Offshore Developments

Slides:



Advertisements
Similar presentations
EOC LIMITED CORPORATE PRESENTATION MARCH 2011
Advertisements

An Operator’s View on Deepwater Floating Systems and Technology Development Ming-Yao Lee Manager of Offshore & Marine Engineering Chevron Energy Technology.
FPSO Mooring Monitoring & In-service Inspection FPSO Research Forum Richard Leeuwenburgh College Station – May 1 st 2003.
Copyright 2004 SIEP B.V. Shell Exploration & Production Morocco Offshore Potential and Promises John Crowle.
Rising to the Deepwater Challenges:
ECONOMIC DEVELOPMENT BENEFITS OF THE OIL AND GAS INDUSTRY IN NEWFOUNDLAND AND LABRADOR CONFERENCE ST JOHN’S NEWFOUNDLAND 16 MAY 2007.
GLOBAL WEATHER BY DESIGN FOR FPSOs By: Jill F. Hasling, CCM President Weather Research Center.
©2010 AIR WORLDWIDE CORPORATION CONFIDENTIAL 1 Quantitative Risk Assessment and Mitigation for Onshore and Offshore Assets Paolo Bazzurro, Ph.D. Akshay.
SHIPYARDS: Differences between Tankers and FPSO Specification
TRICERATOPS The Case for a New Deepwater Concept
Overview of the Floating Production Sector International Maritime Associates, Inc. — Washington, DC, USA — Tel: Fax: —
The Deepwater Gulf of Mexico International Maritime Associates, Inc. — Washington, DC, USA — Tel: Fax: —
Tulane University Visit Josh Etkind – Sr. Production Planner - EP Americas Shell E&P Co. SPE Intl. Board of Directors – Director at Large 07/10 SPE Intl.
MISC Advancing Offshore Solution
INSURING PROJECT CARGO What is it about? Infrastructure Projects Worldwide Oversized Cargoes High Insured Values Complex Logistics Requirements Projects.
Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Analyzing trends and technology for offshore oil and gas operations.
COAST Norway v.2002 (COmputer Assisted Shipping Traffic Database) Bjørn Øygarden.
Major Oil Regions of Today. Major Oil and Gas Regions: Alaska North Slope.
Hydrodynamic Analysis and Optimal Design of Floating Wind Turbine and Ocean Wave Energy Systems Paul D. Sclavounos Professor of Mechanical Engineering.
Offshore Oil Formation The formation of oil takes a tremendously long time. Millions of years ago plants and animals of the oceans died & settled on the.
1. Political Map of Latin America South America. 2. Political Map of Latin America Caribbean.
Doing business in a strictly regulated sector Experience from Norway Otto Beyer.
FUTURE FPSO PROJECTS IN THE DECISION-MAKING PROCESS
The Future of Solutions: Technologies for Increased Oil Recovery (IOR) Subsea IOR: Achievements & Future Vidar Sten-Halvorsen Technical Manager FMC Well.
Floating Production Systems
General_Presentation.ppt February 2010 Slide 1 R\200060\Commercial\Typing\_GeneralPresentation\Presentations DORIS\PresentationDORISDiapo\PresentationSimplifiée.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1) The history of Technip 2) Range of services
MFP – Installation using a Jack up Rig
Offshore Wind and the European Supergrid Joe Corbett, Head of Technical Services Mainstream Renewable Power Representing: Friends of the Supergrid.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
1 © 2008 OSIsoft, Inc. – Company Confidential Customer Cases PI in Oil & Gas British Petroleum.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
Subsea Light Well Intervention
Triton is a subsidiary of Noble Corporation. BUSINESS VISION COOPERATION TRANSFER PROFIT ESTABLISH REACH ACHIEVE HIGHER RETURN ON “INVESTMENT” WORKING.
What is the difference between renewable and non-renewable resources? VS.
Location of World’s Future Supplies of Petroleum and Natural Gas.
FPSO Experience Database JIP FPSO Research Forum 16 October 2002 Santiago de Compostela, Spain Robert SpongABS Consulting Presented by:
Classification: Statoil internal Status: Draft Statoil - an important source for value creation and jobs in Bergen and Hordaland.
PHASE 7 FACILITIES ENGINEERING
Multiplication Facts X 3 = 2. 8 x 4 = 3. 7 x 2 =
Multiplication Facts. 9 6 x 4 = 24 5 x 9 = 45 9 x 6 = 54.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
BARD Engineering OFFSHORE WIND INSTALLATION SOLUTIONS - INSPIRED BY OFFSHORE OIL AND GAS European Offshore Wind conference Berlin, December 2007.
Multiplication Facts. 2x2 4 8x2 16 4x2 8 3x3.
Multiplication Facts Review: x 1 = 1 10 x 8 =
Title of Powerpoint Subhead Name of Presenter Title of Presenter, Company Date of Event Location of Event Offshore vs. Near-shore FLNG: Functional & Regulatory.
YOUR RELIABLE PARTNER BINTANG SUBSEA.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
T o t a l s u b s e a s o l u t i o n s AB-X-PR Subsea 7 Inc. Results for First Quarter April
What’s the future of decommissioning globally?
Multiplication Facts All Facts. 0 x 1 2 x 1 10 x 5.
1 Spars for Deepwater Developments Don Vardeman VP, Worldwide Projects Anadarko Petroleum Corp September 9, 2009.
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
Customer Support Strategic Pillars
Multiplication Facts.
From: Experimental Comparison of Three Floating Wind Turbine Concepts
OFFSHORE CONSTRUCTION
Dropped Objects 12 April 2011.
Multiplication Facts.
By George Shard & Ray Pickens
INSTRUCTOR © 2017, John R. Fanchi
Harbors and Ports Engineering Geology – CE31FB2.
Multiplication Facts.
El Cerrito High School Stadium Project Status
Reduced Draft Spar (RDS) Floating Offshore Wind Turbines A Market Opportunity Pedro López Offshore Engineering & Ship Design
Petro Data Mgt III- Facilities
Presentation transcript:

Offshore Developments Topside Weight vs. Capacity and Total Installed Power Rev 06 23 April 2015

Document Number : Rev Date Description DRL Engineering DRL Prepared Checked Approved Review Date Approve Date 1 6 April 2015 Topside Weight vs.BOE JS 2 7 April 2015 Update after Fact Check 3 13 April 2015 Simplify and combine BOE and MW 4 19 April 2015 Additional Data 5 21 April 2015 Schedule added 6 23 April 2015 Project Weight Update Document Number :

PROCESS : OIL and GAS

HULL FORM

TOPSIDE WEIGHT vs. BOE by HULL FORM Topside Weight is noticeably impacted by Hull Form Type It is recommended that Data Analysis is carried out by Hull Form

TOPSIDE WEIGHT vs. BOE by HULL FORM Topside Weight (excl. Rig) vs. BOE Comparison by Hull Form. Based on a Daily Design Throughput of 150,000 BOE the “Benchmark” Topside Dry Weight for each concept is :- Multiple Deck FPSO 19,700 tonnes (131 kg/BOE) Fixed Structure 14,500 tonnes (97 kg/BOE) Conventional TLP 12,500 tonnes (83 kg/BOE) Semi Submersible 12,500 tonnes (83 kg/BOE) FPSO Conversion 10,500 tonnes (70 kg/BOE) Single Lift SPAR 9,600 tonnes (64 kg/BOE)

TENSION LEG PLATFORM

TENSION LEG PLATFORM

SPAR

SEMI SUBMERSIBLE

NEW BUILD FPSO

FPSO CONVERSIONS

Single Deck New Build FPSO’s FPSO Conversions and Single Deck New Build FPSO’s

FIXED STRUCTURES

BEST IN CLASS WEIGHT PERFORMANCE New Build FPSO Skarv Bonga Angola 18 Girassol Dalia Schiehallion Balder Terra Nova Captain Norne FPSO Conversion Vincent Fife Espadarte Peregrino Curlew Bijipira & Salema Cidade de Anchieta Alvheim Conkauati Leadon Ettrick Abo Tension Leg Platforms Marco Polo Shenzi Prince Mars A SPAR Horn Mountain Neptune Nansen Boomvang Gulfstar Gunnision Perdido Semi Submersible Independence Hub Who Dat Delta House Na Kika Visund Njord Atlantis Thunder Horse Thunder Hawk Fixed Structures Guntong A North Cormorant Nelson Kepodang (Indonesia) Lay Tay (Vietnam) Erawan (Thailand) North Rankin B Draugen Troll C Petronious Eider Solan KBB Alen

Offshore Developments Topside Weight vs. Total Installed Power in MW (PGTs + Process GTs)

PROCESS : OIL and GAS

HULL FORM

TENSION LEG PLATFORM

SPAR

SPAR

SEMI SUBMERSIBLE

NEW BUILD FPSO

FPSO CONVERSIONS

FIXED STRUCTURES : OIL

FIXED STRUCTURES : GAS

BEST IN CLASS WEIGHT PERFORMANCE Tension Leg Platforms Mars A Brutus Magnolia Prince Marco Polo Shenzi SPAR Gulfstar Horn Mountain Neptune Medusa Perdido Mad Dog Semi Submersible Independence Hub Atlantis New Build FPSO Bonga Knarr Angola 18 Schiehallion Anasuria Triton Balder FPSO Conversion Abo Peregrino BC 10 Bijupira & Salema Fixed Structures Oil Guntong Kittiwake Eider Gas Bunga Raya A Jerneh Laggan

Some of the TOP Weight Performers HORN MOUNTAIN SPAR INDEPENDENCE HUB SEMI SUBMERSIBLE MARCO POLO MINI TLP NEPTUNE SPAR MARS A CONVENTIONAL TLP SHENZI MINI TLP

Some of the NON Gulf of Mexico TOP Weight Performers GUNTONG A (MALAYSIA) FIXED STRUCTURE NORTH CORMORANT (NORTH SEA) FIXED STRUCTURE MODULAR BUNGA RAYA A (MALAYSIA) FIXED STRUCTURE – INTEGRATED DECK NELSON (NORTH SEA) FIXED STRUCTURE INTEGRATED DECK

Some of the NON Gulf of Mexico TOP Weight Performers BONGA (NIGERIA) MULTIPLE DECK FPSO PEREGRINO (BRAZIL) FPSO CONVERSION ANASURIA (NORTH SEA) SINGLE DECK FPSO SCHIEHALLION (West of Shetland) SINGLE DECK FPSO

Execution Duration vs. Topside Weight