Unit 205: Cold water systems

Slides:



Advertisements
Similar presentations
Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Unit 206: Domestic hot water systems
HVAC523 Soldering.
Safe Use and Operation of Vacuum Lines
2 Fire Fighter Qualifications and Safety Skill Drills.
An Introduction to Commonly Used Plumbing Fittings A presentation by Douglas Webley and Debra Taylor-Croather.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
Unit 205: Cold water systems
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Experiment 8 : Minor Losses
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Unit 206: Domestic hot water systems
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Unit 205: Cold water systems
Outcome 2 Materials used to install domestic central heating pipework Unit 208: Central heating systems.
Bacteriological Sampling Ken Morin, P.E. (based on slides prepared by: Bob Clement, EPA Region 8)
Undertake basic electrical tasks
Unit 206: Domestic hot water systems
Unit 206: Domestic hot water systems
Unit 204: Common plumbing processes
Skilled Trades 1201 Residential Plumbing.
Unit 206: Domestic hot water systems
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Charging System Service
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
AccuMax Multi-Point Injection Mechanics
Presentation on Installation of a Domestic Cold Water Storage Cistern
Hydronic Mechanical Controls
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Warm-up 4/6/15 What type of water do you have at your house? Objective:
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Water Supply.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
Unit 201: Health and safety in building services engineering
Unit 205: Cold water systems
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
SESSION THREE State of Ohio Class A Drinking Water Operator Certification Program This course includes content developed by the Ohio Environmental Protection.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Outcome 4 (part 4) Install and test above ground systems Unit 209: Drainage systems.
IRRIGATION SYSTEMS. OBJECTIVES 1. Describe irrigation & its purpose 2. Explain preparation for irrigation systems 3. Calculate GPM 4. Identify & explain.
Unit 209: Drainage systems
MAINTENANCE INTERVAL SCHEDULE D6R TRACK TYPE TRACTOR 7AR EVERY 10 SERVICE HOURS OR DAILY.
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Chapter 18 The Clutch System.
Automotive Heating And Air Conditioning
14 Refrigerant Recovery, Recycling, and Recharging.
Pipe Fittings.
Risk Assessment should include:
Outcome 4 Mechanical central heating controls Unit 208: Central heating systems.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
5508BESG Services and Utilities Lecture 2
Common Requirements Taps and Valves.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Source: Penn State University
Presentation transcript:

Unit 205: Cold water systems Outcome 5 Key requirements of testing and decommissioning of domestic cold water systems

Testing Once pipework has been installed into a property, the plumber must make sure that the system is: Sound (no leaks) Flushed through (cleaned internally) Disinfected (chemically cleaned) Commissioned (set up correctly)

Testing Completed Visual inspection Soundness test Flushing out Disinfecting Hand over to customer

Testing Soundness testing Before soundness testing, always walk around the system to make sure all joints have been make – visual check: Open ends Soldered joints made Compression joints tight Clips are in place Then carry out the soundness test: there is a different soundness test for rigid pipe (copper and steel) and plastic pipe.

Testing Soundness testing Rigid pipe (copper and steel) Slowly fill the system with water Walk around the system and check for leaks Leave to stand for 30 minutes (temperature stabilisation) Attach the hydraulic pressure tester Pump system up to 1.5 x working pressure (e.g. if system works at 3bar it should be tested at 4.5bar etc) Leave for pressurised for one hour Check for any pressure drop (no drop allowed) Rectify any leeks and re-test if necessary

Testing Soundness testing Plastic pipe (polybutylene) Test A: Slowly fill the system with water Walk around the system and check for leaks Pump system to 1bar – after 45 minutes, check for loss of pressure Increase pressure to 1.5 x working pressure for 15 minutes Check for pressure loss Reduce pressure to one-third for a further 45 minutes Be careful not to damage the plastic pipe or O rings during the test

Testing Soundness testing Plastic pipe (polybutylene) Test B: Slowly fill the system with water Walk around the system and check for leaks Pump system to manufacturer’s test pressure Inspect for pressure loss after 30 minutes Leave for a further 120 minutes Inspect for pressure loss If total loss is less than 0.2bar, soundness is good Be careful not to damage the plastic pipe or O rings during the test

Testing Soundness testing Whichever test is undertaken, the simple process is: Connect to pipework Fill system Charge system as required Watch the gauge Release pressure and remove

Testing Flushing and disinfecting After a new system or section of pipework has been installed, all the debris inside the pipe needs to be removed and the pipe made ready to carry wholesome water. The system is re-filled with water and then drained down from the lowest point Re-fill the system Open the kitchen tap and allow water to run until clear of debris/colour Do likewise with all other outlets in the property Add disinfectant to system (sodium hypochlorite solution or chlorine) for 1 hour – as BS6700

Testing Flushing and disinfecting Test chlorine levels at each outlet – as BS6700 Drain system Flush system through from each outlet until no chlorine is present After a soundness test, the system should always be flushed out prior to being handed over to the customer.

Testing Commissioning Make sure system is completely filled Adjust FOV levels in CWSC and WCs Test flow rates at outlets (litres/min or litres/sec) Test pressure at outlets (bar) Inspect insulation or pipework and CWSC Inspect support for CWSC (label valves) Complete any documentation Hand over to customer (explain)

Testing Commissioning A correct installation prevents: Bacterial growth (stagnation) Legionella (temperatures 20-460C) Noise (flow of water, water hammer)

Decommission Decommissioning At some point a system will need isolating due to a repair, extension, renewal or permanent removal – this is known as decommissioning. Temporary decommissioning: a system is isolated for a period of time while work is carried out, after which the system is put back into normal operation.

Decommission Permanent decommissioning: When a system or appliance is taken out of use. The system will be isolated at the incoming mains stop valve and then drained. The pipework can be removed and the pipework capped either above the stop valve, if the whole system is decommissioned, or at the end of a branch pipe to stop stagnation of water.

Decommission Decommissioning If decommissioning, inform customer or work colleagues. Cap pipework at the end of branches Always label valves after isolation while work is carried out, to avoid the valve being turned on (warning notice) Always drain water off correctly to an appropriate location Check at various outlets to make sure the system has drained off If unsure if the drain to the house is connected to the mains sewer, check with the local authority

Decommission Dead legs Passive dead leg: a section of pipework through which water cannot be drawn off or flow. Pipe not being cut back to a branch end or a drop with no DOV – these can give rise to bacterial growth. Active dead leg: a section of pipework through which cold water has to be drawn off before the hot water is drawn off. A long section of pipe on the hot water circuit (waste of water).

Decommission Draining cold water systems Localised draining Partial draining Fully drain systems

Decommission Draining cold water systems

Draining direct cold water systems

Draining cold water systems

Decommission Draining indirect cold water systems City and Guilds 6035 Level 2 Unit 201

Decommission Draining cold water systems Always drained: From the lowest point of the system using a Drain Off Valve (DOV) and hose pipe So the least amount of water is wasted If maintenance/replacement is required, drain the water from the DOV nearest to the component to be worked on and isolating rest of system Bung kits could be used for isolation of parts of system Always drain water to a safe point, e.g. a drain or soakaway