TS1 preparatory meeting 3.6.2015 A.Tauro. General information TS1 week 25: 15 to 19.6 LHC beam stops on Monday morning at 6:00 AM. Cavern access starts.

Slides:



Advertisements
Similar presentations
André Augustinus 5 March 2007 Infrastructure status.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
André Augustinus 16 June 2003 DCS Workshop Safety.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
TC meeting P2 planning wks 7&8 A.Tauro
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
EN-CV interventions during YETS
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TC meeting P2 planning wks 9&10 A.Tauro
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE 5 o’clock meeting Wk 51.
TS2 preparatory meeting
LS1 planning meeting
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
LHCb & EYETS
ALICE 5 o’clock meeting Wk
Presentation transcript:

TS1 preparatory meeting A.Tauro

General information TS1 week 25: 15 to 19.6 LHC beam stops on Monday morning at 6:00 AM. Cavern access starts at 7:30 AM, after the RP check. – SL  switch off both magnets at 6:00 AM – RP check  Andre + Klaus – Confined space tour inside L3 around 9:30 (tbc) Access mode: general (no token needed) Lift: no intervention foreseen as maintenance performed on 26.5 (valid 6 weeks) The underground access will stop on Friday at 17:00 PM – We need 1 hour for the patrol on Friday: between 13:00 and 14:00  no access during patrol Tunnel access (P2): from Monday midday to Friday midday. NO access to triplets area (ADC) 03/06/15TS1 preparatory meeting2

Reminder about safety courses From now onwards the « CERN - Beam Facilities » will be needed for access requests to ALI-UX and ALI UX- GUI. All person including those presently having access to ALI-UX and ALI UX-GUI will lose the access right, if they have not completed successfully the « CERN - Beam Facilities » e-learning before the final migration date. Therefore please take a moment to complete the « CERN - Beam Facilities » e-learning course at as soon as possible. 03/06/15TS1 preparatory meeting3

TPC RCU2 DAY-BY-DAY PLAN (CHRISTIAN) 03/06/15TS1 preparatory meeting4

Morning shift (06:00 – 14:00) –Confined space training (30 min) –Install lights –Install access platforms on A side –Disconnect and displace SPD box (4 hours) –Disconnect and displace FMD2 RCU box (4 hours) –Start working on 2 sectors on A side (A15) –Start working on 3 sectors on C side Evening shift (14:00 – 22:00) –2 teams on A side modify 3 sectors –Finish A15 –2 teams on C side modify 3 sectors Night shift (22:00 – 03:00) –1 team on A side modifies one easy sector –1 team on C side modifies one easy sector 5

Morning shift (06:00 – 14:00) –Disconnect and displace SSD box (4 hours) –3 teams on A side modify 4 sectors –Finish A14 –2 teams on C side modify 3 sectors Evening shift (14:00 – 22:00) –2 teams on A side modify 3 sectors –Finish A13 –2 teams on C side modify 3 sectors Night shift (22:00 – 03:00) –1 team on A side modifies one easy sector –1 team on C side modifies one easy sector 6

Morning shift (06:00 – 14:00) –3 teams on A side modify 4 sectors –Finish A12 –2 teams on C side modify 3 sectors –Reconnect and test FMD2 RCU box? Evening shift (14:00 – 22:00) –2 teams on A side modify 2 sectors –Finish A11 –2 teams on C side modify 4 sectors –Test and finish other sectors Night shift (22:00 – 03:00) –1 team on A side finishes things –1 team on C side finishes things –Re-connect SSD box (4 hours) 7

Thursday –Test and finish all sectors –Re-connect SPD box (4 hours) Friday –Test and finish 8

9 ShiftExpertHelperCoolingAlu barsTestsWatcher Mon 6-14Antoine, Yannick, Gregory, Philippe Esther, AlexanderChiloDidierChengxinChilo Mon 14-22Thomas, Tuva, Christian, Pieter, Rainer Sedat, Yannik, Johan, Renato Meg, Laís, SigvexTorstenMeg Mon nightVyto, YukoSupraja, MartinTylerxx Tue 6-14Antoine, Yannick, Gregory, Philippe Esther, Chilo, Ketil, Christine Alexander, OlaDidierChengxinAlexander Tue 14-22Thomas, Tuva, Christian, Pieter Sedat, Yannik, Meg, Renato, Johan Rainer, Laís, SigvexTorstenRainer Tue nightVyto, YukoTyler, MartinSuprajaxx Wed 6-14Yannick, Thomas, Gregory, Philippe Esther, Alexander, Ketil, Christine Chilo, OlaDidierChengxinChilo Wed 14-22Antoine, Christian, Rainer, Tuva Sedat, Meg, Renato, Johan Yannik, Laís, SigvexTorstenYannik Wed nightVyto, YukoSupraja, MartinTylerxx Thu 6-14Antoine, YannickKetil, AlexanderEsther, OlaDidierChengxinEsther Thu 14-22Thomas, TuvaSedat, Yannik, JohanRainer, LaísxTorstenRainer Shift leader A side Shift leader C side Not yet final

