GEOTHERMAL HEAT PUMP SYSTEMS: CLOSED-LOOP DESIGN CONSIDERATIONS Andrew Chiasson Geo-Heat Center, Oregon Institute of Technology.

Slides:



Advertisements
Similar presentations
HVAC523 Heat Sources.
Advertisements

Commercial / Residential Applications. Why Water? Most efficient 5,1 cm water pipe = 61 cm air duct Less space Higher mass and thermal conductivity Benefit.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
Geothermal Alliance of Illinois Getting it Right the First Time.
Heating, Ventilating, and Air-Conditioning
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Geothermal HVAC for Homes, Farms and Businesses (and schools) Alice Gitchell Richard Stockton College Please feel free to ask questions at any time!
Geothermal Rocks! The U.S. Fish and Wildlife Service Experience.
Geothermal Heat Pumps in residential and commercial HVAC systems Dan Winters 4/18/11.
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
Ground Loop Design. Heat Sources Horizontal ground loops  Collector pipework laid horizontally  Requires large land area  Cost.
Cooling Product Positioning
Greenhouse and Aquaculture Design considerations John W. Lund Geo-Heat Center Oregon Institute of Technology Klamath Falls, OR
Energy Efficient Heating and Cooling Systems For Today Geothermal Heating, Cooing And Hot Water Systems.
GeoExchange Systems Fact vs Myths David Petroy NTS Energy Consulting
Candor Construction Group & Alternative Energy Associates Presents Geothermal Heating & Cooling
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Richard Simmons Drilling Company, Inc. 60 Drill Rig Drive, Buchanan, Virginia Telephone (540) Geothermal Heating & Cooling How it Works.
Water-Source Heat Pump Basics. Water-to-Air Water-to-Air Heating.
GEOTHERMAL ENERGY. Geothermal energy is the natural heat of the Earth.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Water piping design.
 a machine that moves heat from a location to another location, using mechanical work.
Chapter 7 Heatingand Heat Management Heat Management.
North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Geothermal Heat Pumps.
Geothermal Systems Using Water Source Heat Pumps Northrich Company / Roberts Mechanical.
Introduction Topic: The Basic Ground Source Heat Pump Name: Matthew Stoangi Objective: To provide a clear understanding of the mechanics involved in the.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Heating Systems.
Geothermal Heating & Cooling Digging Deeper for Energy Savings Luann T. Kolstad Business Manager Prospect Heights School District 23.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Loop Field Sizing. Ground Source “Misconceptions” Grout isn’t important It works everywhere!!! XXX ft per ton is adequate everywhere!!! The loops must.
Geothermal Heat Pumps Connecticut Geothermal Association John Sima, PE.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Facilities Management and Design Chapter 7 HVAC Systems.
Solar Heating/Cooling/Dehumidifier Systems
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Geothermal Heating and Cooling Applications Rachel Kerekgyarto.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Geothermal HVAC: An Introduction Daniel Bernstein President Gaia Geothermal, LLC.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
__________________________ © Cactus Moon Education, LLC. Cactus Moon Education, LLC. CACTUS MOON EDUCATION, LLC ENERGY FROM.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
GeoExchange / Thermal Energy Storage Systems Reduce Overall Energy Use and Peak Demand.
GEOTHERMAL WELLS What is Geothermal Heating and Cooling? Conventional heating and cooling systems use air to transfer heat into and out of buildings. Geothermal.
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
Free Air Cooling for Data Centres
Blue’s Clues: Emma Downing, Cody Barnett, Sam Tarnowski
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Lecture Objectives: Learn about thermal storage systems
Announcements Final Project Submission Tuesday, May 12th (anytime)
HYDRONIC HVAC: The Most Comfortable and Efficient System
HYDRONIC HVAC: The Most Comfortable and Efficient System
Grunenwald Science and Technology Building
Lecture Objectives: Answer questions related to HW 4
GEOTHERMAL HEAT PUMP SYSTEMS: CLOSED-LOOP DESIGN CONSIDERATIONS
The key to comfort and reduced fuel use for all heating and cooling
FBE03: Building Construction & Science
Friday 8 am St. Edward's University
Presentation transcript:

GEOTHERMAL HEAT PUMP SYSTEMS: CLOSED-LOOP DESIGN CONSIDERATIONS Andrew Chiasson Geo-Heat Center, Oregon Institute of Technology

Outline Geothermal options - decision tree System construction Ground heat exchanger materials and layout Inside the building System design Geothermal loop design Pumping The open-loop option

