Offshore Developments Topside Weight vs. Capacity and Total Installed Power Rev 06 23 April 2015
Document Number : Rev Date Description DRL Engineering DRL Prepared Checked Approved Review Date Approve Date 1 6 April 2015 Topside Weight vs.BOE JS 2 7 April 2015 Update after Fact Check 3 13 April 2015 Simplify and combine BOE and MW 4 19 April 2015 Additional Data 5 21 April 2015 Schedule added 6 23 April 2015 Project Weight Update Document Number :
PROCESS : OIL and GAS
HULL FORM
TOPSIDE WEIGHT vs. BOE by HULL FORM Topside Weight is noticeably impacted by Hull Form Type It is recommended that Data Analysis is carried out by Hull Form
TOPSIDE WEIGHT vs. BOE by HULL FORM Topside Weight (excl. Rig) vs. BOE Comparison by Hull Form. Based on a Daily Design Throughput of 150,000 BOE the “Benchmark” Topside Dry Weight for each concept is :- Multiple Deck FPSO 19,700 tonnes (131 kg/BOE) Fixed Structure 14,500 tonnes (97 kg/BOE) Conventional TLP 12,500 tonnes (83 kg/BOE) Semi Submersible 12,500 tonnes (83 kg/BOE) FPSO Conversion 10,500 tonnes (70 kg/BOE) Single Lift SPAR 9,600 tonnes (64 kg/BOE)
TENSION LEG PLATFORM
TENSION LEG PLATFORM
SPAR
SEMI SUBMERSIBLE
NEW BUILD FPSO
FPSO CONVERSIONS
Single Deck New Build FPSO’s FPSO Conversions and Single Deck New Build FPSO’s
FIXED STRUCTURES
BEST IN CLASS WEIGHT PERFORMANCE New Build FPSO Skarv Bonga Angola 18 Girassol Dalia Schiehallion Balder Terra Nova Captain Norne FPSO Conversion Vincent Fife Espadarte Peregrino Curlew Bijipira & Salema Cidade de Anchieta Alvheim Conkauati Leadon Ettrick Abo Tension Leg Platforms Marco Polo Shenzi Prince Mars A SPAR Horn Mountain Neptune Nansen Boomvang Gulfstar Gunnision Perdido Semi Submersible Independence Hub Who Dat Delta House Na Kika Visund Njord Atlantis Thunder Horse Thunder Hawk Fixed Structures Guntong A North Cormorant Nelson Kepodang (Indonesia) Lay Tay (Vietnam) Erawan (Thailand) North Rankin B Draugen Troll C Petronious Eider Solan KBB Alen
Offshore Developments Topside Weight vs. Total Installed Power in MW (PGTs + Process GTs)
PROCESS : OIL and GAS
HULL FORM
TENSION LEG PLATFORM
SPAR
SPAR
SEMI SUBMERSIBLE
NEW BUILD FPSO
FPSO CONVERSIONS
FIXED STRUCTURES : OIL
FIXED STRUCTURES : GAS
BEST IN CLASS WEIGHT PERFORMANCE Tension Leg Platforms Mars A Brutus Magnolia Prince Marco Polo Shenzi SPAR Gulfstar Horn Mountain Neptune Medusa Perdido Mad Dog Semi Submersible Independence Hub Atlantis New Build FPSO Bonga Knarr Angola 18 Schiehallion Anasuria Triton Balder FPSO Conversion Abo Peregrino BC 10 Bijupira & Salema Fixed Structures Oil Guntong Kittiwake Eider Gas Bunga Raya A Jerneh Laggan
Some of the TOP Weight Performers HORN MOUNTAIN SPAR INDEPENDENCE HUB SEMI SUBMERSIBLE MARCO POLO MINI TLP NEPTUNE SPAR MARS A CONVENTIONAL TLP SHENZI MINI TLP
Some of the NON Gulf of Mexico TOP Weight Performers GUNTONG A (MALAYSIA) FIXED STRUCTURE NORTH CORMORANT (NORTH SEA) FIXED STRUCTURE MODULAR BUNGA RAYA A (MALAYSIA) FIXED STRUCTURE – INTEGRATED DECK NELSON (NORTH SEA) FIXED STRUCTURE INTEGRATED DECK
Some of the NON Gulf of Mexico TOP Weight Performers BONGA (NIGERIA) MULTIPLE DECK FPSO PEREGRINO (BRAZIL) FPSO CONVERSION ANASURIA (NORTH SEA) SINGLE DECK FPSO SCHIEHALLION (West of Shetland) SINGLE DECK FPSO
Execution Duration vs. Topside Weight