Preliminary Decision Conference For SA Power Networks 13 May 2015 Adelaide Bev Hughson Consumer Challenge Panel Member.

Slides:



Advertisements
Similar presentations
Bruce Mountain Director Electricity Tariff Revolution: some questions Presentation to Energy Efficiency Council Annual Conference.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Regulation of network services Recent experience in the Australian National Electricity Market FSR Executive Seminar - 11 June Florence David Swift Executive.
Investment Appraisal Techniques
22 August 2012 Regulating for productive efficiency – an assessment of the regulatory framework faced by Eskom Presented at the South African Economic.
Draft decision – initial views Rob McMillan December 2014.
AER’s Draft Decision for NSW distributors Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Benchmarking and efficiency mechanisms Stephen Clark - A/GM Connections & Development Transend Networks.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
SAPN Historical Performance Trends Prepared by the Consumer Challenge Panel for illustration purposes only The charts are based on the SAPN.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
Budgets. On completing this chapter, we will be able to: Understand why financial planning is important. Analyse the advantage of setting budgets- or.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Incentive Mechanisms NARUC Staff Subcommittee on Accounting and Finance Portland, Oregon September 8-12, 2013 Presented By Bill Steele Bill Steele and.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
Better Regulation Program Service Provider Consumer Engagement Guideline Consumer Forum March 2013.
An Overview of Our Regulatory Proposal
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
ACCC Forum on Draft Statement of Principles for Transmission Regulation – New Investment Roman Domanski Executive Director Energy Users Association of.
Pioneers, Imitators, and Generics – A Simulation Model of Schumpeterian Competition The authors develop a computer simulation model of R&D competition.
Stakeholder Meeting on AER’s Preliminary Decision for SA Power Networks 27 May 2015 Adelaide Bev Hughson Consumer Challenge Panel Member.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Board Staff Presentation Stakeholder Conference – August 5-8, 2008 INCREMENTAL CAPITAL MODULE July 28, 2008.
Draft decisions Access Arrangements for APT Allgas and Envestra (Qld) Warwick Anderson General Manager, Network Regulation 1 March 2011 Public.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
2.1 DEFINE THE PROJECT STRATEGY The project is a vehicle for the execution of strategy both organization and individual. This implies that a high level.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
The Australian Energy Regulator Service provider consumer engagement guideline 30 April 2013.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
SAPN’s proposal: initial comments Bruce Mountain.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Public Forum 10 December 2014 SAPN Regulatory Proposal Bev Hughson Consumer Challenge Panel Member.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
UNIT No. 3 Capital Budgeting Nature Significance Technique of Capital Budgeting Pay back Method Accounting Rate of Return Net Present Value Profitability.
Budget Presentation 2010/2011 – 2013/2014 All Communities 28 January 2010.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
15 October 2013 Briefing on draft s 56G report on the effectiveness of information disclosure regulation at Christchurch Airport.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Chapter 4 Measurement PowerPoint Presentation by Matthew Tilling ©2012 John Wiley & Sons Australia Ltd.
Genesisenergy.co.nz Commerce Commission Electricity Lines Business (ELB) Regulation Information Disclosure Genesis Energy 17 March 2005.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Summary and analysis of information disclosed by 29 electricity distributors 12 December 2013.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
Identifying drivers of expenditure. Reasons for spending money 2 Effective regulation requires an understanding of why a business spends money Many different.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Draft 2015 electricity distribution price-path reset Briefing for financial market analysts 4 July 2014 Sue Begg Commerce Commission.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Strategic Information Systems Planning
Andrew Reeves, Chairman Asia-Pacific Partnership on Clean Development and Climate: Energy Regulatory and Market Development Forum 4 November 2010.
Fair Go Rates System Dr Ron Ben-David Chairperson
2016 IPWEAvic Public Works Conference
OPG’s Views on Incentive Regulation and the Power Advisory LLC Report
Fair Go Rates System Dr Ron Ben-David Chairperson
Presentation transcript:

Preliminary Decision Conference For SA Power Networks 13 May 2015 Adelaide Bev Hughson Consumer Challenge Panel Member

