Longmeadow Parkway Fox River Bridge Corridor

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Great Western Corridor Feasibility Study
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
Environmental Assessment Public Meeting
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
General Planning and Annexations Key principles, background and processes Dh 2005.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Property Acquisitions June 15, 2010 Presentation for SR 100 Board/City Council Meeting.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
Sustainable Regional Planning in the Chicago Region Chicago Metropolitan Agency for Planning (CMAP) Tuesdays at APA October 25, 2011.
Municipal Tax Increment Financing Daniel Stevenson, Office of the Commissioner, DECD Phone:
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee March 22, 2011 Info Item: East Bethel Update Bryce.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Indiana Lake Michigan Coastal Grants Program Coastal Advisory Board April 18 th, 2007 Jenny Orsburn Program Specialist.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
NGA Center for Best Practices: Policy Academy on Land Use and Transportation Planning State of Illinois Team Lynne Padovan—Governor’s Office Randy Blankenhorn—IDOT.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
64 th ILLINOIS ASBO CONFERENCE AND EXHIBITIONS APRIL 29 – MAY 1, #iasboAC15 TIFs and Civic Engagement Tom Tresser CivicLab co-founder.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Bulldog Drive Right-of-Way Acquisition Status March 9, 2010 Presentation for City Council Workshop.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
USA Parkway Project Welcome Public Information Meeting to the
Metropolitan Planning Organization for Blair County (Altoona MSA) Regional Long Range Transportation Plan Draft Agency Coordination Meeting (ACM)
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Office of Greenways & Trails
Draft Transportation Element September 6, 2017
STP Shared Local Fund: Project Evaluation Criteria
VICTORIA CITY COUNCIL MEETING
Presentation transcript:

Longmeadow Parkway Fox River Bridge Corridor April 14, 2015

Longmeadow Parkway Bridge Corridor ~ 5.6 miles from Huntley Road to IL 62 Unique municipal/county/state/federal partnership Linkage of Randall Road & 3 state routes (IL 25, IL 31, IL 62)

Project Purpose To enhance Kane County’s transportation network by reducing congestion and providing alternative and more direct routes To serve existing and planned land use through efficient access to central business districts, public services, and employment / commercial centers

Project Need No new river crossings in Upper Fox Valley since I-90 in 1950’s Congestion & Travel Delay increasing on area roadway network with negative impacts to local streets/neighborhoods Tenfold Population Increase west of Fox River since 1980s with northern Kane County currently a Chicago region leader in new housing starts 2040 Growth Projection—additional 150,000+ people for immediate area with increasing impacts to existing bridges, streets and communities Impacts to Economic Growth & Existing Communities–traffic congestion hampers access to local business districts, employment and commercial centers Carpentersville Main St. bridge carries increasing regional traffic with impacts to local neighborhoods on east side of river

“It takes time” – From the Start… 1990 – Bridge Advisory Committee formed to comprehensively study potential new bridge crossings (20+) of Fox River 1990-2001 – an extensive team of federal, state and local agencies including over a hundred environmental and engineering professionals evaluated potential bridge corridors Evaluations included four (4) Dundee area corridors – County Line, Longmeadow Parkway, Miller/Lake Marian & Boncosky Evaluated such areas as land, water, air, structures, living organisms, social, cultural, and economic impacts with 30+ public meetings for the Environmental Impact Statement (EIS) process

Environmental Impact Statement -EIS Team included: Illinois Department on Natural Resources Illinois Environmental Protection Agency Illinois Historic Preservation Agency Illinois Nature Preserves Commission Illinois State Geological Survey U.S. Army Corps of Engineers U.S. Department of the Interior U.S. Department of Agriculture U.S. Environmental Protection Agency U.S. Fish & Wildlife Service Various Environmental & Engineering Consultants Municipalities Kane County Forest Preserve District Illinois Department of Transportation Federal Highway Administration

Environmental Impact Statement 2001 – Federal approval of Final EIS and Longmeadow alignment 2002 – Federal Record of Decision approving Longmeadow Longmeadow Parkway: Best satisfies the purpose & need Least impacts to the natural & human environment Selected based on processes in compliance with NEPA Eligible for Federal funding May advance through development process to construction

