manager Sarah Kemp will ensure that the monetary budget is adhered to B.1 Team Munchies will obtain algae from Gulf Coast Ecosystems B.2 Astraios’s design will quarantine each algae sample and allow for open air exposure for the cold samples B.3 The samples will be prepared prior to launch, two in sealed bags and two in vented bags C.1Extensive testing will occur to ensure that the design adequately quarantines and protects the samples

CONTINUED C.2 Experiment testing will take place before launch to provide control samples with which to compare the resulting flight samples C.3 Ground samples will be present on launch day for comparison with the pressurized flight samples and redundancy samples will be on board. C.4 The recovered flight samples will be examined visually in a microscope to determine condition D.1 The condition of the flight samples will be compared with the controls established during testing and from ground samples D.2 Temperature data and pressure data will be used to understand under what conditions and at which approximate altitude the samples died if they do die.

DESIGN Science Algae Samples- 2 Cold, 2 Warm, 2 Sealed, 2 Not Sealed (Being ordered today…should take a week to arrive) Sealed bags are pressurized at sea level, thus testing whether pressure or temperature will kill the algae sample The samples in the cold will be in cube offshoot(s) on top of main cube There will also be an additional 4 redundancy samples on board Ground samples will be tested at STP simultaneously for control group Two HOBOs (in possession)- 1 for temperature and humidity, and 1 for pressure

MISSION REQUIREMENTS Extensive testing will be done to ensure that the satellite can survive flight and landing and the flight string interface will be constructed with plastic tubing, washers, and paperclips. The heater and insulation will be utilized to maintain internal temperature. Prior to turn in, the team will weigh the satellite and modify design if it exceeds 850 grams. Ascent and descent rates will be determined using the ultimate altitude reached by the balloon satellite and the duration of ascent and descent as determined by temperature and pressure data. All required hardware will be accommodated into the design. The outside of the satellite will bear contact information and a US flag. Units will be converted to metric. Transportation to launch has been planned. The team will follow its outlined safety procedures and return all hardware in working condition. The budget manager will be diligent when keeping track of expenses and receipts and hardware will be ordered with Chris Koehler’s CU MasterCard.

MASS AND MONEY BUDGET ItemPlace of PurchaseCostWeight Algae Gulf Coast Ecosystems$65120g Camera Provided$0220g Heater Provided$0100g HOBO Provided$030g Pressure Sensor (HOBO) Space Grant$020g Additional Temp. Probe Space Grant$0~12g Battery for HOBO Allied Electronics$ g Plastic Bags Target$5(4)-~5g Plastic Tubing Provided$0~12g Washers Provided$0~50g Paperclips Provided$0~2g Test String Provided$0N/A Foam core Provided$0~50g Hot Glue and Glue Provided$0~20g Aluminum Tape Provided$0~20g Insulation Provided$0~50g Batteries (6-9V, 2-AA) Target$20(3-9V)-108g Dry Ice Safeway$20N/A Styrofoam Cooler Owned$0N/A Weather Station Owned$0N/A Total: $120.24Total: 839g

DateEvent September 7, 2010 (T) Request for Proposals September 16, 2010 (Th) Conceptual Design Review (proposal/present) September 23, 2010 (T) [appt.] Authority to Proceed/Order Hardware September 29, 2010 (W) Team Meeting October 4, 2010 (M) Team Meeting October 5, 2010 (T) DD Rev A/B & CDR slides due October 5, 2010 (T) Order algae and battery October 6, 2010 (W) Team Meeting- Construction October 10, 2010 (Sun) Team Meeting- Construction/Structure Testing October 12, 2010 (T) HW 5 due October 13, 2010 (W) Team Meeting- Construction/Structure Testing October 17, 2010 (Sun) Team Meeting- Testing: Payload and Function October 20, 2010 (W) Team Meeting- Testing: Function and Cooler October 24, 2010 (Sun) Team Meeting- Testing: Payload and Revision October 25, 2010 (M) Finish Testing October 26, 2010 (T) Pre-Launch Inspection with Hardware (exterior testing must be complete) October 27, 2010 (W) Loose Ends/ DD Rev C & Slides October 28, 2010 (Th) Mission Simulation (All testing complete) October 31, 2010 (Sun) Loose Ends/ DD Rev C & Slides November 2, 2010 (T) DD Rev C & LRR due (present) November 3, 2010 (W) Finalize Balloon Saat November 5, 2010 (F) [appt.] Final weigh in and TURN IN November 6, 2010 (Sat) LAUNCH November 9, 2010 (T) Have Raw Data November 10, 2010 (W) Team Meeting-Presentation November 14, 2010 (Sun) Team Meeting-Presentation November 17, 2010 (W) Team Meeting-Presentation November 28, 2010 (Sun) Team Meeting-Presentation November 30, 2010 (T) Final Presentation and Report due December 4, 2010 (Sat) Design Expo & DD Rev D due December 7, 2010 (T) Hardware TURN IN

FUNCTIONAL DESIGN DOC.

3D MODELS

TEST PLAN No testing has begun yet Payload testing- Whip Test, Drop Test, Cooler Test, Subsystems Test, Camera Test Algae Testing- Placing it in a cooler of dry ice to test how it will survive Deliberately kill sample of algae to hypothesize what its appearance will be once it is dead, what temperature it died at and how long it can go with out water. We will also study it with a microscope to familiarize ourselves with its aspects while alive

TESTING SCHEDULE DateEvent October 10, 2010 (Sun)Structure Testing October 13, 2010 (W)Structure Testing October 17, 2010 (Sun)Testing: Payload and Function October 20, 2010 (W)Testing: Function and Cooler October 24, 2010 (Sun)Testing: Payload and Revision October 25, 2010 (M)Finish Testing

EXPECTED RESULTS We expect that the algae sample that is pressurized and kept relatively warm will survive the extreme conditions best. The sample that is unpressurized and exposed to the extreme cold conditions is expected to fare the worst. Algae samples that did not survive are expected to exhibit a brown color and a lack of cellular movement.

TEAM ORGANIZATION CHART TaskLeadSecondary Management Daniel Sayle Science Patrick ByrneDaniel Sayle Design Daniel SaylePatrick Byrne Budget Sarah KempDaniel Sayle Technical Sarah KempKatie Thompson Construction Katie ThompsonAnna McLeland Testing Katie ThompsonAnna McLeland Documentation Anna McLelandSarah Kemp

BIGGEST WORRIES Air Depletion Lack of gases for algae to survive off UV Radiation Avoiding the mutation and death of the algae Temperature Extreme temperatures may cause algae to die Landing Impact Limiting damage to algae samples