Some common acronyms AcronymName AERAustralian Energy Regulator CCPConsumer Challenge Panel CESSCapital Efficiency Saving Scheme DNSPDistribution Network Service Provider EBSSEfficiency Benefit Saving Scheme ESCOSAEssential Service Commission of Australia MPFPMultilateral partial factor productivity NEMNational Energy Market PDPreliminary Decision (SAPN determination) RABRegulatory Asset Base SAPNSA Power Networks STPISService Target Performance Incentive Scheme WACCWeighted Average Cost of Capital 2

Presentation Outline Opening remarks A quick history The challenge of SAPN’s proposal to the AER Response to SAPN’s proposal –Customers/stakeholders AER’s Preliminary Decision – a CCP overview –Revenue –Opex –Capex Regulatory principles Consumer engagement Concluding observations from the CCP 3

A quick history SAPN: A proud past: –One of the more efficient networks in terms of both operating expenditure (opex) and capital expenditure (capex) in the NEM –Its expenditures have been close to its allowances, and long period of stable prices –Delivered safe and reliable network services to its SA customers –Demonstrated a high level of compliance with its regulatory obligations –Customers expressed relatively high level of satisfaction with SAPN However in : –Higher expenditures compared to Capex: ≈ 96%; opex: ≈ 41%* –SAPN’s revenue grew by ≈ 35%*, but demand down on forecast- prices rise significantly –Flat demand growth has also lead to growing spare capacity –The RAB has started to grow, as has RAB per customer * Source: AER, State of the Energy Market 2014, Figures 2.4, 2.6 & 2.8. These figures are not necessarily the same as the data provided in the RIN data sets. 4

Network prices increased by over 55% through ; Disconnections more than double 5 Source; Extracts from submission by SACOSS et al to the SAPN Regulatory Proposal

Multilateral partial factor productivity (MPFP) index ( ) by state 6 Source: Economic Insights, Economic benchmarking assessment of operating expenditure for NSW and ACT DNSP’s, , Figure 4.2, p 21. MPFP av annual growth rate from Table 4.1, p 20. Annual average MPFP growth rate for SAPN was -4.84% (average DNSP was %)

The AER’s challenge for –SAPN has proposed very significant increases in both capex and opex for (NB: on top of big increases in ) –SAPN is also forecasting continued decline in demand –Which means: further decline in capacity utilisation And therefore, in productivity –Prices rising at around CPI – but only because of the significant decline in the WACC SAPN’s proposal misses the opportunity to propose significant price reductions that are sought by their customers –SAPN justifies much of the additional capex and opex based on: Customer engagement research; Regulatory/legal obligations; Aging assets/risk management of assets 7

Questions posed at the December Public Forum At the December Public Forum, the CCP posed the following questions: –Is SAPN’s overall revenue proposal reasonable, particularly given large increases (in real dollars) in the last regulatory determination ( )? –Is SAPN’s approach to the WACC reasonable? –Is the demand forecast reasonable? –Is SAPN’s proposed increase in capex reasonable? –Is SAPN’s proposed increase in opex reasonable? –Does SAPN’s consumer research provide sufficient justification for additional capex and opex ? Many of the SA community have spoken! –An unprecedented response –Over 30 submissions challenging aspects of SAPN’s proposal 8

An unprecedented response from the SA Community Submissions come from a broad cross-section of SA community –Community organisations/green groups –Businesses/business organisations –Farmers/irrigators –Energy Retailers/Industry associations –State Governments/Councils All expressing concerns about aspects of SAPN’s proposal – both the content & length! General view from your submissions: –SAPN has done a good job in the past, but recent price increases have added to the other energy pricing pressures for customers –And there is little (no) justification for the increases in expenditure, particularly with demand flat/falling & increase spare capacity –Priority for most consumers is price relief 9

How has the AER responded? AER generally agrees with SAPN’s forecast of demand growth ((≈ 0%) & consumer number growth (≈ 1% to 1.5%) But (like consumers) the AER has rejected many of SAPN’s proposed additional expenditures –AER’s general approach is to look at historical expenditures & trends as a starting point –Although this is supplemented by other valuation techniques such as benchmarking, engineering assessments… The AER seeks higher standard of “proof” for claims for additional expenditures; –it is not reviewing current prudency/efficiency (other than overall benchmarking) –Therefore not driving continuous productivity growth –The AER is relying on the “incentive mechanisms” (EBSS, CESS, STPIS) to encourage ongoing improvement 10

