SAOCOM Mission Update Laura Frulla CONAE 1.

Slides:



Advertisements
Similar presentations
Environmental Application of Remote Sensing: CE 6900 Tennessee Technological University Department of Civil and Environmental Engineering Course Instructor:
Advertisements

Surface Water and Ocean Topography (SWOT) Satellite Mission
GCOM/AMSR2 status Earth Observation Research Center and GCOM Project Team Japan Aerospace Exploration Agency AMSR-E Joint Science Team Meeting Huntsville,
CHRIS (Compact High Resolution Imaging Spectrometer) sira group sira electro-optics Dr Mike Cutter EO & Technology Business Manager.
On Estimation of Soil Moisture & Snow Properties with SAR Jiancheng Shi Institute for Computational Earth System Science University of California, Santa.
Jet Propulsion Laboratory California Institute of Technology The NASA/JPL Airborne Synthetic Aperture Radar System (AIRSAR) Yunling Lou Jet Propulsion.
NovaSAR-S: A Low Cost Approach to Applications
Oil spill off NW coast of Spain IKONOS image Oil reaching shore.
Space experiment on the International Space Station with P-band SAR Space experiment on the International Space Station with P-band SAR B.Kutuza, A.Kalinkevitch,
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programme SDCG-6 | 23 October 2014 | Oslo The European Copernicus Programme.
SDCG-6, Oslo, Norway – Oct of 18 SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission Mission update 2014 and outline of the Global Background.
DLR IPY Data Portfolio: TerraSAR-X High Resolution SAR Data from Space Erhard Diedrich Head of Division International Ground Segment DLR – German Remote.
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
Meteorological satellites – National Oceanographic and Atmospheric Administration (NOAA)-Polar Orbiting Environmental Satellite (POES) Orbital characteristics.
Mission updates RADARSAT CONSTELLATION MISSION
Hyperspectral Satellite Imaging Planning a Mission Victor Gardner University of Maryland 2007 AIAA Region 1 Mid-Atlantic Student Conference National Institute.
Spaceborne Weather Radar
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
Slide: 1 27th CEOS Plenary |Montréal | November 2013 Agenda item: 37 Joost Carpay, Netherlands Space Office CEOS PLENARY – Netherlands Activities.
SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission Mission update 2014 and outline of the Global Background Mission Laura Frulla CONAE CEOS SDCG-5.
Initial Results on the Cross- Calibration of QuikSCAT and Oceansat-2 Scatterometers David G. Long Department of Electrical and Computer Engineering Brigham.
Page 1 IGARSS, Denver, July 31-Aug 4, 2006 Sentinel-1 Mission Concept Malcolm Davidson, Evert Attema, Bjorn Rommen, Nicolas Floury, Laura Moreno Patricio,
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
SDCG-4, Pasadena, CA/USA September 4-6, 2013 SDS-4 Session 2 Mission updates ALOS-2 JAXA Masanobu Shimada.
ALOS-2 Mission Status and Basic Observation Scenario (BOS)
IGARSS’11 Compact Polarimetry Potentials My-Linh Truong-Loï, Jet Propulsion Laboratory / California Institue of Technology Eric Pottier, IETR, UMR CNRS.
COSMO-SkyMed Products and Services
Page 1 ASAR Validation Review - ESRIN – December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in.
Session 10: Space Data Support to GFOI R&D DLR Contributing Data Stream Report SDCG-7 Sydney, Australia March 4 th – 6 th 2015 Helmut Staudenrausch, DLR.
Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programme SDCG-8 | 23 September 2015 | Bonn Sentinel-1 and -2 Core Data.
SHIP DETECTION USING X BAND DUAL-POL SAR DATA S. Angelliaume (ONERA) Ph. Durand, J.C. Souyris (CNES)
CEOS 4 th SDCG Meeting DLR contribution Dr. Helmut Staudenrausch DLR Space Administration, Earth Observations Chart.
- Microwave Remote Sensing Group IGARSS 2011, July 23-29, Vancouver, Canada 1 M. Brogioni 1, S. Pettinato 1, E. Santi 1, S. Paloscia 1, P. Pampaloni 1,
Excerpts from Tom Jackson’s slides shown at Nov 2013 SMAP CalVal workshop with comments added by E. Kim in green TJJ–1 Green comments added by E.Kim.
Mission updates 1 RADARSAT CONSTELLATION MISSION Canadian Space Agency Yves Crevier
1 IICWG, October 2007 RCM Capabilities for Ice & Sea-Ice Applications IICWG … G. Séguin, R. Girard, Y.Crevier.
IEEE IGARSS Vancouver, July 27, 2011 On the potential of TanDEM-X for the retrieval of agricultural crop parameters by single-pass PolInSAR Juan M. Lopez-Sanchez.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
CCAR / University of Colorado 1 Airborne GPS Bistatic Radar in CLPX Dallas Masters University of Colorado, Boulder Valery Zavorotny NOAA ETL Stephen Katzberg.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
Page 1 ASAR Validation Review - ESRIN – December 2002 IM and WS Mode Level 1 Product quality update F Introduction F IM Mode Optimisation F Updated.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Conception of a global SAR mission for land imaging on the tropics Gilberto Câmara Director General National Institute for Space Research (INPE) Brazil.
GCOM-W1 Status Keizo Nakagawa 1, Norimasa Ito 1, Marehito Kasahara 1, and Keiji Imaoka 2 1 GCOM Project Team 2 Earth Observation Research Center (EORC)
Commercial Space-based Synthetic Aperture Radar (SAR) Application to Maritime Domain Awareness John Stastny SPAWAR Systems Center Pacific Phone:
HSAF Soil Moisture Training
Environmental and Disaster Monitoring Small Satellite Constellation
Overview of NovaSAR September 2016.
BNSC Agency Report to WGISS21 Budapest, May 2006 Wyn Cudlip
Canadian Space Agency Contribution to the SDCG Element 3 Component
Preparing for the Production of Essential Climate Variables (ECVs) for Biomass from Future Spaceborne Remote Sensing Missions: Is There A Role for CEOS-Carbon?
Russian Remote Sensing System:
Alternating Polarization ´Single´ Look Complex Product Status
Overview of NovaSAR.
SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission
Calibration Activities of GCOM-W/AMSR2
Objectives Using a time series of data from radar sensors to detect and measure forest changes Combining different types of data, including: Multi polarisations.
Sentinel-1 Mission Status
Measurements of the Moon by CLARREO Pathfinder and ARCSTONE
Estimationg rice growth parameters using X-band scatterometer data
INPE, São José dos Campos, SP, Brasil
Update on EO Programmes Italian Space Agency Plenary Agenda Item #30
(L, C and X) and Full-polarization
ISRS2007, Lamada Plaza Hotel, Jeju, Korea, 31 October - 2 November 2007 Radargrammetry of High-Resolution Synthetic Aperture Radar A Theoretical Study.
A Presentation by Shane Doddridge
Worldview II Launched October 8, 2009 Altitude: 770 km
Soil Moisture Active Passive (SMAP) Satellite
RADARSAT Constellation Mission Update
Introduction to SAR Imaging
Presentation transcript:

SAOCOM Mission Update Laura Frulla CONAE 1

Mission Update Mission Critical Design Review (M-CDR) in Nov. 2013 Passed OK Flight Segment Qualification Review Step 1: July 2015 SAR Instrument Qualification Review: July 2015 Flight Segment Qualification Review Step 2: July 2016 Ground Segment Qualification Review: July 2016 Launch Readiness Review PFM: November 2016 Launch schedule: SAOCOM 1A: November 2016 SAOCOM 1B: October 2017 2

SAOCOM General Features(1/2) instruments Polarimetric L band SAR (1,275 GHz) (SAOCOM 1A/SAOCOM 1B) orbit sun synchronous nearly circular frozen polar inclination 97.89° altitude 620 km local time of asc. node 06:12 am time for one orbit 97.2 minutes revisit 16 days (1 satellite)/8 days (constellation) mission lifetime 5 years commissioning 6-9 months 3

SAOCOM General Features(2/2) looking direction right (nominal)/left (capability) right looking continuous acquisitions of 10 minutes when the satellite is in visibility of ETC 15 minutes per orbit as an average on a daily basis 20 minutes of non continuous acquisitions in an orbit left looking up to 5 minutes, according to resources and preserving spacecraft safety, returning afterwards to the nominal side looking acquisition modes real time/stored coverage world wide 4

observation capability day/night/all weather σ° (measurement range) SAR Features observation capability day/night/all weather σ° (measurement range) -35 to 5 dB absolute radiometric accuracy less than or equal to 0.5 dB (QP) less than or equal to 1.0 dB (SP, DP) polarimetric accuracy less than or equal to 0.3 dB geolocation accuracy depends on precise orbit determination on line (56 h) 90 m on line (108 h) 70 m off line (18 days) 25 m 5

SAR Antenna Panel EM stage 2 SAR Instrument EM SAR Antenna Panel EM stage 2 SAR CE EM1 – Dummy load SAR CE EM1

Antenna Deployment

SAOCOM 1B Launch/Orbital Formation CM CS SR SARE Constellation-x4 (CONAE) ~ 2 years IR Inter-satellite link GPS Differential Unit Star tracker/laser units (constelation position) Software Defined Radio (ground data collection) TR module (Faraday rotation estimation) ESA SAOCOM Companion (receive only) ~ 5 years

SAOCOM-CS/TANGO Science and Observation Geometry: Formation flying Tomographic phase (880 days) AT baseline < 6km XT baseline varies ~1–6 km Science mission driver Duration ~2.5 years SAOCOM CS (ESA) SAOCOM (CONAE) Illuminated scene “Bird-eye view” Bistatic 1, Bistatic 2 (720 days) AT baseline < 250 km Small XT baseline (phase 1) Large XT baseline (phase 2) Duration ~2 years Specular phase (160 days) Experimental Short duration lifetime~ 5 years

SAOCOM Nominal Modes Features acquisition mode polarization swath width spatial resolution minimum incidence angle range StripMap SP: HH or HV or VH or VV > 40 km < 10 m 21 - 50 DP: HH/HV or VV/VH QP: HH/HV/VH/VV > 20 km 20 - 35 TOPSAR Narrow > 150 km < 30 m 25 - 45 > 100 km < 50 m TOPSAR Wide > 350 km QP(1): HH/HV/VH/VV > 220 km < 100 m CL-POL: RH/RV or LH/LV (1) TOPSAR Wide QP assigned for Strategic Applications 10

StripMap and TOPSAR modes 9 possible polarization combinations L1 Product Definition 25 swaths StripMap and TOPSAR modes 9 possible polarization combinations SP: HH or HV or VH or VV DP: HH-HV or VH-VV QP: HH-HV-VH-VV CP*: LH-LV or RH-RV *Technological mode

Product Tree Ref: SAO-MIS-HB-00001-A

TOPSAR Quad pol modes StripMap 10 quad-pol beams in elevation allow maximum coverage of 220 KM 3 different spatial resolutions [m] 100 (az) x 10 (rg) WIDE 50 (az) x 10 (rg) NARROW 6 (az) x 10 (rg) STRIPMAP TOPSAR Wide 220 km The TOPSAR mode is exploited : LOW scalloping Wide coverage High resolution Scanning timeline optimization possibility TOPSAR Narrow A 110 km StripMap TOPSAR Narrow B 110 km S1 QP S2 QP 35° ScanSAR TOPSAR S10 QP TOPSAR mode chosen to maximize coverage versus geometric & radiometric resolution

