Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Strengthening the Capacity of Water Utilities.

Slides:



Advertisements
Similar presentations
The Danube Water Program
Advertisements

1 © 1999 Deloitte Consulting Infrastructure Sub-processes In Scope – Plan and Manage Business.
Project 4 Ensuring Coordination, Evidence Based Programming, and Monitoring of the Peacebuilding Fund Projects in Uganda.
WATER REGULATORY AUTORITY OF ALBANIA ARJAN JOVANI, VICE – CHAIR OF NATIONAL COMMISSION OF W.R.A FLORENCE, 28 NOVEMBER 2013 OVERVIEW ON ALBANIAN WATER SECTOR.
Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites description the 2 nd PP meeting Portugal, 8-10 July 2013 Hydro-Engineering.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department USST Programme Phase I.
Stakeholder’s Workshop St Lucia National Forest Demarcation & Bio-Physical Resource Inventory August 19 th, 2008.
Islamic Republic of Afghanistan Ministry of Education EMIS Directorate.
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
Audit of Public Procurement
EDUCATION FOR THE NEW AGE: TRADITION, REFORM, INNOVATION Tradition and Reform in Secondary School.
MENA-OECD Investment Programme Draft Policy Considerations on Incentives Working Group 3 Meeting Cairo, Egypt 6-7 September 2006.
Project Implementation Plan and Principal Activities
GOVERNMENT OF ROMANIA MINISTRY OF PUBLIC FINANCE MANAGING AUTHORITY FOR COMMUNITY SUPPORT FRAMEWORK Evaluation Central Unit Development of the Evaluation.
Report from SAPCC Meet: Side Event on Indian Himalayan Region SAPCCs 27 September 2013, Kohima Sustainable Mountain Development Summit, Nagaland, 2013.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
With funding from the European Union DEVELOPMENT OF MONITORING INSTRUMENTS FOR JUDICIAL AND LAW ENFORCEMENT INSTITUTIONS IN THE WESTERN BALKANS
This project is funded by the European Union. TACSO Regional Office Potoklinica Sarajevo t: f:
With funding from the European Union DEVELOPMENT OF MONITORING INSTRUMENTS FOR JUDICIAL AND LAW ENFORCEMENT INSTITUTIONS IN THE WESTERN BALKANS
Enhancing Access to Information and Public Participation in Environmental Decision-making UNDP-GEF Danube Regional Project Component 3.4 Magda Toth Nagy,
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION Compliance with the Implementation of the Batho Pele Principle of Consultation.
Kick-off Meeting Belgrade, 4-5 December 2008 Network of Centres for Project Development and Management.
Element 3 Identify information technology equipment
Promotion of Community initiatives and territorial pacts in Czech Republic - Real Partnership in Operational Programmes ? 2012, EP, Brussels.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Dr. Ágnes TÖTTŐS Migration Expert/ Ministry of Interior, Department of European Cooperation/ Hungary Tel:
Performance Enhancement of Water and Sanitation Utilities in Kenya through Benchmarking and Collective Learning Dr Adriaan Mels - Vitens-Evides International.
Bosnia and Herzegovina Organizing national Gender Statistics Workshops - Lessons Learned Sub regional workshop on Gender Statistics, UNECE/WBI Skopje,
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Sustainable Output Plan Sheridan Technical Center.
Ministry for Public Administration and Local Self-Government PROJECT 1. Support for Strengthening Local Self-Government Capacities in the Context of the.
Working Group on Training: From Challenges to Opportunities Vienna, May With the financial support of:
Sixth Meeting of the Pacific Energy Advisory Group (PEAG) November 16 th – 18 th, 2015.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Highlights ( ) PEAG Meeting, Suva, Fiji November, 2015.
Developing a programme for the implementation of the 2008 SNA and supporting statistics Seminar on Developing a programme for the implementation of the.
BULGARIA’S EXPERIENCE WITH REGIONAL COOPERATION IN SOUTH-EAST EUROPE Veneta Petrova National Statistical Institute of Bulgaria MGSC, March 2011,
Global Partnership for Enhanced Social Accountability (GPESA) December 19, 2011 World Bank.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
PSUP OVERVIEW Programme time-frame - February December 2011 Total programme budget:  Euros 5,464,000 for 30 ACP countries  4,000,000 (EC - Intra.
Partnerships - Lessons Learned Partnerships - Lessons Learned Steen Bjerggaard IWA WOPs Coordinator Global WOPs Alliance Foundation Meeting Nairobi,
Tempus SMGR SE EU standards for accreditation of study programs on BH Universities Dejan Bokonjic University of East Sarajevo EU standards.
Monitoring Visit to NatRisk Project
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
Danube Water Conference 2017, Vienna
Local Leaders in South East Europe: Lead for Change
Excellent university for the researchers
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Project KA2-CBHE School-to-Work Transition for Higher education students with disabilities in Serbia, Bosnia & Herzegovina and Montenegro (Trans2Work)
Danube Water Conference, Vienna, May 2017
Assessment of the Evaluation Culture
“Support for reforms in budget and finance policy fields”
Excellent university for the researchers
OFFICE OF THE PUBLIC SERVICE COMMISSION
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Employment and Social Affairs Platform
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Excellent university for the researchers
Social Dialogue in the Slovak Republic
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Albania 2021 Population and Housing Census - Plans
Risto ivanov , PhD, CMC®, PMP Project manager
Association for Water and Environmental Protection Sector
Experience from Statistical Office of Montenegro – MONSTAT
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
Sugár György, Director, JKP Vodovod I kanalizacija Subotica, Serbia
SIXTH SOUTH ASIA REGION PUBLIC PROCUREMENT CONFERENCE: PROFESSIONALIZATION OF PUBLIC PROCUREMENT FOR BETTER PERFORMANCE.
Closing event 16th July 2019 Technical Assistance for Establishing the Institutional Framework for the Implementation of AIS/AES Project funded by the.
Presentation transcript:

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Strengthening the Capacity of Water Utilities in the Region with Benchmarking of key Performance Indicators Danube Water Conference Vienna, May 2015

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Project implementation period 07 March 2014 – 06 March 2015 Project budget: ,50 EUR ,50 EUR – funded through multidonor fund managed by the WB ,00 EUR – co-financing provided by the Vodovoda “Bistrica” Partnership Applicant: Vodovod “Bistrica “, Ltd. Bijelo Polje Partners: JKP “Lim”, Prijepolje JKP “6. mart”, Goražde Hydro-Engineering Institute Sarajevo - HEIS BASIC INFORMATION

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Goal Improving the management of public utilities, all with the aim of improving the quality of services provided by the utility company to citizens in its service area Location Bijelo Polje, Montenegro Prijepolje, Republic of Serbia Goražde, Bosnia i Herzegovina Phases Inception Phase – GAP Analysis Water Supply Network Mapping/ GIS Development Equipping of water utilities BASIC INFORMATION

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo ACTIVITY – INCEPTION PHASE HIRED CONSULTANTSPERIOD OF ACTIVITY Branko Vučijak, PhD Aleksandra Tomić – Ćato, dipl. Ecc. 1 August – 30 September AREAS COVERED BY ASSESSMENT Level of operational autonomy of the Utility Consumer relations Organizational structureMIS and Accounting StaffingRevenue collection and administration Network mapping and effective zoning and metering programme Tariff policy Non-Revenue Water ManagementFinancial Management

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo TOPICS AND RESULTS OF THE ANALYSE SCOPE OF ANALYSE 1.Analysis of the present state and processes 4. Required actions 2. Benchmark and current performance 5. Key Performance Indicators 3. Objectives, targets, defined and selected indicators RESULTS ACHIEVED GAP Assessment performed for each utility individually (each document individually has about 70 pages which concisely reflects the current state of the recommended interventions) Guidelines for Complaints and Proposals Management developed for each utility individually, including Customers’ Satisfaction Evaluation Questionnaire, Database of Proposals and Complaints, as well as Calculation of Key Performance Indicators Common areas for improvement within the project selected  Developed documents are compatible with other stretagic documents  Developed documents are of great importance for further development

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo ACTIVITY – EXISTING SYSTEMS MAPPING HIRED CONSULTANTPERIOD OF ACTIVITY iMD, Ltd. Sarajevo01 November 2014 – 28 February day tailor made training Sarajevo, November 2014 Consultants on the spot visits Prijepolje, 23 December 2014 Goražde, 29 January 2015 Bijelo Polje, 19 February 2015  In each on the spot visit all three utilities employees took participation – Know-how exchange

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Bijelo Polje Prijepolje Goražde EXISTING SYSTEMS MAPPING

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Achieved results: Six employees from three water utilities successfully accomplished training on digitalisation of existing networks and GIS development Utility „Bistrica“ Bijelo Polje mapped the whole primary water supply network, so as collected and inserted into the GIS all related data on these pipelines; Utility also mapped all pipelines to the level of secondary network, filed collection of related data will continue after the project implementation period Utility „Lim“ Prijepolje mapped all primary and secondary network, except one smaller settlement (lack of data); Utility „6. mart“ Goražde mapped primary network and presently is mapping secondary network and home connections, which is complement to existing cadastre of underground installations on the municipal geodesy department  Know-how exchange EXISTING SYSTEMS MAPPING

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo ACTIVITY – WATER UTILITIES EQUIPPING HIRED CONSULTANTPERIOD OF ACTIVITY FMS, Ltd. Bijelo Polje01 – 30. November 2014 WATER UTILITIES OBTAINED WITHIN THE PROJECT Bookkeeping of fixed assets module / software New procedures for water meters reading and improving of billing system Needed IT equipment and software ACHIEVED RESULTS Water utilities equipped with needed equipment and software, which will contribute to improvement of billing and bookkeeping of fixed assets, as well as tracking of consumptions, that will strengthen financial management of utilities Water utilities equipped with IT equipment and software for GIS development Vodovod „Bistrica“ Bijelo Polje built intranet that will contribute to more effective operations of enterprise

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo Equipment Pieces Total pcs BP GO PP Tablets85720 Desktop computer66416 Server computer with related equipment for computer network 1001 Printer for bills printing1113 Laser printer0202 Plotter A01001 Laptop za GIS1113 Monitor 22" 16:9 (for GIS)1113 Laptop OS0101 Multifunctional device (copier, fax, scanner) 0101 WATER UTILITIES EQUIPPING

Vodovod “Bistrica” Bijelo Polje JKP “Lim” Prijepolje JKP “6. mart” Goražde Institut za hidrotehniku Sarajevo WATER UTILITIES EQUIPPING Bijelo Polje Prijepolje Goražde