The AER reduces SAPN’s proposed revenues by ≈32% 11 Source: AER, Preliminary decision SA Power Networks distribution determination, Attachment 1, Figure 1.2, p 1-11 Savings benefits to consumers roll forward

Average price path ($ nominal) 12 AER, Preliminary decision SA Power Networks distribution determination, Attachment 1, Figure 1.3, p 1-12, using weighted average price changes submitted by SAPN adjusted to allowed revenue. Relative saving figure of 8.5% derived from AER, p 1-14 which states AER PD average decrease of 7.0% pa, SAPN average increase of 1.7% pa Overall, average of≈ 8.5% pa reduction in average nominal prices compared to SAPN’s proposal -25.8% -1.9% -7.6% +2.6%

SAPN’s Operating Costs ($ ) 13 Some things to note: In past, SAPN’s actual opex has closely matched the regulatory allowance. Suggests the EBSS has had limited effectiveness? Opex in , ≈50% more than SAPN’s proposed opex, ≈100% more than (in real $) The increased opex has resulted in a decline in opex efficiency since 2006 (e.g. MPFP) However, the AER has accepted the opex as the “base year” for forecasting opex If the AER accepted SAPN proposal, then base year” for would be ≈$320M ($14- 15)! The AER’s PD is still (just) above average of in $14.15 Source: AER – Preliminary Decision SA Power Networks distribution determination, Attachment 7 – Operating Expenditure, April 2015, Figure 7.1, p % cumulative

The AER’s assessment of SAPN’s proposal (All figures expressed in $ ) 14 AER Assessment Approach SAPN Proposal AER Response CCP View Base YearActual net opex of ≈$1,202M Largely accepts SAPN’s base year; net opex of $1,196 Sets a high base cost for given “slope” of opex in Rate of ChangeAdd $108MLargely rejects, AER allows $27M Agree with AER except for 0% productivity over period Step ChangeAdd $217MLargely rejects; AER allows $4M Agree with AER Total Change over Base Year Add $325M (Total = $1,527M) Add $31M (Total = $1,226M) AER base year high & should include some productivity gain over period Source: AER Preliminary Decision, Attachment 7 – Operating expenditure, Figures 7.2 (p 7-9) & 7.4 (p 7-20). Numbers may not add due to rounding

The AER finds SAPN’s additional opex does not meet expenditure criteria 15 Forecast Annual Rate of Change in opex (%) Forecast step changes ($ ) Source: Table 7.4 (p 7-22) & Table 7.5 (p 7-23). The Rate of Change includes price (e.g labour/material costs) and output changes (e.g. customer numbers, peak demand, line length). AER’s step change of $9.1M includes a negative step change for licence fee of -$5M. Net step change allowed is therefore $4M.

AER’ s Rate of Change Assessment Example: Labour costs Rate of change: –SAPN proposing increases in labour rates of 1.5 – 2.0% pa above CPI SAPN bases this on existing EBA and trend estimate after that –Many submissions state that this is too high given current circumstances –AER rejects SAPN proposal and the CCP agrees Existing EBA is not sufficient basis to set forecast allowance (taken on its own) Incentives for effective and accountable management lost AER must make its decision on the basis of prudent & efficient benchmark costs Up to SAPN management to decide optimal approach to overall wage bill given the AER’s overall opex decision 16

SAPN’s Capital Expenditure ($ M, net), 17 BBBBBBBB Some things to note: Historical capex closely matched allowance Suggests SAPN has adopted a reasonable approach in the past SAPN’s capex is an increase over SAPN’s proposed capex is over 55% greater than (in real $) The increases in capex flow through to more rapid growth in the RAB And lead to decline in productivity (given no growth in demand) The AER’s Preliminary Decision represents a small increase (in real dollar terms) compared to actual capex But, the AER’s decision is approx 33% reduction compared to SAPN’s proposal for Source: AER, Preliminary Decision SA Power Networks distribution determination, Attachment 6, Figure 6-1, p The figures are adjusted for an error in the AER data. Used to prepare the chart and Y axis label removed as it incorrectly stated that the chart was in $ )