TPC other Laser maintenance – Preventive maintenance of lasers. Check performance and status of flash lamps. If necessary, replace flash lamp(s), tune energies and alignment. – For alignment, it is necessary to shoot laser into the TPC. This will be coordinated with the TPC team at a time when nobody is working on the TPC. Gas (PH-DT): work on TPC pump and frequency variator (CR5) 03/06/15TS1 preparatory meeting10

ITS Visual inspection of the ITS cooling plants and power supply racks SPD cooling work – RP check (Mon) – Filling tank 03/06/15TS1 preparatory meeting11

ITS 03/06/15TS1 preparatory meeting12  Monday PM  Tuesday PM  Thursday

03/06/15TS1 preparatory meeting13 CV-DC to put in SDBY the TPC FEE and SPD plants on Monday early morning (7:00 AM)

TRD/TOF TRD: Ethernet + optical fibers checks inside L3 – Thursday or Friday during the day TOF: replacement TDCs Overnight or Thursday or Friday during the day Andrea to see with Bologna people and let us know 03/06/15TS1 preparatory meeting14

EMCal/DCal Understand and fix why EMCAL (SRU) voltages trip at configuring EMCAL STU Fix LED box of one of EMCAL SMs. C-side top (SMC1) Reprogramming of TRUs Swapping EMCAL STU DDLs Replacing (about 10) FECs of EMCAL and DCAL Connecting DCAL STU back to PHOS power supply EMCal: work overnight Mon-Wed + during day Thu-Fri DCal: anytime, must be coordinated with PHOS 03/06/15TS1 preparatory meeting15

V0 Access for V0 FEE firmware upgrade (rack C04) 03/06/15TS1 preparatory meeting16

MCH Replace gas pipes on stations 4 and 5 (at the bottom off the chambers): no need to open the chambers Check LV connection stability on CH8R G7 (at the LVPS, filter box levels…): no need to open the chambers Visual check of mechanics on station 1 03/06/15TS1 preparatory meeting17

MTR 3 gas gaps (MT11-2; MT21-6; MT12-line1) OUTSIDE to be checked/repaired/changed Nacelle needed (EDH request # from low beta platform to UX25 side C level 1 outside). Since there is not access through PX24, the gas gaps are to be carried down with the LHC elevator at P2 (LHC-TNL access) and the passage through the UP25 chicane (YCAMM01) is needed (gas gap is approx. 2,7 m long) – Answer from LHC coordination: the best is to perform the activity on Tuesday 16 th. On Wednesday 17 th the UP25 MAD is in maintenance and a patrol is scheduled on Wednesday afternoon. The cables on RPCs are first disconnected; then the gas gap is lowered using dedicated electrical hoist (while guided by persons on the nacelle); the gas gap is then checked in UX25 side C level 1, eventually repaired or changed with new one. The gas gaps are then remounted on the Trigger mechanical frame and reconnected Installation/test of USB blaters and micro-PCs (upper gangways, close to muon trigger racks) for the remote programming of the 16 Regional card firmware (C. Renard, JL Beney). In coordination with Andre Augustinus et al. Minor FE electronics maintenance (Ph. Rosnet) 03/06/15TS1 preparatory meeting18

DAQ/detectors activities TPC: swap a pairs of links (RCU 0 and 1) inside the module of TPC A14 placed in the Mini-Frame patch-panel. This activity will be coordinated with the RCU replacement works. The work will be made by Joan with the help of Filippo for what concern the coordination with TPC activity. – Small interference with TPC A-side work – Will be done on Tuesday EMCal: swap the two fibers of EMCAL STU in the module of patch-panel located in L3, to have the correct polarities of fibers in CR1 (Martin and Filippo) – Will be done on Thursday PHOS: inspection and repair of the PHOS STU DDL fiber inside L3 (max. 1 hour) – Will be done on Thursday 03/06/15TS1 preparatory meeting19

