Overview What is AGIS? Transition Policy Imagery

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

Airports GIS | Update Presented to | Nebraska Aviation Symposium January 2011 Robert Bonanni, National Resource, AAS-101 Date | Wednesday: January 26,
AeroMetric, Inc. Presents: An Airports GIS Lecture Series
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
FAA Airports GIS (AGIS)
SLO – GIS User’s Group Airports GIS (AGIS) September 8, 2011 Matt Cunningham, PLS Aviation Division Manager.
Airport GIS Data & eALP – Coming To An Airport Near You
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
1 Federal Aviation Administration Airports GIS and electronic ALP March 5, 2009 FAA | Airport Engineering -and- FAA | National Planning Division Airports.
Airport Obstruction Standards Committee (AOSC)
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Presented to: By: Date: Federal Aviation Administration FAA Update Airports Program Western-Pacific Region Association of California Airports Robin Hunt.
Electronic Airport Layout Plans - “eALP” ACA, September 15, 2010 Kevin Shirer, AAE.
Presented to: By: Date: Federal Aviation Administration Federal Grants and Airport Capital Improvement Programs Western-Pacific Region Association of California.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
Environmental Justice (EJ) & Community-Based Transportation Planning (CBTP) Grant Programs California Department of Transportation District 3 January 25,
Georgia Airports Association Spring Workshop February 25, 2015 Georgia Department of Transportation FAA Policy and Procedures Concerning the Use of Airport.
1 Federal Aviation Administration Airports GIS Program March 10, 2009 FAA | Office of the Associate Administrator of Airports (ARP)  ARP | Airport Safety.
1 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ A Change in Direction.
NGS role in supporting to FAA
Esri Aeronautical Solution Esri Aeronautical Solution – Airports GIS Package.
Airport Surveying-GIS Program
Henry Felices Hershey PA March 5, 2009 Federal Aviation Administration Overview of the Airport Safety Data Program.
Capital Improvement Plan (CIP) The biennial Capital Improvement Plan (CIP) is the element of the California Aviation System Plan (CASP) required by State.
Presented to: By: Date: Federal Aviation Administration What Does the Asset Study Mean for California Airports? Robin Hunt and Patrick Lammerding September.
The BIM Project Execution Planning Procedure
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
GIS User Training Presented by Jessica Lawyer & Scott Shimoda University Human Resources.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Presented to: By: Date: Federal Aviation Administration FAA Update Airports Program Western-Pacific Region Association of California Airports Arlene B.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Registration of IDN Language Tables John L. Crain Bangkok, CcTLD Training 2004 John L. Crain Bangkok, CcTLD Training 2004.
Presented by University Advancement and Office of Sponsored Programs February 12, 2014 Effort Reporting: Electronic Effort Reporting System via Banner.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Electronic Flight Bag (EFB)
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
ABCs of the DBE Program for General Aviation Airports Association of California Airports South Lake Tahoe, California September ,
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
Office for Information Resources GIS Services Flood Map Modernization and the Tennessee Base Mapping Program Dennis Pedersen, Director F&A, OIR – GIS Services.
ECPIC Quick Guide: eCPIC-ITDB Interactions Purpose: The eCPIC-ITDB Interactions Quick Guide has been developed to provide a high-level, informational overview.
Federal Aviation Administration 14 CFR Part 147 Aviation Advisory Committee Working Group Training Updates Presented to: World Aviation Training Symposium.
Presented to: By: Date: Federal Aviation Administration Part 13 Informal Complaint Process Filing and Investigating Informal Complaints 35 th Annual Airports.
AST Research and Development Activities COMSTAC Launch Operations and Support Working Group Chuck Larsen October 24, 2006 Federal Aviation Administration.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Federal Aviation Administration Rick Etter Airport Acquisition Specialist FAA, Office of Airport Planning and Programming (202) ,
Federal Aviation Administration 1 Eastern Regional Conference March 2, 2011 Hershey, PA Office of Airport Planning and Programming Airport Improvement.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
2015 GDOT PowerPoint Title Page Sub Titles Body Text GDOT Aviation Programs Update Georgia Airports Association October 14, 2015 Presented By Steven V.
Federal Aviation Administration Update Topics 1.FY 16 AIP 2.New Compliance Philosophy 3.SMS 4.Airports GIS 5.Competitive Consultant Selection 1.
Federal Aviation Administration Clarification to Policy and Procedures Concerning Use of Airport Revenues; Proceeds from Taxes on Aviation Fuel Presented.
Mark Howard October, 2008 NGS ORIENTATION NOAA/NGS Aeronautical Survey Program.
PY 2005 Grant Officer Overview U.S. Department of Labor Employment and Training Administration Office of Grant and Contracts Management.
Federal Aviation Administration Office of Runway Safety
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Presented to: By: Date: Federal Aviation Administration 2016 GAA Workshop Georgia Airports Association Atlanta Airports District Office February 17, 2016.
Principal Investigator ESTCP Selection Meeting
Hangar Use Policy Winter Operations and Field Condition Reporting
Principal Investigator ESTCP Selection Meeting
AIRPORT PLANNING 101- THE BASICS
Delivery of Solutions Information Management
ASDWA Data Management User Conference
Principal Investigator ESTCP Selection Meeting
SPR-B Research Coordination Webinar
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Airports Southern Region Airports GIS Georgia Airports Association Workshop Brian Creasy February 2015

