Tom Gaudet Construction Corp. Questions: Please circle yes or no. Is this pool replacing an old pool? Y/N Same size? Y/N Same location? Y/N Same height?

Slides:



Advertisements
Similar presentations
Maintenance of Landscape Maintain newly planted plants in a given environment Prune ornamental plants to maintain an attractive landscape.
Advertisements

Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Site Selection for a commercial aquaculture facility (ponds)
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
CODE ENFORCEMENT DIVISION.  PURPOSE OF NUISANCE ORDINANCE:  It is the purpose of the nuisance ordinance to establish means whereby the City may remove.
Taylor Creek Park Rehabilitation Project. Taylor Creek Park Rehabilitation In July 2012 a significant storm event caused significant damage in Taylor.
Landscape Pitfalls Myths, Mistakes, and Misconceptions.
Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
Rain Gardens for Clean Streams. Did you know? Up to 70% of pollution in streams, rivers and lakes comes from storm water runoff. rivers and lakes comes.
TRENCHING AND EXCAVATIONS
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Introduction Grass Cut Guidelines. Objectives In this module you will learn about: Lawn Service Guidelines Reporting Lawn & Lot Size Bidding Expectations.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
| Part 1: Background About Georgia 811 Georgia Dig Law Notification requirements Penalties Hours of operation Positive Response.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
Living With Wildfire. The Fire Environment Low humidity dries vegetation Winds dry fuels and increase fire spread Weather.
Installation. Indoor Unit Installation Typical Installation.
Commercial Project Heat Pump Pool Heater - Sun City Center.
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
California Wildfires – A Call to Action! Be prepared or risk getting burned.
 Soil is one of Earth´s most valuable natural resources because everything that lives on land, including humans, depends directly or indirectly on soil.
Gwinnett County Department of Water Resources Reclaimed Water Transport/Application Training Program March 13, 2008 Revision 2.
Construction Management City Ordinance Landscaping & Tree Preservation Chad Herwald City Arborist Columbia, MO
Rain Gardens Credits- All images in this presentation are from the following manual: Rain Gardens- A How-to Manual for Homeowners Your Personal Contribution.
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Wildfires. Facts About Wildfires Wildfires are usually triggered by lightning or accidents Wildfires spread quickly igniting brush, trees, and homes.
Preparing The Environment/ Outdoor Play Area
Preparing Foundations for Cylinders & ASME Tanks
Tom Gaudet Construction Corp. Questions: Please circle yes or no. Does your pool have a deeper middle? Y/N Does the pool have a deck? Y/N Made of wood?
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Architectural Control Committee Heritage Hills 3195 Heritage Hills Blvd. Clermont, Florida PH: Fax Community Name: Heritage.
Annual Meeting January 26, HOA Board of Directors  Chairman – Cliff Howard (outgoing member)  President – Ilze Robinson (resigning)  Director.
Maintenance of Landscape Maintain newly planted plants in a given environment Prune ornamental plants to maintain an attractive landscape.
 This is a questionnaire about the family  How many and what ages?  Hobbies?  Pets?  Do they like to garden?  Do they prefer patios or decks? 
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
1. Check your order….  Please check your order confirmation documents carefully and ensure that the style, colour and quantity of the items stated match.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Natural Outdoor Living with Xeriscape Landscape Design Natural Outdoor Living with xeriscape landscape design is design is a garden style traditionally.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
The City of Morro Bay has implemented Mandatory Water Conservation Requirements for Severely Restricted Water Supply Conditions 2013 has been the driest.
Your Septic System Designing and its Maintenance.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
Living With Wildfire.
Department of Permits, Licenses, and Inspections
SoUTh Shore Pool Supply
Installing DOT/ICC Exchange or Stationary Cylinders
Costs and Economics of Construction
Rain Gardens for Clean Streams
Maintenance of the On-Lot Sewage System
American Pool Service (703) Winter Closing Special
American Pool Service (703)
Septic System Construction and Location
Understanding Common Code Issues
American Pool Service (703)
American Pool Service (703)
American Pool Service (703) Winter Closing Special
Presentation transcript:

Tom Gaudet Construction Corp. Questions: Please circle yes or no. Is this pool replacing an old pool? Y/N Same size? Y/N Same location? Y/N Same height? Y/N Existing deck? Y/N Made of wood? Y/N Made of Metal? Y/N Do you need us to remove the existing pool? Y/N Guarantee 1. All workmanship involved in the installation of this above ground swimming pool, when performed to the terms of this contract, shall be guaranteed for one year from the original date of installation. 2. Tom Gaudet Construction Corporation is in no way responsible for damage to pool, liner, or site including dwellings, structurally or cosmetically as the result of defective parts, liner, or “Acts of God” (i.e. strong winds, rain, snow, temperature, trees, branches, root growth, burrowing insects, etc), or irrigation systems. 3. Any check returned for any reason will void any/all guarantees and result in immediate legal action. Name______________________________ Date__________________ Pool size_____________________ Address____________________________Phone__________________ Standard Charge_______________ ___________________________________________________________Additional Fees___________________ I have read, understand, and agree to and accept the above conditions Total __________________________ Signature_______________________________ Deposit________________________ Printed_________________________________ Balance Due_____________________ Desired Date of Install or ASAP_______________ 378 Tremont st Rehoboth MA Mypoolman.net Licensed & Insured All Makes & Models MA HIC RI HIC SWIMMING POOL INSTALLATION CONTRACT Tom Gaudet Construction Corporation Will: 1. Level site up to 12” out of level for free. More than 12” there will be an excavation fee. $200 minimum. 2. Install pool to manufacturer’s specifications or better. 3. Use mason sand or clay for base of pool. And compact with plate compactor. 4. Use 8”x8” patio blocks under each vertical support and under each deck support if applicable. 5. Assemble/install the skimmer, return, and pump/filtration system including all hoses. Solar, gas, or electric heaters should be installed by a pool heater specialist. Some saltwater systems may not be included in basic installation. Ask for details. 6. If you have a chlorinater to install, be sure you have all necessary hoses, clamps, etc. 7. Place excavated earth, or debris (grass, soil, rocks, roots, etc), within 75 feet of pool site in a pre-marked location. 8. Leave empty boxes stacked neatly in homeowner’s yard. Tom Gaudet Construction Corporation Will Not: 1. Do any landscaping of pool site. 2. Do any electrical work. We will give you referral. 3. Supply water or wait for water to fill pool. Water trucks should be scheduled to come hrs after there has been 12-18” of water in pool stretching liner. Filling too soon may cause damage to pool and/or liner. 4. Guarantee a wrinkle free or footprint free liner. Every effort will be made to eliminate both. 5. Be responsible for damage to lawn or landscape from equipment used. Due to slope of yard, drainage (or lack of), and recent rainfall or winter melt our equipment may leave tracks or ruts gaining access to, or near the install site. Every effort will be made to prevent damage. 6. Assemble or install the ladder or entry system. Due to insurance restrictions we are unable to grant access into water. We will assemble and install ladder that ascends from ground to deck only if applicable. The Customer`s Responsibility is To: 1. Mark out the pool according to the building codes for your city or town regarding distances from pool to dwellings, property lines, fences, etc. along with town requirements for entry system and fencing. Mark round pools with one center stake. Mark oval pools with a stake at each of the “four corners”. Mark pump and filter with two stakes and debris location with three stakes. Be sure what you purchase complies with town safety codes. 2. Get a permit from your town before construction begins, if necessary. As far as I know all cities and towns require a permit. I will provide you with all necessary documents. You do the legwork. If you insist on me getting permit, add $ Provide access for bobcat excavation (six feet minimum clearance is needed). If I cannot get bobcat into work area, there may be an additional fee. Cars, trashcans, fences, trampolines, furniture, toys, etc. should be cleared before we arrive. 4. Inform us of any/all subsurface issues. (i.e. irrigation, septic, water lines, gas lines, electrical, etc.) Failing to do so may cause future problems. 5. Provide a “live” electrical source for our tools and a working water source with enough hose to reach the pool to begin filling. 6. Fill the pool with inches of water immediately, stop filling, and allow liner to stretch for hours depending on sunlight and temperatures. 7. Place crushed stone, 3-4 inches up the wall, around the entire perimeter of the pool before it is completely filled to prevent washouts and avoid damage to liner. This minimizes erosion and prolongs the life of the pool. 8. Know the retailer’s and/or manufacturer’s policy regard defective liners. In the unlikely event that the liner is defective, it is the costumer’s responsibility to locate said defect and supply a new liner. We will provide labor to install new liner at no cost.