Environmental Impact Statement Final EIS process established the final alignment & included mitigation of open space impacts Longmeadow alignment adjusted during EIS to minimize impacts 2002 Federal Record of Decision established final alignment Final Design uses Longmeadow alignment approved 2002 Open space mitigation part of land acquisition requirements 2008 Brunner Forest Preserve acquisition process considered and included the conveyance of the Longmeadow right-of-way

More Recent Activities including 100+ Public Meetings 2003 – Phase I Engineering & Land Acquisition proceeds forward 2003-2007 – Algonquin, Carpentersville and County have numerous public meetings and approve Longmeadow in Comprehensive Plans 2007 – Municipalities request County to make Longmeadow a toll bridge 2007-2010 – Longmeadow Task Force established to study toll option 2009 – Federal review & approval of EIS change for toll bridge approach 2010 – County Board approves Toll Bridge approach 2012 – County Transportation Plan with Longmeadow adopted 2013 – Phase I Eng./Design Approval by FHWA & Phase II Eng. Started 2013-2015 – Final Design and required environmental updates

Municipal Planning Municipal planning efforts and public processes have also included Longmeadow Parkway: Carpentersville’s 2007 Comprehensive Plan Algonquin’s 2008 Comprehensive Plan Development planning & platting Right-of-way acquisition Construction of roadway segments 10 resolutions of support – Algonquin, Barrington Hills, Carpentersville, East Dundee, Gilberts, Hampshire, Huntley, Lake in the Hills, Sleepy Hollow, West Dundee During this time, there has been much support…

Regional / State Approvals & Construction Funding Support Metropolitan Planning Organization (CMAP) assisted with – Planning, Programming, & Air Quality Conformance Analysis in accordance with federal requirements ~$3.1M in Congestion Mitigation Air Quality & other federal funds ~$5M from Kane/Kendall Council of Mayors ~$40M in IDOT funds for their portion of the project

Why a Toll Bridge? Challenge Funding Opportunity Federal, State & local funds are limited Funding Opportunity County may create toll bridges Bridge funding assisted through user fees (75% plus of area households have I-Pass) Supports other County capital projects by creating an additional revenue source for Longmeadow Provides mechanism for non-Kane County Residents to help pay for the corridor As the Committee is aware from past discussions, roughly $110 million dollars is still needed to construct the County’s highest Fox River Bridge Corridor priorities. A significant amount of funding from various outside sources, such as SAFETEA-LU, is secured, but staff is not confident that outside sources can accommodate the multi-million dollar shortfall in funding. Budget rescissions, the approaching expiration of the National Highway Trust Fund, changes in programming strategies at the regional, State, and Federal levels have resulted in very limited and competitive funding conditions for transportation. For these reasons, the County is exploring the possibility of constructing a toll bridge project.

Toll Bridge Bridge is tolled with one facility east of Fox River Remainder of Longmeadow is not tolled and provides local accessibility much like any other local road

Project Development Cost to Date: ~$28.5M (Studies, EIS, Engineering & ROW) Following successful model of Stearns Rd Bridge Corridor Won many local, state & national awards IL American Planning Association – 2012 Sustainability Award Kane-DuPage Soil & Water Conservation District - Recognition of Excellence for Efforts in Conservation of Land and Water Resources

Project Development No Tax Increase – like many County projects, Longmeadow construction will be fiscally responsible and proceed incrementally and staged as determined appropriate When requested, meeting with abutting property owners and addressing final design considerations where able Addressing remaining requirements of environmental resource agencies as part of the final engineering

Project Status / Next Steps Finalizing Phase II Engineering – Summer 2015 (~$9M) Construction permitting process underway Land Acquisition – 2015/2016 (~60% land acquired) Intergovernmental Agreements – Tollway, State Construction Cost Estimate: $100M Construction Contracts / Staging – TBD 1st construction contract letting – targeting Fall 2015 Remaining construction contracts – targeting 2016-2018