Roadmap for BBLR compensation for HiLumi LHC operation HS – 22-1-2015 HL-TC With contributions from: R.Steinhagen (GSI), R.Veness, R.Jones, S. Redaelli,

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Long-range beam-beam compensation at HL-LHC Tatiana Rijoff, Frank Zimmermann ColUSM # /03/2013.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
IPBSM status and plan ATF project meeting M.Oroku.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
3/7/2002SLTC1 An LHC Beam-Beam Long- Range Simulator for the SPS Miniteam: J-P Koutchouk/BI, G. de Rijk/MS, F. Zimmermann/AP Tech. Coordination: J. Camas/BI.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Diagnostics for intense e-cooled ion beams by Vsevolod Kamerdzhiev Forschungszentrum Jülich, IKP, COSY ICFA-HB2004, Bensheim, October 19, 2004.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LHC-CC10, 4th LHC Crab Cavity Workshop Summary Session 5: Crab Cavity Beam Studies P. Collier.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock,
Scattered electrons as possible probes for beam halo diagnostics. P. Thieberger, C. Chasman, W. Fischer, D. Gassner, X. Gu, M. Minty, A. Pikin Speculations.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
ERHIC design status V.Ptitsyn for the eRHIC design team.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
Luminosity measurement at LHC (The machine point of view) Enrico Bravin AB/BDI Large part of the material presented here has been produced by the LBNL.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Beam Instrumentation and Diagnostics for BBLR tests in LHC & commissioning in HL-LHC Rhodri Jones (CERN Beam Instrumentation Group) 4 th Joint HiLumi LHC-LARP.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
BEAM INSTRUMENTATION AND DIAGNOSTICS FOR HIGH LUMINOSITY LHC Rhodri Jones CERN Beam Instrumentation Group.
Principle of Wire Compensation Theory and Simulations Simulations and Experiments The Tevatron operates with 36 proton bunches and 36 anti-proton bunches.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
Numerical Simulations for IOTA Dmitry Shatilov BINP & FNAL IOTA Meeting, FNAL, 23 February 2012.
ESS | Non-Invasive Beam Profile Measurements| | C. Böhme Non-Invasive Beam Profile Measurement Overview of evaluated methods.
ODR Diagnostics for Hadron Colliders Tanaji Sen APC.
R&D program on e-lenses and BBLR-compensation
Tracking simulations of protons quench test
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Updated scenario and simulations for the BBLR LHC test
Wire, flat beams and beam-beam MDs in 2017
Large Booster and Collider Ring
Adriana Rossi, Sergey Sadovich
CLIC-ILC BDS & MDI work.
ELENA Extra Low ENergy Antiproton Ring
Variable distance from beam.
Another Immortal Fill….
IR/MDI requirements for the EIC
Plans for future electron cooling needs PS BD/AC
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Roadmap for BBLR compensation for HiLumi LHC operation HS – HL-TC With contributions from: R.Steinhagen (GSI), R.Veness, R.Jones, S. Redaelli, G. Tranquille, T.Lefevre, Y.Papaphillipou, G.Stancari(FNAL), A.Valishev (FNAL)

Outline The project is broken down in four work-packages: 1) Demonstrator projects before LS2 ( demonstrator installation in collimators, installation winter shutdown ) 2) Related beam instrumentation and beam experiments : 2 D halo monitor, tune spectra 3) Optimization of parameters for HiLumi  done inside HL-WP2 4) BBLR compensation using e- lenses: Try to make this part of a more generic R&D: - Low energy e-beams as actuators on hadron beams

1) Demonstrator projects Work consists of simulations, a workshop in summer 2015, SPS experiments in 2015/2016, LHC experiments in simulations: Y.Papaphilipou et al, A.Valishev et al. Aim: simulate possible beam observables with/without compensation, specify necessary instruments performance - workshop: details still to be defined; summer 2015 aim: bring about 10 people from simulations together with about 10 instrumentation experts…see what is possible - SPS experiments: next slide - LHC experiments: following slides Aim of this work-package is to have end of the year 2017 enough experimental evidence such that BBLR compensation becomes a “construction option” for HL-LHC.