General Decision Tree Unique Opportunity (gray water, etc.) Groundwater for open loop, existing well use or need Hard rock, good quality groundwater Enough land for horizontal loop, good soil for excavation Good conditions for pond loop, interested owner Good conditions for vertical loop Other HVAC System Hybrid Evaluate resource obtain permits, agreements, etc. Good disposal options Aquifer test, groundwater chemistry Evaluate standing column well Pond thermal evaluation Test bores, Thermal conductivity test DESIGN DEVELOPMENT YES NO YES Annual unbalanced loads, AND/OR thermal storage opportunity

GHP Pros/Cons Advantages Energy efficiency Simplicity Low maintenance Water heating No auxiliary heat (in most cases) No outdoor equipment Packaged equipment Environmentally “green” Lowers peak demand Low life-cycle cost Allows more architectural freedoms Better zone comfort control

GHP Pros/Cons Disadvantages First (capital) cost However, incentives, energy-savings mortgages or loop-leasing are some ways of off-setting costs Limited qualified designers Geographically limited contractors Supply/demand => higher vendor markups

System Construction What does the Loop Do? The closed-loop is a heat exchanger, where fluid flowing through the loop exchanges heat with the earth The earth is a solid material! => thermal storage effects Synonyms: Ground (or ground-loop heat exchanger), earth energy exchanger, ground (or earth) coupling, borehole field, loop field, Geoexchange (GX) Design goal is to size the loop to provide fluid temperatures to the heat pump(s) within the design target range (usually 35 o F – 90 o F) to meet thermal loads of the building

System Construction All underground piping is high-density polyethylene (HDPE) with thermally-fused joints (according to ASTM standards) Field installation procedures have been standardized by IGSHPA DX systems: Copper refrigerant lines are direct buried Standards and operating experiences do not exist to the level of water-source heat pumps

System Construction Vertical Loops Installed by standard drilling methods Auger: soils, relatively shallow holes Mud-rotary: soft sediments and sedimentary rocks Air-rotary: soft to hard relatively dry rocks Air-hammer: hard rock Cable-tool: hard rock, deep holes (slow drilling) Sonic drilling: high drilling rates in most materials Loop (or borehole heat exchanger) is rolled off a reel into borehole Borehole is grouted from the bottom to the top with a “tremie pipe” to insure a good seal Standard bentonite grout Thermally-enhanced grouts (bentonite/sand mixture)

System Construction Vertical Loops Installing vertical loop Mixing grout

System Construction Vertical Loops Inserting u-tube & tremie-pipe With geo-clips Drilling fluids flowing from hole as grout is pumped in

System Construction Vertical Loops 150 – 300 ft typical depth Reverse-return piping arrangement 1 bore per circuit u-tubes can range in diameter from ¾ to 1 ¼ inch (1-inch is most common)

System Construction Horizontal Loops 4 – 6 ft burial depth

System Construction Horizontal Loops

System Construction Pond Loops

Geo Lake Plate HDPE Pipe Copper Pipe

System Construction Flushing/Purging The loop must be designed so it can be flushed to remove debris and entrained air upon commissioning or at any time necessary Install provisions (shut-off valves, hose ports) on the supply and return runouts Large systems use one or more vaults Smaller systems can have valves on headers in mechanical room

System Construction Building Interior (from Water Furnace)

System Construction Building Interior (from Water Furnace)

System Construction Building Interior (from Water Furnace)

System Construction Building Interior – Hydronic Systems Using water-to-water heat pumps for hot water

System Construction Building Interior – Hydronic Systems Using water-to-water heat pumps Baseboards Fan Coil Units Max. output water temperatures are about 120 o F (cast iron radiators generally designed for o F)

System Construction Building Interior – Outdoor Air Several options Introducing too cold or too hot outdoor air directly to a heat pump decreases it’s capacity => but, increasing heat pump capacity may result in too much air flow In commercial buildings, some type of heat recovery system is generally recommended Water-water heat pumps tied to the ground loop can be used to pre-condition outdoor air

Loop Design Important Parameters Vertical Closed Loop Average Thermal Conductivity Undisturbed Earth Temperature Heat Gains and Losses BoreholeThermal Resistance or Borehole Spacing SOLAR COLLECTOR ARRAY COOLING TOWER

Loop Design Important Parameters Horizontal Closed Loop l Various loop configurations => Borehole resistance concept is replaced by trench resistance l Trench depth dictates average earth temperature! => T winter, T summer