SAPN’s proposal would lead to significant decline in relative capex efficiency ($000s, ) 18 Source: AER, Preliminary Decision, Attachment 6, Capital Expenditure, Figure 6-4 (p 6-27)

AER’s decision reflects stakeholder submissions 19 Replacement Capex: Down ≈ 20% c/p to SAPN proposal But more than 60% above AER does not support rate of replacement (given age) or significant increase in risk Augmentation Capex: Down ≈ 45% c/p to SAPN proposal Reflects low growth overall But provides for local growth AER does not support additional bushfire & safety related capex & reliability expenditure Other “discretionary” projects rejected Kangaroo Island goes ahead Non-Network Capex: Down ≈ 35% c/p to SAPN proposal IT deliverability/prudency? Property/vehicles prudency?

What does ESCOSA say about reliability and service requirements? ESCOSA sets the reliability & services standards for SAPN: –Reviewed in 2014 to apply for regulatory period –Designed to align closely with the AER’s STPIS scheme –Regularly monitors and assesses SAPN’s reliability and service standard performance; Along with the OTR –Previously conducted Willingness to Pay studies (WTP) when setting standards ESCOSA did not appear to expect the 2014standards to increase costs: –“ Based on SA customers’ continuing high levels of satisfaction with average reliability and customer service performance, there appears to be no need to increase the levels of service set, and hence the cost associated with meeting these levels…” (ESCOSA, Final Decision, SAPN Jurisdictional Services Standards for the Regulatory Period, May 2014, p 8) –“the reliability targets for the regulatory period will be set based on the most recent five years of reliability performance data to reflect the impacts of recent investment decisions by SAPN”. (ESCOSA, Fact Sheet – SAPN Jurisdictional Service Standards …Final Targets, Oct 2014, p 2) –“SAPN’s distribution network must be built to perform consistently within normal weather conditions…Network reliability measurements and improvements should focus on performance during the normal course of events and efficient restoration practices when the network is under unusual stress”. (ibid, p 3). 20

ESCOSA: SAPN’s reliability at a glance (summer ) 21 Of the 730 outages in summer of , only 23% were due to equipment failure. Over the whole year, average percentage of total faults caused by SAPN’s equipment failure was 19% (across to ) Source: ESCOSA, Infographic, “Summer 2014/15 SA Power Networks’ reliability at a glance” & ESCOSA, Annual Performance Report – Electricity Distribution

AER establishes some important assessment principles The emphasis in incentive regulation is on management accountability for its priorities & decisions The AER approves (or replaces) the total capex and opex expenditure allowances –The AER does not “approve” specific projects –up to the businesses to set priorities for specific capex or opex projects The AER does not prevent businesses from spending more than their regulatory allowances, but : –Overspend opex, then additional costs are borne by owners out of profits/retained earnings (the EBSS) –Overspend capex, then - assuming expenditure is found (ex post) to be efficient and prudent - additional capex may become part of the future RAB And options are available for SAPN to seek pass through allowance for unexpected events/costs –SAPN has already done this for increased vegetation costs 22

AER’s assessment principles (2) The AER assumes that a business has been operating efficiently (subject to benchmarking tests!) –Therefore, if no material change in circumstances, AER’s starting assumption is there is no need for additional expenditures –Up to the network to establish material change & that additional expenditures are prudent and efficient Expenditure initiatives designed to improve network efficiency are not (per se) recognised as pass-through costs to consumers –The network will be rewarded through incentive schemes (EBSS, CESS) –Should be undertaken on a business case basis Expenditure to improve reliability of network (above regulatory standards) are not (per se) recognised as pass through costs –The network will be rewarded through STPIS/public image … Discretionary expenditure will not (per se) be compensated for Programs with broad community benefit/stakeholders should not be funded by electricity consumers (unless through change of regulation), e.g. –A coherent and multidisciplinary response to bushfire &/or undergrounding 23