Products Processing Levels RAW data products (data stream), Level 0 products (Annotated RAW data-AR) Level 1 products Level 1A: Single Look Complex-SLC, Level 1B: Detected Image-DI, Level 1C: Ground Ellipsoid Corrected-GEC (default), Level 1D: Geocoded Terrain Corrected-GTC. Higher level products In relation to the products processing levels for SAOCOM, they will be the same that you surely well know, let say: - RAW data, - Level 0, composed by the Annotated RAW data, Level 1, with the common different levels of corrections: 1A for Single Look Complex, 1B for Detected Image, 1C for Ground Ellipsoid Corrected image which is the default processing for the Strategic Applications, 1D for Geocoded Terrain Corrected images and Higher level products 1) Level 0 – Annotated Raw Data (AR) This product is obtained from the binary data stream: Raw Data (RAW) and it consists of time ordered echo data, synchronized, with format, obtained after decryption, packed, including all the auxiliary and secondary data, identified in date and time by UTC coordinates (Coordinated Universal Time). This product is required to produce the other basic and intermediate products, and also to get information about navigation, TT&C, etc. 2) Level 1A – Single Look Complex (SLC) Level 1A Products are generated from Level 0 Products by applying SAR focusing processing, and include both internal calibration (I/Q channels bias and I/Q channel gain unbalance), and external calibration (correction of antenna pattern in azimuth and elevation and spreading loss compensation). Level 1A Products are phase preserving and are projected in slant range (no geometric corrections are performed). They are provided with the auxiliary data mentioned in the Level 0 Product definition. Level 1A Products are not amplitude images, as they’re composed by real and imaginary components (complex data type), 3) Level 1B – Detected Image (DI) Level 1B Products are generated from Level 0 Products by applying SAR focusing processing. They are amplitude images ground projected onto a given reference ellipsoid. The generated amplitude images are geo-referenced (i.e. each pixel of an image is associated with coordinates given in a geographic reference system, e.g.: WGS 84). 4) Level 1C – Ground Ellipsoid Corrected (GEC) processing. The generated amplitude images are geo-coded, that is, the image is rectified according to a particular map projection, i.e. Gauss Krügerr. In this way, the image grid is aligned with the chosen map projection grid. There is no correction applied for terrain distortion and there is no use of Ground Control Points (GCP). 5) Level 1D Products are generated from Level 1C. using GCPs and Digital Elevation Models. This products are geocoded amplitude images, that is, the images are rectified according to a particular map projection. In this way, the image grid is aligned with the chosen map projection grid; the residual error of the correction depends on the accuracy of the GCPs and on the DEMs. In this case, the image distortion effects due to topography are reduced. 14

SAOCOM Science Team and Applications Component SAS SIS SOS PI L. Frulla Deputies G.R. Ortega- J. Milovich Announcements of Opportunity Projects PIs of the different projects Science Team M. Thibeault External Calibration M. Thibeault/Deputy: T. Zajc Soil Moisture D. Dadamia Support System for Decision Making in Agriculture H. Lozza Risk Hydrological Emergency Management M. Uriburu Field Campaign A. Soldano Wheat Head Blight Disease Forecast System M. Acuña SAS Interferometry M. Azcueta Deputy: N. Grunfeld SIS Science Processors A. Lorenzo As for the SAOCOM Applications Component it is composed by the applications developed in the frame of the projects presented in the SAOCOM announcements of opportinuty and the Strategic Applications. SECFD: SAR Engineering Calibration Facilities, Development Sector @ Buenos Aires Oil Spill and Object Detection M. Jáuregui/Deputy: M. Camuyrano SOS DEM A. Soldano/Deputy: N. Grunfeld Snow Cover Estimations N. Grunfeld Biomass and Forest Carbon Capture A. Lorenzo 15

SAR CALVAL – Sites Status Institutional agreements (2 of 3 main sites defined) Main Sites El Sosneado (Malargue): Agreed for CR and PARC and partially installed CASLEO (San Juan): Agreed for CR, PARC agreement ongoing El Alambrado (Malargue): under study, first contacts made Support Sites DS3 (Malargue): back up option, first contacts made CETT (Cordoba): commissioning site and PARC testing site, partially installed Tierra del Fuego (Tolhuin)