Loop Design RULES OF THUMB ARE NOT RECOMMENDED FOR FINAL DESIGN Why? The earth is a solid material, so effects of run time are important in the design!! => Heat pump run hours must be considered Loop design for residential buildings is generally handled differently than commercial buildings Why? Internal gains in commercial buildings, load diversity, etc. affect annual heat rejection/extraction to the ground, so the building life-cycle must be considered

Loop Design Know the Loads Profile of the Building Zone loads determine the heat pump size (a zone is the area controlled by a thermostat) In U.S. & Canada, accepted practice is to size heat pump equipment based on the peak cooling load, and should NOT be oversized; want to minimize on-off cycling, maximize humidity control If necessary, supplemental electric heat can make up the difference Block loads (greatest sum of hourly zone loads) determine the loop size Block loads depend on the building “diversity” For example, residential buildings have no diversity, a school with wings may have a 50-60% diversity

Loop Design Overview of Procedure Building Loads ( from loads calculation software, residential may use spreadsheets ) Peak hour Design month run fraction (usually from degree days) Ground thermal properties Design lengths: IGSHPA method Proprietary software (usually employs IGHSPA method) Ground-loop software that considers: Peak hour Monthly run fraction Annual full load hours OR monthly loads Ground thermal properties Design lengths (NO UNIFIED METHOD): ASHRAE method Proprietary software Residential Commercial

Loop Design Design Software

Loop Design Thermal Conductivity l Thermal conductivity is generally dependent on density, moisture content, mineral content l Soils: –Clays (15% moisture) Btu/hr-ft-F –Clays (5% moisture) –Sands (15% moisture) –Sands (5% moisture)0.5 – 1.9 l Rocks: –Granite1.3 – 2.1 Btu/hr-ft-F –Basalt1.2 – 1.4 –Limestone1.4 – 2.2 –Sandstone 1.2 – 2.0 –Shale0.8 – 1.4 l Grouts: –Standard bentonite0.42 –Thermally-enhanced0.85 – 1.40

Loop Design Thermal Conductivity l An in-situ thermal conductivity test (or thermal response test) is recommended on commercial jobs

Loop Design Hybrid Systems Unbalanced loads over annual cycle A school in a cold climate with no summer occupancy, or office/school in warm climate A supplemental piece of equipment (or another process) handles some of the building space load Boiler Solar collector array Cooling tower Pond or swimming pool Snow melting system Refrigeration load

Loop Design Hybrid Systems HEATING LOADS COOLING LOADS

Loop Design Hybrid Systems Need software for analysis => current ASHRAE research project to study design and control Example School in Northern U.S.

Loop Design Loop Lengths for Planning Generalized loop lengths for planning purposes NOT recommended for final designs => use software

Pumping Flow requirement for heat pumps is 2 to 3 gpm/ton Flow requirement for 1-inch u-tubes is similar in order to maintain turbulent flow Total loop flow rate should be based on BLOCK LOADS, not total heat pump capacity Desire just enough flow to maintain turbulence, especially at peak hours => check Reynolds Number (Re > 2300) More turbulence means more convection heat transfer, but more pumping energy

Pumping If freezing temperatures are expected from heat pumps, loop should be freeze-protected (temperature drop across heat pumps of 10 o F should be assumed) Use as little antifreeze as necessary! Types of antifreeze: Propylene glycol Ethanol Methanol CPTherm (new product) Need to check viscosities at low temperatures => impacts pumping energy

Pumping ASHRAE grading system: A-Excellent0.05 hp/ton B-Good hp/ton C-Mediocre hp/ton D-Poor hp/ton In other words, pumping kW should be <10% of total system demand Reduce friction losses by: Reverse-return piping Parallel circuits Use larger-diameter pipe in deeper bores

Pumping Flow management Variable speed drives in central systems Sub-central pumping Individual flow centers if possible Constant flow pumping NOT recommended De-centralized loop fields in buildings with diverse floor plans

Open Loop Option Advantages: l Low cost, especially for large loads and residential applications that need a drinking water well l Water well drilling technology is well- established l Stable source temperature l Standing column well option in certain circumstances Disadvantages: Water quality dependent Scaling Corrosion Iron bacteria, well fouling Water disposal Laws and regulations Permits, water rights

Summary Closed Loops: vertical vs. horizontal vs. pond Vertical loops generally have highest first cost Consider practical considerations for loop installation => hybrid systems, open loop option Think system: interior HVAC components, outdoor air Efficiency and lower cost through design Final designs should use design software