FLOATING ,PRODUCTION, STORAGE & OFFLOADING SYSTEM - FPSO

Slides:



Advertisements
Similar presentations
Offshore Technical Integrity Safety Critical Elements and Performance Standards Tony Vaclavicek.
Advertisements

Commissioning Approach Integrated Service Solutions
Electrical & Instrument Construction Department
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Introduction What is the PCIMS ? PCIMS :Process Control Information Management System Each plant as an individual process area shall consist of an integrated.
for Pipelines & Casings
Fired And Unfired Pressure Vessels
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Utility Management Providence Health System - Oregon Environment of Care.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Crane Operations Objective
Objectives: Understand importance of utility and maintenance system in industry/plant.
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Low-GWP Alternative for Small Rigid PU Foam Enterprises Conversion Demonstration from HCFC-141b-based to Cyclopentane-based Pre-blended Polyol in the Manufacture.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Paint Circulation Technology Level 1 - Training Document
WELCOME TO HADI H AL-HAMMAM GROUP
ABB LCC ECS - 1 © 2004  Industrial IT Power Management System Scope & Value Proposition Lead Competence Center Electrical Control Systems.
Presentation by Oluwadamini Ajayi School : University of Minnesota – Twin Cities Course : Mechanical Engineering (BME) Year : 400 Level Company : Shell.
Company Profile.
+ Careers in Electricity. + Outcome for today: Outcome EL6.1: Assess personal, societal, economic, and environmental impacts of electricity use in Saskatchewan.
POWER PLANT.
LNG Technology.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
RPC «REGMIK» 15582, Ukraine, Chernihiv region, Rivnopillya, Gagarin Street, 2B phone.: +38 (0462) , , , , +38 (050)
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Selling Fire Sentry Products in the Oil, Gas, and Petrochemical Markets.
Plant operation System
PRODUCTION OPERATIONS AND MAINTENANCE
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
Clark Reliance Corporation Strongsville, OH. Fuel Gas Treatment.
1 1 Subsea process systems engineering Integrated and new processes for separation (vapor pressure and dewpoint control) and water handling, with emphasis.
PHASE 7 FACILITIES ENGINEERING
Utility Engineers, PC.  Generation  Transmission  Distribution.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
Chapter 17 Vehicle Systems and Maintenance
Production Sector Workshop Introduction to Online Tools Presented by: Heather Wright ERG June 19, 2003 Natural Gas STAR Technology Transfer Workshop New.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Utilities & Engineering Department16 Blossom St., Boston Introduction to the Hospital Emergency Power Supply System (EPSS) Jason D'Antona,
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
About company Kurgankhimmash is the leading Russian company manufacturing process equipment for oil & gas producing, oil & gas refining, chemical, energy,
Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Abacus is the leader in design and manufacture of Heat Transfer Equipments and Industrial Chilling Equipments. We have the services for Thermal Designing,
Industrial Resources, Inc.
It’s…….
OFFSHORE CONSTRUCTION
Shipboard Electrical Distribution
How SCADA Systems Work?.
Subsea 100 Global Services Products Presentation
FlexfloTM Surge Relievers
SNS Cryoplant Commissioning Past Experiences
Liquid Drainers for the Upstream, Mid-Stream, Down-Stream HPI
Emergency Response on FPSO
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

FLOATING ,PRODUCTION, STORAGE & OFFLOADING SYSTEM - FPSO .

THE FPSO Objectives of the Presentation. 1. To showcase PETAN members capabilities in handling various FPSO Topside packages and systems. 2. Emphasise PETAN members experiences with FPSO Topsides and past and current involvements. 3. To highlight various contract opportunities that could be awarded for execution by PETAN members . 4. To highlight areas where Local Content Targets can be achieved and required local capacity developments or initiatives can be achieved.

THE FPSO The FPSO is broadly made up of the hull and top-side. The hull stores the processed crude and the top-side does the processing. The Hull is built by the EPCIC contractors while the various Topside packages are designed, manufactured, built, integrated , installed and commissioned by various OEM representatives , sub-contractors and integrators like PETAN members all over the world. OEM equipment , OEM components , various OEMs sub-assemblies are either installed as it is , assembled to build various packages and panels or integrated to produce the desired processes , electrical, mechanical , telecommunications or safety management systems. These are key areas where PETAN members have capabilities and roles to play.

The TOPSIDE OF AN FPSO The top-side have mechanical and electrical sub divisions. All equipment on-board the FPSO are initially defined by the individual disciplines: by process (for process type equipment: separators, other pressure vessels, filters, columns, pumps, compressors, etc.), by electrical engineering (for electrical equipment: main generators, essential & emergency generators, etc.), by mechanical engineering (for mechanical equipment: cranes, lifting appliances, monorails, etc.) by safety ( for safety related equipment: fire water pumps, deluge systems, etc.)

FPSO TOPSIDE This talks of the general outlay of the process area.

FPSO MODULES .