Overview What is AGIS? Transition Policy Imagery Safety Critical Data Non-Safety Critical Data Imagery FAA/Airport Sponsor Roles AGIS Website Training and Resources

Why AGIS? Conceived to address accuracy and airport data redundancy issues FAA published Advisory Circulars 150/5300-16, -17 and -18, and created GIS portal in 2006 Eliminate redundancy and consolidates data from different sources (NGS surveys, engineering surveys, OE/AAA, obstruction charts, etc) Data standardization Data accuracy Efficiency -- single web-based database for airport data accessible to data users ARP specific applications NFDC | NASR data NFPG data ? Which data is correct?! ? iOEAAA data Coordinated effort between AIM and Airports conceived in 2006 to address redundancy issues; multiple databases with data that don’t always match ACs published in 2006; -16 (Geodetic Control), -17 (Imagery), and -18 (Surveys) - Eliminates redundancy and addresses discrepancies between various sources of aeronautical data Data standardization: -18 features and attributes Data accuracy: Geodetic control requires tieing survey data to the NSRS; safety critical data verified by NGS Efficiency: single one-stop shop for aeronautical data; no multiple databases – still working toward that goal From airports perspective it also allows for development of planning and engineering tools to streamline our processes ?

Benefits of AGIS? AGIS allows data to be displayed visually to better understand the relationships between data Geospatially-referenced picture greater value than table of data Sharing data with others easier Viewing and sharing of data is much simpler and easier to understand when able to show the data visually instead of in table form.

Which Airports Are Subject to AGIS? (Safety Critical Data) All NPIAS airports are required to comply with AGIS as follows: Obstruction surveys used for the development of new/changed instrument approach procedures Surveys for projects that change safety-critical data. Common examples of safety-critical data are: Extend/shorten runway or relocate runway end Modify runway profile Install/relocate NAVAID Add/modify stopway, clearway, or EMAS Other data (see AC 150/5300-18, Table 4-1 and AGIS Transition Policy, Table 1) AGIS implementation requirements is delineated by the type of data being collected All NPIAS airports are subject to AGIS requirements for changes to safety-critical data. Basically, safety critical data is: - obstruction surveys supporting development of new or changes to instrument procedures - airport data in the runway environment - changes to the runway (length, width, profile, runway ends) - NAVAID siting or relocation - adding/modifying stopway, clearway, or EMAS - more detailed list contained in -18B and the transition policy

Which Airports Are Subject to AGIS? (Non-Safety Critical Data) Basic Rule of Thumb: Does the project affect data on the ALP? Construct/reconstruct taxiway or apron Building construction Install fencing Install/replace jet bridge AIP-funded wetlands, wildlife habitat, or other environmental mapping Other (See AC 150/5300-18, Table 4-2 and Transition Policy, Table 2)

Which Airports Are Subject to AGIS? (Non-Safety Critical Data) AGIS required for projects involving only non-safety critical data: Large/Medium/Small/Non-Hub Airports and Non-Primary airports certified under Part 139 and/or with an ATCT Hartsfield-Jackson Atlanta Int’l (ATL) Athens/Ben Epps (AHN) Southwest Georgia Regional (ABY) Heart of Georgia Regional (EZM) Augusta Regional (AGS) Fulton County-Brown Field (FTY) Brunswick Golden Isles (BQK) Gwinnett County-Briscoe Field (LZU) Columbus Metropolitan (CSG) Middle Georgia Regional (MCN) Valdosta Regional (VLD) Dekalb-Peachtree (PDK) Savannah/Hilton Head Int’l (SAV) Cobb Country-McCollum Field (RYY) * Remaining airports are exempt from AGIS requirements except for those projects affecting safety-critical data Large/Medium/Small/Non-hub airports, Part 139 airports, and airports with an ATCT are required to comply with AGIS requirements for non-safety critical data All others are exempt with the exception of safety critical data The 16 airports listed here are the airport in the state of Georgia that are affected.