Wires at SPS Two 60cm long 3-wire compensators installed in the CERN SPS  Different “crossing” plane and 45deg Movable in vertical by +/- 5mm (remote controlled) Water cooled About equal beta functions in the transverse planes (~50m) Separated by phase advance of 3deg (similar between BBC and long range interactions in LHC) Powered with integrated DC current of up to 360A m (60 LR collisions in LHC) Set-up re-evaluated during 2014 (powering), for MDs in 2015 (benchmarking wire models) Effect of wire on orbit, tune, tunes-spread, coupling (alignment), resonance driving terms, beam distribution (tails) Can be done at flat bottom in parallel MD cycle with new pulsed power supply Beam brought close to the wire with closed bump (to be checked)

LHC BBC brainstorming - Oxford, 5 Initial Plans: LHC Beam-Beam Compensators I/III Reservations around IR1&IR5, LHC-BBC-EC-0001: Min. LRBB → BBC phase advance: Δμ ≈ 2.6° (→ 3.1°) Symmetric beta-function: β x/y ≈ 1000 m (for β*= 0.55 m) N.B. single vacuum pipe for B1 & B2: 110 mm full beam separation (only D1 only) (→ 165 mm, if shifted more towards TAN) ~105 m BBC B1 B2 ? TCT

LHC BBC brainstorming - Oxford, 6 Status Wire in jaw collimators -4 “wire in jaw“ collimators ordered from CINEL. Design finished in late Delivery during 2015, followed by qualification tests. Installation in WS 2016/2017 -Cost covered by HL-LHC -2 options: 1) full compensation of one beam: 1 collimator L&R in IP1 & IP5 2) compensation of both beams on the ingoing or outgoing side = 2 collimators on the same side in IP1 & IP5 Presently the cabling has been pulled for option 2 Option 1 is preferable (Yannis dixit) in order to reduce the footprint in tune- space. This needs 4 independent power supplies due to asymmetries in the optics. One option has to be taken soon. Experiments to be done in 2017 depend on outcome of SPS studies, on progress of simulations and on available instrumentation.

LHC BBC brainstorming - Oxford, 7 HL-LHC Option 3: Local e-beam simulating 'wire'-like Field I/II E-beam has by-design perfect 'wire' field distribution similar to existing e-cooler, (hollow-) e-lenses used at Tevatron & RHIC, however: offset e-beam! → much lower requirements on transverse e-beam parameters (i.e. beam size, profile distribution etc.) Still need large solenoid field to stiffen e-beam rigidity no solid material close to beam → chance of being MP x2 (units are back-to-back)

Ad 1) workshop Exact date and location of this workshop depends on progress on simulations and availability of experts  say summer 2015: -Show simulated observables -Explain potential of existing instruments -Understand possible new instruments -Evaluate experiments -About 20 participants (FNAL, BNL?, CERN)

2) Instrumentation development (1/2) Tune-spectra: nothing done so far; needs simulation effort what can be measured with swept sine wave analysis Halo Monitoring: a) based on synchrotron light b) beam–gas interactions a) On the first look challenging due to high energy of LHC beams. “ the synchrotron radiation cone (1/gamma) gets so narrow that the beam itself generates a significant diffraction pattern, which overwhelms the potential halo signal) - 2 approaches will be tried in collaboration: 1) Shipment of a coronograph from KEK to CERN and installation of this device onto one BSRT (T. Mitsuhashi et al.) Shipment in 2015, installation plans pending. Presently optics simulations trying to reduce diffraction fringes by apodisation

Apodisation

2) Instrumentation development (2/2) 2) observation of Halo with a high dynamic range camera: A. Fisher (SLAC) et al. + D. Rubin (Cornell). This collaboration is presently being defined, not much progress expected in the beginning of this year, CERN experts busy with LHC start-up.

Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference on Technology and Instrumentation in Particle Physics Plamen Hopchev - 9th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators, 16 April Rhodri Jones (CERN) SLAC Halo Workshop (IBIC14)

From LHCb to mini LHCb BGV Colin Barschel 13

Colin Barschel 14

BGV for Halo? No experience with trying to measure the halo at 4-6 sigmas Need to deconvolve with tail of vertex resolution Beam-gas rate will be orders of magnitude smaller at this radial distance – Currently aim at 100Hz beam-gas per nominal bunch. – Sampling 0.1% of bunch tail of the bunch  0.1 Hz / bunch Increasing the interaction rate Measurement of “average” beam halo possible (2808 bunches) Increase the pressure (limited by vacuum interlocks) – factor 10 to 100 may be possible for short times Combine with gas sheet? Colin Barschel 15

4) R&D on BBLR Compensator implementation post LS3 a)Not part of the HL baseline b)General consensus that « in jaw wires » not possible - distance from beam too large - ideal location for compensator in common beam pipe…second beam has to pass through the collimator jaw c)Since 2013 proposed to study the replacement of the physical wire by an electron beam: Presently definition of a collaborative project called: « Low energy e-beams as actuators on hadron beams »

E- beam applications So far: - AD, LEIR & ELENA e-cooling (G. Tranquille et al.) not further discussed; parameter space is very different, but same people at CERN + common technologies Under study - LHC beam cleaning (S. Redaelli et al.) - LHC BBLR (H. Schmickler et al.) Further request: - Compensation of space charge effects in SIS18/SIS100 (GSI – FAIR project; P. Spiller et al.) Needs a new feasibility study: - Compensation of space charge effects in CERN PS, PSB GSI has submitted a request to the German BMBF for funding in order to simulate further details of this compensation. CERN is following (and complementing?) these simulations.

R&D needs Increase of intensity of electron beam (presently a few A) by a factor 2 to 5. Fast modulation of the (DC) electron beam up to 40 MHz (10% intensity LHC for pacman bunches, intensity modulation following bunch shape for space charge compensation) Improved diagnostics (e-beam size in the overlap region, overlap of e-beam with p beam)  CERN will build a test-stand (mainly BE-BI)

Teststand details The BE-BI group has an test-stand for development on electron cooler equipment (LEIR, ELENA) in building 236. There is space for an additional test-stand in building 236. Such a test stand is a complex system composed of (cryogenic) solenoid magnets, power supplies, electron beam source and collector, vacuum system and diagnostics. Instead of building a complete new installation FNAL has agreed to lend the almost complete TEL-2 Tevatron electron lens installation to CERN. Presently building 236 is being refurbished and TEL-2 should get to CERN in the second half of the year 2015.

Inside building 236

Outline of developments to be made Pre-requisite: Import the technologies towards CERN engineers. Collaborations with FNAL & GSI (BNL and COSY to be contacted) Increase the electron beam current by a factor two to five. Modulate the electron beam intensity by about 10% at 40 MHz; potentially with a low power steering grid. Develop an instanteneous beam profile measurement at full beam power. An existing development for the CLIC drive beam (Adam Jeff, Liverpool University) could be adapted to the new geometry : Injection of a gas-curtain and measurement of the beam profile through ionization/fluorescence (2 following slides)

RHIC e-lens showing the location of the electron back- scattering detector (eBSD) 23  The beam-beam effect limiting RHIC luminosity will be mitigated with two electron lenses  The 2 m long electron and proton beams propagating in opposite direction in two ~6T solenoids have a width of ~300  rms.  The misalignment must be < 30  for the lenses to work properly.  Misaligned can do more harm than good.  BPMs are not quite good enough to guarantee satisfactory alignment.  We will use electrons backscattered by the protons as the “luminosity signal to achieve alignment  The system was recently successfully commissioned with 100 GeV/amu Au and 3 He beams

Schematic of the detector and of the electron trajectories 24 The electrons, scattered in small impact parameter collisions with the ions, reach the detector located close to the gun after traversing a thin vacuum window (~5 keV) ~1 to ~20 MeV End of ~2 m long, 6 T solenoid 5 keV electron beam envelope ION BEAM The upward trajectory drift is due to the horizontal bend.

Summary Not a lot of news The construction and installation of the wire in jaw collimators is going on, until WS 2016/2017 the SPS will be our only test bed. Options need to be chosen soon. People are concentrating on a) refining simulations b) preparing advanced diagnostics A test stand for e-lenses is prepared at CERN during Large collaborative interest. Funding will only partly come out of HL-LHC, but also (hopefully) from other sources. Refined cost schedule in 2 months from now.