CCP’s Response to these Principles Strongly support the AER’s overarching principles of management accountability These are particularly important in the context of SAPN’s proposal for very significant increases in expenditure allowances –Which will lead to lower productivity, future price rises & inflated RAB The AER has provided SAPN with expenditure allowances that are in line with, or greater than, previous expenditures (in real $) –It is up to SAPN management to respond to this by setting priorities & driving efficiency –SAPN will be rewarded through the incentive schemes for doing this –In a time of declining/flat demand, this focus is essential What’s missing? –A clear strategy around demand management –More critical examination of historical expenditure efficiency –“Unbiased” use of regulatory discretion (e.g. WACC parameters) –Ambitious, more direct targeting of future productivity improvements –Assess proposals against the “competitive market test” 24

A Final Word About Customer Engagement CCP notes and appreciates that SAPN has conducted an extensive customer engagement program over a number of years –Customers have indicated that they appreciated this commitment –And, it will assist SAPN management to set priorities in its expenditures However, SAPN has used the customer engagement outcomes to justify very substantial increases in its expenditures: For example : –Significant additional expenditures on bushfire risk management, more undergrounding of assets, enhanced vegetation management - which are not required by regulation –Discretionary expenditures - things consumers say they would like, but are not required by regulation or industry practice –Note: SAPN can still spend on these, just not recover cost through the regulatory process SAPN must, therefore, be willing to face greater and more detailed scrutiny of its engagement And take appropriate account of the many submissions on customer engagement and its use by SAPN to justify additional expenditures 25

A Final Word About Consumer Engagement (2) While SAPN considers its research is appropriate: –Direct feedback to the CCP tells a somewhat different story –Consumer submissions have raised considerable concerns about using the research to justify increased expenditures Find it problematic that low income households would be willing to pay for additional services (as stated by SAPN) given their feedback from consumers Concern that consumers did not really have sufficient knowledge and/or did understand the options SACOSS research (2014) – 93% of respondents want reduction in price of electricity, onlly 7% comfortable with existing prices & 25% with difficulties/stress about electricity bills –Business submissions claim SAPN’s research does not reflect their members views: Price reductions are the No 1 priority for 87% of its members/89% not willing to pay for any increase in reliability –The state government has expressed concerns about some programs –ESCOSA’s previous research indicated consumers were comfortable with current service standards –AER’s consultant cautioned about using study to justify large increases 26

CCP has its own concerns & supports AER’s caution Did consumers have sufficient knowledge of : –the industry & its regulation to really understand the trade-offs between price & service –The actual outcome of the investment options (ie. not just cost, but lives saved etc) –the long term consequences of additional investment –the existing processes/penalties & rewards in place (e.g STPIS/GSL) –The current level of service being delivered by SAPN? Did consumers understand that other parties had equal or more responsibility for managing the states bushfire risks & road safety (for instance)? Did consumers have a clear option put to them that the alternative was a significant reduction in energy prices, within current levels of service? Did framing the questions around a “CPI cap” influence the trade-off? –Statement only true because of reduction in WACC/hides the impact of the total costs Did consumers understand the “risks”; eg: –If interest rates increase, or demand declines then increased expenditures will lead to higher than CPI prices –Particularly because adds circa $300M to the RAB – to be paid off over 30 years! 27

Concluding comments from the CCP Much progress has been made, but CCP considers more to go: We remain concerned about –The assessment of the WACC & the history of very high profits for SAPN (& others) –The AER’s approach to setting the efficient frontier and applying the benchmarks –The long term issue of the RAB value & declining demand –The potential for “status quo” thinking when SAPN’s customers are facing international competition and price/cost pressures –Are the rewards & penalties in the incentive schemes sufficient to overcome inertia –The approach to regulation that has led to volumes of “evidentiary” material Consumer input has been invaluable to the CCP – and to the AER –We hope that SAPN will also take note of the many submissions –AND please, please keep it up Still some stormy waters ahead… –This is a preliminary determination, –The AER is committed to revisiting some areas of expenditure/WACC to be updated –Potential for SAPN to appeal the AER’s decision –But consumers can appeal too (or intervene or provide additional information) 28

THANK YOU 29