Unit 6 – Risk Management and safety management system

Slides:



Advertisements
Similar presentations
Session No. 2 Introduction to Safety Management. The First Ultra-Safe Industrial System Ultra-safe system (mid 1990s onwards) Business management approach.
Advertisements

Risk Management Introduction Risk Management Fundamentals
Operational Risk Management (ORM)
OPERATIONAL RISK MANAGEMENT
RISK ANALYSIS.  Almost all of the things that we do involve risk of some kind, but it can sometimes be challenging to identify risk, let alone to prepare.
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Naval Safety Center School Of Aviation Safety. The process of detecting hazards and assessing associated risks The process of detecting hazards and assessing.
System Safety: A systematic processes
RISK MANAGEMENT FORCE XXI
Functional Check Flights Presented by Wally Istchenko Chief Flight Test Transport Canada Functional Check Flight Symposium February 8-9, 2011 Vancouver,
AIR ACCIDENT PREVENTION Presented by Rex Hamza Aviation Safety Inspector-Guyana Civil Aviation Authority.
OPERATIONAL RISK MANAGEMENT
Operational Risk Management for Airport Emergency Planning
Operational Risk Management
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
A Safety Management System (SMS) is: “A systematic approach to managing safety, including the necessary organizational structures, accountabilities,
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
S-271 Helicopter Crewmember Slide 7D-1 Unit 7D Operational Safety - Lesson D: Parking Tender and Miscellaneous Roles and Responsibilities.
Personal Integrity Excellence Service Before Self RelationshipsJoy Safety Always Foundation: Our Core Values.
SMS Implications for Education Jim Dow Chief, Flight Training & Examinations Transport Canada Presentation to National Training Aircraft Symposium
Hazard Identification
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
OPERATIONAL RISK MANAGEMENT
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Slide 1Lesson 14: Fundamentals of the CAP Flying Safety Program Fundamentals of the CAP Flying Safety Program.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
OPERATIONAL RISK MANAGEMENT. The Benefits of Risk Management Reduction in Material and Property Damage. Effective Mission Accomplishment. Reduction in.
Air Operations Branch Director Course Safety Part 2 Risk Management U.S. AIR FORCE AUXILIARY U.S. AIR FORCE AUXILIARY.
Introduction to Risk Management MR. D.C. Weightman Deputy Director HQMC(Safety Division)
OPERATIONAL RISK MANAGEMENT
Liability Issues for TRIO Programs Managing Your Project’s Risk.
Risk Benefit Risk Management SSG MACK.
OPERATIONAL RISK MANAGEMENT
SMS, Human Factors and FRMS – A Perspective Capt. Dan Maurino RAeS HF Group Conference on Building Fatigue into Safety Systems Crawley, 30 October 2012.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
1 Safety - definitions Accident - an unanticipated loss of life, injury, or other cost beyond a pre-determined threshhold.  If you expect it, it’s not.
Col. Francis S. Gabreski Squadron Col. Francis S. Gabreski Squadron Operational Risk Management.
SMS for a Modern Flight Training Organization
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
How to Supervise Evaluate
Risk management Be aware. Take care. Hazards exist wherever you work. They can place you and others at risk.
Ensuring the Safety of Future Developments
Presented to: By: Date: Federal Aviation Administration Safety Risk Management: What does it mean to me? Sun-&-Fun 2008 Mike Halloran - FAA Safety Team.
CATASTROPHIC (I) Loss of ability to accomplish the mission or mission failure. Death or permanent total disability (accident risk). Loss of major or mission-critical.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
LECTURE 7 AVIATION SAFETY & SECURITY
Safety Management Systems Session Two Safety Risk Management APTA Webinar April 28, 2016.
Ranjan kumar Assistant Manager CCL,Ranchi
Risk management Be aware. Take care.
Civil Air Patrol BASIC LEVEL OPERATIONAL RISK MANAGEMENT
DEFINITIONS.
Quality Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
Risk Assessment Matrix
Risk Benefit Risk Management. Risk Benefit Risk Management.
Operational Risk Management (ORM) and the Driving Task
Unit I Module 3 - RCM Terminology and Concepts
Introduction to Risk Management.
RISK MANAGEMENT Overview
SELDOM (D) Remotely possible; could occur at some time
A Safety Management System (SMS) is: “A systematic approach to managing safety, including the necessary organizational structures, accountabilities,
Presentation transcript:

Unit 6 – Risk Management and safety management system

Unit Objectives Describe the Risk Management process as applied to helicopter operations. Explain the purpose of the Safety Management System (SMS). Unit 6 Risk Management

Risk Assessment and Management What is Risk Assessment? Risk assessment is the process which associates “hazards” with “risks.” Risk assessment is the initial part of the risk management process which includes: Identifying know hazards and Analyzing the degree of risk associated with each hazard Unit 6 Risk Management

Risk Assessment and Management Risk Management Process Risk management is a continuous systematic process of identifying and controlling risk in all activities according to established parameters. This process includes detecting hazards, assessing the risk, and implementing and monitoring risk controls to support effective, risk based decision making. Unit 6 Risk Management

Five Steps to Risk Management Identify Hazards – Situation Awareness Assess the Hazards – Hazard Assessment Develop Controls Make Decisions – Hazard Control Implement Controls – Decision Point Supervise Unit 6 Risk Management

