Development of Geographical Information System (GIS) for water and sewerage networks in East Sarajevo Dejan Romić, PUC „Vodovod i kanalizacija“ j.sc E.

Slides:



Advertisements
Similar presentations
The Danube Water Program
Advertisements

Desktop, Mobile & Web Based GIS/ Collaborative GIS
Components of GIS.
THE DEVELOPMENT OF LABUAN WATER-SUPPLY GIS (LWS GIS)
Role of Geospatial Technologies in Roads and Highways 08 th February, th February, 2012 Atul Kumar Chief General Manager, NHAI Atul Kumar Chief.
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
Web Enabled Enterprise Integration Insert Product Photograph Here.
Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model Presented by Kenneth Greer – CenterPoint Energy Gas Transmission.
PRESENTATION ON APPLICATION OF GIS IN BWSSB
Brussels April 16th 2007 Technical Audit of Oil & Gas Pipelines PNIS Project Contract : 1,4 M € Consortium : Technipipe/AETS from July.
Electricity Meter Installation QC and Audit Total Geo-spatial Information Solutions Johann Engelbrecht Director.
Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Strengthening the Capacity of Water Utilities.
Farnsworth GROUP Rocky Mountain Section - American Water Works Association 2002 Joint Annual Conference CONDITION ASSESSMENT of Pinery Water and Wastewater.
Agenda Overview Why TransCAD Challenges/tips Initiatives Applications.
Geographic Information Systems
Information Systems By Trino Aguiniga.
DOES YOUR DATA TALK TO YOU?. A NEW SOFTWARE PLATFORM FOR THE COLLECTION AND ANALYSIS OF ENVIRONMENTAL DATA.
Attribute databases. GIS Definition Diagram Output Query Results.
PRESENTED BY: SYED SAAD QAISER RELATIONAL DATABASE SYSTEMS.
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
Prepared by: Jennifer McKee With support from: in partnership with: Introduction to ArcPad NSF DUE
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
╬Cory Vardaman Project Manager ╬Joe Clark Assistant Manager ╬Lisa Albanese GIS Technician, Web Master ╬Ethan Roberts GIS Analyst, Graphics Design.
Attribute Data in GIS Data in GIS are stored as features AND tabular info Tabular information can be associated with features OR Tabular data may NOT be.
Presented by: Rob Mendel City of Huntingburg & Steve Leatherman WTH Technology.
Project Data and Information Management: Moldova Soil Conservation Project BioCarbon Fund Workshop February 5 - 8, 2008 Harnessing the carbon market to.
Zortec Data Replication. What you get with Zortec Data Replication: Complete access to your Zortec Application data in a Open Data Base format.
Automated Data Analysis National Center for Immunization & Respiratory Diseases Influenza Division Nishan Ahmed Data Management Training Cairo, Egypt April.
GEOGRAPHICAL INFORMATION SYSTEM (GIS)
Module CC3002 Post Implementation Issues Lecture for Week 2 AY 2013 Spring.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Cost Effective GIS Implementation for Municipalities “Wisconsin Land Information Association Annual Conference – Applications Track” February 13, 2003.
Copyright 2010, The World Bank Group. All Rights Reserved. COVERAGE, FRAMES & GIS, Part 2 Quality assurance for census 1.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Establishment of the Environmental Quality Standard for Water and Strengthening of Regional and District Environmental Offices for Implementation of Water.
Ground-Truthing the Habitat Inventory for the Fraser River: Status Report and Lessons Learned March 2007 Fraser River Estuary Management Program.
Low Voltage Smart Grid System Enables Near Real Time Energy Balancing as a Tool for Detecting and Managing Energy Losses Jan Olwagen Senior Engineer Utillabs.
ICT development office ICT research, planning and training dept. Network development and administration dept. System development and operation dept. President.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
Microsoft Access Database Software.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Role of Spatial Database in Biodiversity Conservation Planning Sham Davande, GIS Expert Arid Communities Technologies, Bhuj 11 September, 2015.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Utilizing GIS & GPS to Streamline Your Maintenance Operations 2008 Indiana GIS Conference February 20, 2008 In Association with: Nicholasville Jessamine.
112 East Main Street Frankfort, Kentucky tel Fax
An Introduction to Networking
Working Group on Training: From Challenges to Opportunities Vienna, May With the financial support of:
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
City of Woodcreek, TX Project Proposal GEO 4427 Advanced GIS II.
Marketing & Sales Projects Marketing & Sales Knows Program INTRANET WEB SITE - Tuesday, 2 nd of August of 2005 Valerian LARDILLIER.
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
WFM 6202: Remote Sensing and GIS in Water Management © Dr. Akm Saiful IslamDr. Akm Saiful Islam WFM 6202: Remote Sensing and GIS in Water Management Dr.
The Smart Network: NRW, Pressure and Asset Management
Integrating Crystal Reports with SIGNZ (V3.59, July 2008) Integrating Crystal Reports with SIGNZ (V3.59, July 2008)
Database Overview What is a database? What types of databases are there? How are databases more powerful than spreadsheets?
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
GEOG 578 GIS Application Lab 1 Intro. to MapInfo.
Case study of Velika Kladusha (B&H), Lipjan (Kosovo) and Kochani (Macedonia) Vienna, 13 May 2016.
TRADITION OF IGNORING CONTINUOUS NON-REVENUE WATER MANAGEMENT IN WATER UTILITIES IN SOUTH-EAST EUROPE Vienna, 13 May 2016.
ESRI Geodatabases Ming-Chun Lee.
Databases.
ESRI Geodatabases Ming-Chun Lee.
Egypt’s Population, Housing & Establishments e-Census, 2017
Smart policies, strong utilities, sustainable services
Technical Maintenance Evolution (From Scratch – to Smart)
Syed Masiur Rahman (student id #220256)
2016 Resource - Z Data Replication
Item 2.2 of the Agenda Remote access to confidential data for researchers: possible actions under the 7th Framework Programme Pascal JACQUES Unit B 5 15.
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
Presentation transcript:

Development of Geographical Information System (GIS) for water and sewerage networks in East Sarajevo Dejan Romić, PUC „Vodovod i kanalizacija“ j.sc E. Sarajevo Vienna, May 7th

Introduce WSS East Sarajevo PUC „Vodovod i kanalizacija“ jsc from East Sarajevo General data: –provides service for residents with water connections –3 main water sources are: Tilava (180 l/s), Grabski mlini (25l/s) and Ljustra (30l/s) –Water supply system length 190km and 70km of sewer system

Why GIS? The main priorities indetified in WSS Study by MDGF:  Developing GIS  Development of water supply system's hydraulic model  SCADA remote control system  Network research and defect repair in water supply system

Development of GIS Project of developing of GIS in East Sarajevo apllied to DWP on Call for Competitive Grants in September 2013 Project approved and started in February 2014 Costs of project: IAWD provides ,00€ PUC „ViK“ E.Sarajevo provides ,00€ ,00€ Procurement carried out by rules of the World Bank

Development of GIS Before main activities on project has started we had to procure: -Consultant/GIS expert -Server -Geodesic equipment (GPS) -Software for GIS -Renting car for field work

Development of GIS Phases on project activities: -Gathering all previously used data in.dwg,.shp, and other formats and converting to.tab files (MapInfo format) -Making new layers with attribute structure compatible with hydraulic systems and models -Collecting data on field with geodesic equimpment -Training for GIS staff to work on GIS data

Collecting data from field

Development of GIS -Installing of SQL server with GIS database -Identification of all consumers into MapInfo and making link with economic information system -Making queries in MapInfo adjusted for many purposes -Making procedures for easier access to all kind of relevant data

Working space in GIS software Attributes for consumer Attributes for water pipes

Mix of queries for pipe system

Conclusion DEVELOPING OF GIS FOR WATER AND SEWER NETWORKS ENABLED: Optimization Of Water Supply And Sewer Systems Efficient Management Systems Hydraulic Modeling Detection Of Illegal Consumers

THANK YOU!