TOPSIDES: INTRODUTION TO OTHER DISCIPLINES (OPPORTUNITIES)

LIFE CYCLE OF FPSO TOPSIDE For all the various areas mentioned above , the following are both opportunities and requirements to build capacity on an FPSO: - Design and engineering opportunities - Fabrication and Installation - Hook-up and Integration - Commissioning PIS/Major maintenance and/turnkey retrofit Engineered equipment supply service - OEM equipment supply, installation, commissioning and PIS

MECHANICAL ENGINEERING For the Mechanical engineering scope , the following opportunities or equipment are usually grouped into several packages for the purpose of obtaining quotations or awarding subcontracts from the OEM, OEM representatives, independent system integrators or EPCM companies. Typical packages for a large FPSO project are as follows: - Main turbo-generators - Compressors (Low pressure: LP1, LP2…) - Compressors (Medium pressure: MP1, MP2…) - Compressors (High pressure: HP1, HP2…) - Gas Dehydration (Glycol regeneration) - Crude oil offloading pumps - Water injection pumps

MECHANICAL ENGINEERING - Crude oil offloading pumps - Water injection pumps - HVAC equipment - Flare and HC blanket gas recovery - Sea water coarse and fine filtration - Produced water hydrocarbons - Injection water dehydration unit - Inert gas generation unit - Waste heat recovery unit - HP/LP fuel gas skid - Pedestal cranes - Wash water unit - Sea water lift pumps

MECHANICAL ENGINEERING - Hot water circulation pimps - Cooling water pumps - Air compressor & dryer packages - Fire water pump - Chemical injection - Sea water chlorination - HP/LP flare tips + ignition panel - Subsea methanol injection pumps - Nitrogen generation - Sea water/cooling water exchangers - Foam skid - Pressure vessels (carbon steel) - Pressure vessels (carbon steel + SS 316Lcladding) - Shell & tube heat exchangers - Pumps (API 60 – Centrifugal - Pumps (others)

ELECTRICAL ENGINEERING Generation and distribution Philosophy It is generally based on the use of three sets of generators: Main turbine generators: this provides power to the complete FPSO in normal operating conditions. Essential diesel generators: Supplies hull and living quarters in the event of a shutdown or failure of the main turbine. Emergency diesel generator: Supplies the safety related systems and maintain minimum life support services for personnel on-board in the event of a total shutdown or failure of main turbine and essential generators.

ELECTRICAL ENGINEERING The opportunities and capabilities -Electrical systems Main power generation and distribution ( Mains Switchboards) Essential power generation and distributions (essential, non essential switch boards) Emergency diesel generator and distribution boards. Uninterruptible power supply (UPS) Power distribution control system (PDCS) with following functions: Control of the power distribution system, load shedding, start inhibit of loads according to generators spinning reserves, automatic transfer sequence, event recording and parameter trending, display of alarms, interface to the ICSS.

INSTRUMENTATION The integrated control and safety systems (ICSS) is the core for control and safety. It provides monitoring, control and safety for the process, utility, marine and subsea facilities. It consist of the following elements: PCS(Process Control System): control of all the non-safety related monitoring, PSS(Process Safety System): first layer of safety protection in response to process parameters that have exceeded their normal limits (SIL2), ESD(Emergency Shutdown System): second layer of safety protection (SIL3) USS(Ultimate Safety System): third and final layer of protection using diverse technologies (SIL3), HMI(Human Machine Interface) to provide all equipment operations interfaces

INSTRUMENTATION FGS(Fire and Gas System): to provide Hull and Topsides Fire and Gas detection and alarms and executive actions, PDS(Process Data Server): to implement data recording and reporting, Training Simulator: to provide dynamic process simulation for operator training, Administration / Maintenance: management access level to operational status P3 type package interfaces. The P3 type packages are supplied with their own Unit Control Panel (UCP) and local operator interface. They are supervised and controlled by the ICSS on a higher level via the PCS< F&G PSS and /or ESD subsystems, They comprise of : Turbo-Generators

TELECOMMUNICATION Telecommunication systems opportunities are for: 1. Communication on the FPSO, 2. Communication around the FPSO, 3. Long distance communication to/from the FPSO. Communication on the FPSO: - PABX - UHF Operations Trunked Radio System - Public Address and General Alarm Systems (PA/GA) - CCTV System - Entertainment System - Environmental & Meteorological System

TELECOMMUNICATION Communication around the FPSO, - VHF Marine Radio stations - Marine Surveillance Radar systems with AIS - Aeronautical NDB’s and NAVAIDS - Point to Multi-point Radio links to/from FPSO facilitating communications with ships, drilling rigs and other vessels operating in the FPSO Long distance communication to/from the FPSO. - Subsea fibre optic cable - Satellite communications

CORROSION PROTECTION 1. Topside Protection – corrosion protection to separators, surge tanks, etc 2. HULL Protection Coatings Ocean-going ship is required to be dry-docked at intervals not exceeding 5 years A FPSO may be moored offshore for 15 years or more Impressed Current Cathodic Protection: Control electrode location, Stray current interference, Anode design Sacrificial Anodes (Recommended strategy: Sacrificial anodes if life on station is greater than 10 years) 3. TANKS Protection For cargo and slop tanks, sea water, void & produced water storage tanks For topsides tanks 4. MOORING Systems Fairleads , Chain connectors , chains , wire ropes , etc. 5. RISERS

Subsea Control Building Corrosion Inhibitor pumps skid Methanol pumps skids HPU/HCU frame Onshore fabrication pictures

Loadout & Offshore Installation pictures Subsea Control Building load out(one half) 2 halfs of Subsea Control Building offshore April 16, 2017 Methanol pumps skids on Bonga Corrosion Inhibitor pumps skids on Bonga

Scaffolding for habitat on Bonga Lifting of HPU/HCU frame Installation of HPU/HCU frame Welding in habitat on Bonga Offshore Installation pictures

Offshore Installation pictures Subsea Control Building Inside Subsea Control Building HPU installed on Bonga April 16, 2017 TUPA installed and hooked up