Other interventions TE-VSC: close/open manual valve inside miniframe – Close: Monday morning at 8:00 AM – Open: Friday afternoon after 14:00 EN-HE: reinstall/remove crane electronics – Reinstall: Monday morning – Remove: Friday 14:00 GS-ASE: – Gas detection maintenance (SG2, CR5 and UX25)  transparent – UP25 MAD maintenance  Wed. Will drop the patrol IT-CS: – TETRAPOL measurements (A TETRAPOL radio will be used to measure signal strength and other parameters. Nothing will be physically installed or modified in the tunnel/experiment) – IT-CS: cut GSM network. There will be a max. 10 min cut of the GSM network at 7h30 on the Monday morning, and a second cut after their tests, during the afternoon. For the 2 nd cut they will call Andre. 03/06/15TS1 preparatory meeting20

Other interventions EN-CV-OP: – Intervention EN-CV (sand filter) in UW25 – ITS ventilation unit – test control (1/2 day)  Monday PM – SG ventilation SW update  will stop the flammable gases, date tbd EN-EL and EN-CV: – Stop circuit breaker ESD1/2E, scheduled on Tuesday morning – Will affect cavern/magnet ventilation and flammable gases (2 x 30” stops at 8:30 and 11:00) EN-EL: – Maintenance emergency lights UX25 03/06/15TS1 preparatory meeting21

DCS Monday morning (09h - 13h) for maintenance. The major activities will be: – Installation of new file servers (will bring additional redundancy) – Restart of all WinCC projects We do not plan any patches or other updates to the software. The implication is that DCS will be unavailable during (most of) that morning. We will assure the availability for the rest of the TS (notably for the TPC tests). 03/06/15TS1 preparatory meeting22

CTP Change a CTP VME L0 board Intervention in one VME crate This would mean 2 workers at C-side racks for ~ 4 hours, preferably on Monday 03/06/15TS1 preparatory meeting23

P2 technicians activities Replace lights on Monday morning (Philippe) Installation of platform on Monday morning (Yannick) Install 2 chairs + 1 table in the watcher corner on Monday morning (Transport) Install fence above L3 busbar (SPIE, Mon) SPIE: – Connection new racks (C19,C33,C34) in C-area (smoke detection, Thermoswitch, ELMB) – Cabling secondary network outlets for Netgear redundancy Installation beampipe/AD thermocouple readout PLC in rack C29 03/06/15TS1 preparatory meeting24

Visits Tuesday 16 June in the morning (DK Council members) – Protocol office asks us whether we can take care of it 03/06/15TS1 preparatory meeting25

IMPACT so far received 03/06/15TS1 preparatory meeting26

AOB PMD survey  TS2 Install magnetic filter UX25 mixed water network  TS2 Vibration measurements (TPC)  TS2 03/06/15TS1 preparatory meeting27

28

Access to sectors A13 To reach this sector one needs to remove the boxes in front of either A11/A12 or A14/A15

Access to sectors A11-12 The SSD/SPD boxes in front of A11/A12

Access to sectors A14-15 FMD2 box in front of A14/A15

On the TPC sectors: 1.Open sectors and secure blue covers 2.Drain RCU cooling loop 3.Remove mounting bars 4.Disconnect cooling pipes, fibers, cables from RCU1 (DDL stays connected for RP0 and 1) 5.Protect fibers 6.Remove RCU1 and backplanes 7.Bring material outside magnet 8.Install new backplanes 9.Receive new RCU2 boards with cooling plates. Check position label 10.Install new RCU2 11.Cable and connect 12.Put back alu bar 13.Fast connectivity test (DCS, DDL2, control bus, data bus) 14.Close sector 34

In parallel outside 1.Receive innermost mounting bars, RCU1 and backplanes 2.Store old backplanes 3.Modify innermost mounting bars in workshop 4.Remove top cooling plate from RCU1 boards (4 screws) 5.Mount these cooling plates on RCU2 boards 6.Add label (Position!) 35

Avant le démontages des cartes RCU préparer les accès (plateformes)cotes AI et AO

DECONNECTER LE COOLING 4 TUBES PAR CHAMBRE

DEMONTAGES DES CAPOTS 2 PAR CHAMBRE(TOTAL 72)

DECONNECTER LE COOLING DES CARTES RCU

DEMONTAGES DES 6 BARRES RCU PAR CHAMBRES

DECONNECTER LES CABLES + FIBRE

DEMONTAGES DES 6 CARTES RCU PAR CHAMBRE (TOTAL 216 RCU)

DEMONTAGES DES BACKPLANES 24 PAR CHAMBRE (total 864)

BACKPLANES 24 PAR CHAMBRE 6 GRANDES A DROITE 6 PETITES A DROITE 6 GRANDES A GAUCHE 6 PETITES A GAUCHE (TOTAL 864)

Unmodified bar in the back, modified in the front