Imagery Imagery collected primarily for safety-critical data projects involving new or modified instrument procedures; obstruction surveys Previously collected imagery may be used for 6 months (12 months with ADO/region approval) Must be collected in “leaf-on” conditions When airports think AGIS they often equate AGIS with a full survey with imagery. However, generally speaking imagery is required only for those projects or changes to safety critical data that affect instrument procedures. AC 150/5300-18 Table 2-1 provides a guide for AGIS collection requirements for different types of projects. The horizontal line shows that imagery required only for the different types of projects: Cat II/III operations Master Plan/ALP Instrument Procedure Development Airport Mapping The main point here is that the majority of AGIS projects (i.e. airside construction, NAVAID siting, pavement rehab) do not necessarily require imagery.

Why is Imagery Required? NGS Verification NGS requires imagery to validate safety critical data such as obstructions identified during an obstruction survey.

Roles and Responsibilities FAA Region/ADO Familiarize sponsors with AGIS requirements and funding eligibility Include AGIS in grant offer transmittal letters/special conditions Review and approve AGIS Statements of Work Review and approve eALPs (when capability is fully implemented) Airport Sponsors Issue RFQ and select AGIS consultant IAW AC 150/4100-14D Discuss data collection and project scope with consultant Submit “as-built” data through Airports GIS Request FAA review and approval of AGIS Statements of Work, Geodetic Control Plans, Survey and Quality Control Plans, and Imagery Plans * RFQ template available in Appendix C of AGIS Implementation Guidance Overview of Region/ADO and airport sponsor responsibilities Region/ADO Help sponsors identify those projects requiring AGIS survey activity; AGIS AIP eligible if project requiring AGIS is AIP eligible; no stand-alone AGIS projects eligible for AIP funding Review and approved AGIS SOWs Mention that the Geodetic Control, Survey and Quality Control, and Imagery Plans are reviewed by HQ/NGS....may take several weeks for reviews; regions can request expedited processing in special circumstances if required Airport Sponsors RFQ template is available as an appendix in the AGIS Implementation Guidance document Submit AGIS data as required by transition policy Request FAA review/approval of the SOW and plans (in practice, the consultant does this)

AGIS Statement of Work The project Scope of Work and AGIS SOW are different SOW Template available in AGIS Project SCOPE OF WORK All airport projects include a SCOPE OF WORK that depicts specific task and sub-task milestones, reports, deliverables, deadlines, and end products that are expected to be provided or met by the consultant and sub-contractors within a definite time period and project cost structure TASK that requires an Aeronautical Survey One of the required TASKS within a project may be collecting and highly accurate aeronautical survey data and submitting the information into AGIS, per the requirements in AC 150/5300 -16, -17, and -18 AGIS Statement of Work When the task of aeronautical survey data collection is necessary to support an airport project, an AGIS Statement of Work is required as part of the data collection and submission process flow within the AGIS website. The document must be reviewed and approved by the ADO PM Highlights the difference between a Scope of Work and AGIS Statement of Work Quite often, a scope of work is submitted instead of a statement or work Mention to use SOW templates (next slide) and recommend statements of work emailed to me for review prior to uploading to the system to avoid having to disapproved the SOW and resubmitting.

AGIS Statement of Work Templates The AGIS SOW Templates are a starting point for the SOW, a guide to be tailored for the specifics for each project AGIS Templates: Obstruction Survey, ALP, and General Construction Sections of AGIS SOW Administrative Objectives and Background Requirements Geodetic Control Imagery Survey and Quality Control Illustration * Templates for SOW and Plans are located at: https://airports-gis.faa.gov/public/airportsSteps.html Stress use of the templates to aid in the review process. 7 Sections: Administrative: Airport sponsor and consultant point of contact info and estimated NTP and completion dates Objectives and Background Example: Project objective is the extend Runway 09/27 by approximately 1,500 feet. The extension will be to the Runway 09 end. An Aeronautical survey and Airport Airspace Analysis for vertically-guided operations will be conducted to support FAA development of an LPV approach. Requirements: General statements regarding compliance with the ACs, using existing data when available, submitting data via the AGIS website, identifying which plans will be submitted. Geodetic Control: Identifies how the survey will the tied to the NSRS; specifies the primary and secondary control stations to be used, the state plane system, and the current GeoID model Imagery: Specifies the type of film to be used, flying height(s), project area dimensions, verifies data will be delivered IAW the Acs Survey and Quality Control: Identifies vertical or non-veritical guidance surfaces, NAVAIDs to be verified, runway profiles, etc. Illustration (i.e. airport diagram with the runway extension highlighted)

Survey Requirement Matrix AC 150/5300-18, Table 2-1 Starting point for determining survey and statement of work requirements; some projects may not neatly fall into a category; use common sense Included this slide to point out that when developing SOW Table 2-1 should be used to identify those primary items that should be survey/collected