Risk Management Applied Step 1 – Identify Hazards – Situation Awareness Unit 6 Risk Management

Risk Management Applied What is a hazard? Any real or potential condition that can cause: Mission degradation Injury Illness, or death to personnel Damage/loss of equipment or property Unit 6 Risk Management

Risk Management Applied Factors that Determine Hazards Weather Time of flight Terrain Equipment Wires Military training areas Take-off and landing weights Training and proficiency level of personnel Unit 6 Risk Management

Risk Management Applied RISK FACTORS are divided into four categories for hazard identification: Man Machine Medium Method Known as the “4Ms Risk Factors” Unit 6 Risk Management

Risk Management Applied Step 2 – Assess the Hazards – Hazard Assessment Unit 6 Risk Management

Risk Management Applied Each of the hazards should be identified and analyzed by examining: The effect on personnel/equipment should a hazard be encountered. The probability that a hazard will be encountered. Unit 6 Risk Management

Risk Management Applied Effect – If a hazard is encountered during a mission, the effect may be: Catastrophic – Death or serious injury Critical – Serious injury, damaged equipment Moderate – Mission accomplished, adverse effects Negligible – No effect, mission accomplished Unit 6 Risk Management

Risk Management Applied Probability – The probability of encountering a hazard during a mission may be: Frequent – Continuously or often Likely – May encounter several times Occasional – May encounter sporadically Seldom – Encountered infrequently, remote Unlikely – Rarely, possible, but improbable Unit 6 Risk Management

Risk Management Applied How to determine the risk? Determine the severity, probability and exposure with each hazard. Determine the risk associated with the combined hazards. Initial assessment may indicate risk level(s) unacceptable. Once controls are implemented, risk level(s) may be at an acceptable level. Unit 6 Risk Management

Risk Management Applied Step 3 – Develop Controls Make Decisions – Hazard Control Unit 6 Risk Management

Risk Management Applied What is a risk decision? Weigh the risk against the benefits of performing a mission. Be aware that the mentality, even during non-emergency operations may be mission-oriented (get the job done). Unit 6 Risk Management

Risk Management Applied Risk Decision Tips: Involve operational personnel, especially those impacted by the risk decision. Apply redundant risk controls when practical and cost effective. Make risk decisions when benefit out ways the cost. Unit 6 Risk Management

Risk Management Applied Who should make a risk decision? Decision should be made at the level that corresponds to the degree of risk associated with that mission. Majority of the decisions that you will be associated with will be made by the Helicopter Manager. Unit 6 Risk Management

These ratings based on unmitigated hazards Composite Risk Level I II III IV Low Frequent Likely Occasionally Seldom Unlikely Hazard Probability A B C D E Extreme High Medium Catastrophic Critical Moderate Negligible Effect (1) (2) (4) (3) (5) (6) (7) Event Effect Probability Risk Level 1) Low Speed/Low altitude/over trees Catastrophic Frequent Extreme 2) Aircraft Operation w/doors removed Catastrophic Occasional High 3) Unimproved Landing Zone Critical Likely High 4) Crew Fatigue Critical Likely High 5) Blade Strike Occasional Critical High 6) Engine Failure Catastrophic Unlikely Medium 7) Weather Moderate Likely Medium These ratings based on unmitigated hazards Unit 6 Risk Management

Risk Assessment Matrix Unit 6 Risk Management

Risk Management Applied Step 4 – Implement Controls – Decision Point Unit 6 Risk Management

Risk Management Applied What are controls? A control is any kind of action that is taken to mitigate the risks that have been identified. These controls can range from writing a special-use action plan to simply conducting a short safety briefing. Unit 6 Risk Management

Risk Management Applied Once controls are implemented, reassess hazards to ensure that risk(s) have been mitigated to an acceptable level of safety. Unit 6 Risk Management

Risk Management Applied Incorporate selected controls into: Brief the pilot Brief personnel Weigh and prioritize loads Evaluate helispots Unit 6 Risk Management

Risk Management Applied Step 5 - Supervise Unit 6 Risk Management

Risk Management Applied How do you supervise control actions? Brief – Ensure personnel know what to do Follow-up – People are doing what is expected Update – Evaluate the plan continually Adjust – Make changes as issues arise Debrief – After mission is completed Incorporate – Lessons learned for future use Unit 6 Risk Management

Safety Management Systems (SMS) The ultimate goal of SMS is to provide an organizational framework or roadmap for developing and promoting a true safety culture, ultimately reducing our accident rate. Unit 6 Risk Management

Safety Management Systems (SMS) What does SMS do for us? Takes a proactive, “systemic” (big-picture) approach to managing Aviation safety Helps identify hazards and control measures to reduce risks Provides for ongoing “quality assurance” Unit 6 Risk Management

Safety Management Systems (SMS) SMS is based on the following premises: Every person in the organization accepts that safety is a conscious and ongoing mindset as opposed to simply a box to be checked. Unit 6 Risk Management

Safety Management Systems (SMS) Four “Pillars” or Components of SMS Safety Policy Safety Risk Management Safety Assurance Safety Promotion Unit 6 Risk Management

What do each of the four pillars mean to you? Discussion Point What do each of the four pillars mean to you? Unit 6 Risk Management

Unit Objectives Describe the Risk Management process as applied to helicopter operations. Explain the purpose of the Safety Management System (SMS). Unit 6 Risk Management