AGIS Project Creation AGIS online help located at https://airports-gis.faa.gov/public/OnlineHelp/ After airport sponsor registers and receives an account, this is the home page. Brief overview of the different sections of the page: My Account: Updates contact info and/or change password Help and Training: Self-explanatory Online Resources: Links to various aeronautical information sites and link to the AGIS Acs 150/5300-16 (geodetic control), -17 (imagery), -18 (surveying) RSA Inventory – link to the RSAI database Sections for the eALP, MoS, and 20:1 SAV tool To create a project, click “My Survey Projects”

AGIS Project Creation This screen shows all of the user’s projects: ADOs can see all projects within the ADOs area of responsibility, sponsors see only their airport Click “Create New Survey/Project”

AGIS Project Creation Select the airport. Indicate the project type: New Airport Survey Project: Used for the majority of projects Existing Airport Data Project: Used to upload existing airport data. For example, CAD drawings of existing layout data (NON-SAFETY CRITICAL) that is converted to AGIS format (i.e. pavement layout, utilities, buildings, etc). And existing data project can also be used to make minor changes to existing AGIS data. For example, if an AGIS survey that included an apron was completed last year but the airport extended the apron by 100 feet to the south this year, the airport can use an existing data project to update the data instead of a new airport survey project that would require a SOW and Survey and Quality Control Plan. Note: Have to be careful here not to give the impression that an existing project can be used for more significant non-safety critical projects like a 2,000 ft taxiway extension. We want to see a new project for larger scale changes. Design/As-Built: This project workflow allows upload of design data early in the process then as-built data when construction complete. Designed to provide automatic notification to FPO to begin procedure development with design data. There are some issues with the automation that are being worked so this workflow isn’t widely used to this point. The FAA AGIS website has a video that explains this workflow step-by-step.

AGIS Project Creation Select appropriate survey purpose...construction airside for this example.

AGIS Project Creation After submitting the project, this the the project screen. Shows basic project information, airport sponsor information. Click “Add/Modify” in the Sponsor/Consultant information section to add a consultant to the project.

AGIS Project Creation This screen lists all consultant available to assign to the project. If the consultant’s name isn’t listed, the consultant must register with AGIS as a consultant. Select the appropriate consultant(s) to add to the project.

AGIS Project Creation The consultants show as assigned to the project on the upper left of the page.

AGIS Project Creation Now that a consultant has been added, the “SOW/Concurrence” tab is available.

AGIS Project Creation The consultant or sponsor can upload a SOW for FAA review and approval. After the SOW is approved, the Plans tab is opened and so forth....

All 5010 Data May Be Viewed in Airports GIS One more thing to note ... Using the airport view, sponsors can view 5010 data. Click “Airport View”

Select Airport by name or Identifier Select the appropriate airport.

Can also be viewed in Google Maps 5010 data can be viewed as well as opening Google Maps to view the airport. This is a good opportunity to highlight the fact that AGIS, OE/AAA, and the NASR database do not “talk” to each other at this time. As a result, the 5010 data here may not match the 5010 data accessible at 5010web or OE/AAA data. This is an issue that is being worked.

Resources FAA Airports Planning and Capacity GIS and electronic ALP (eALP) website http://www.faa.gov/airports/planning_capacity/airports_gis_electronic_alp/ The following slides simply show the various resources available via the AGIS/eALP website. Links to: ACs Transition Policy Memo AIP PGL AGIS Implementation Guidance “coming soon” – previous versions can be provided to sponsors by ADO/region (located on Q drive)

Resources FAA Airports Planning and Capacity GIS and electronic ALP (eALP) website Slides from the original MMAC FAA AGIS course. The materials from the most current course haven’t been posted here yet.

Resources FAA Airports Planning and Capacity GIS and electronic ALP (eALP) website Link to IDLE training levels 1-3 Design/As-Built Workflow video mentioned earlier

Resources FAA Airports Planning and Capacity GIS and electronic ALP (eALP) website Miscellaneous resources

Training AGIS IDLE Training Level 1 AGIS IDLE Training Level 2 Overview of AGIS and AC Requirements Recommended for executives, managers, and airport sponsors Cost for non-FAA personnel: None. AGIS IDLE Training Level 2 Detailed review of AGIS requirements Recommended for managers, program managers, and airport managers AGIS IDLE Training Level 3 Most detailed; designed for surveyors, contractors, and consultants Cost for non-FAA personnel: $150 Training slides and videos http://www.faa.gov/airports/planning_capacity/airports_gis_electronic_alp/

Airports Southern Region Airports GIS QUESTIONS? Georgia Airports Association Brian Creasy February 2015 Phone: 404-305-6725 Email: brian.creasy@faa.gov