Package Engineering Container Design Request (CDR) Reference Guide

Slides:



Advertisements
Similar presentations
L e a r n I n g... T h e I C A T W a y. Img. 1 Webtrak can be accessed by a link on the ICAT Logistics Inc homepage OR by going to
Advertisements

Refresher Instruction Guide Strategic Planning and Assessment Module
 Updating organization profile  Approving new members  Adding new members  Changing positions and permissions  Adding positions  Customizing organization’s.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
London & Zurich Plc User Guide. Service Benefits Full on-line management of client accounts Paperless direct debit – no signatures required Standing orders.
 Corporate Profile  BOSS Overview  Current Solutions  BOSS Modules  COLORS - New BOSS Web Module  BOSS Benefits  Supplier XML Services and BOSS.
How to Submit a Matching Gifts Application.
HOW TO USE THE SYSTEM Specialty Crop Block Grant Program Online System.
User Guide. Service Benefits  Full on-line management of client accounts  Paperless direct debit – no signatures required  Standing orders fixed not.
How to Use This Punch-out Training Guide
Mat-100 Instructions for download and completing form.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Using the Supplier Relationship Management (SRM) CDW-G Punch-out Catalog.
PRIOS ARA Limited Agent User Instructions PRIOS ARA Limited Agent User Instructions Professional Repossessors Interactive Operating System.
Getting started on informaworld™ How do I register my institution with informaworld™? How is my institution’s online access activated? What do I do if.
How to Apply for a Position at Prince George’s Community College Updated 07/13/
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
Vanche Gujarat Abhiyaan(VGA)- Best Reader Competition Online Student Registration and Data Entry presentation.
1 CHAPTER 2 “ New Quotes ”. 2 1.New Quote – From the “Community Home Page”, click on the “Get a New PUP Quote” link. 1.
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
Duty Log and Chat Setup SSG Frese, Jerome S. Sensor Manager Cell 12 MDD.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Walk Through of VEEP Online System Updated June 2015 Registering as a ‘New User’ Logging On and Reporting.
WELCOME to the QSNY Portal Public School Self-Study 1.
ELodgement User Guide July 2009 Level 8, 15 Blue Street, North Sydney NSW 2060 Tel:
1 / 61 Using the Customer Support Web Site © 2006, Universal Tax Systems, Inc. All Rights Reserved. Customer Support Site Objectives –In this chapter you.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
GEtServices Purchasing Units & Materials Training For Suppliers Request.
Click the “Add Team” button to create a brand new team. Click the “View Teams” button to view team’s you have already registered.
A user guide to accessing, reviewing and contributing to the Online Registry System.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
Navigation: If the tutorial opens up in your web browser, simply click your mouse or your space bar to advance to the next slide. Use.
Walk Through of VEEP Online System Updated May 2011.
Carnegie Corporation of New York Submitting a Proposal 1 This document will guide you through submitting a proposal to Carnegie Corporation of New York.
Double click on the Internet Explorer Icon on your Desktop. This should take you to the Polytechnic of Namibia Intranet Home site or Click on this link.
How to Create an On-Line Certificate of Veterinary Inspection (CVI) in VSPS for Accredited Veterinarians.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
SIGMA Requestor Training In this presentation we will cover : How to log a Sigma ticket How to update a ticket via the notification function How.
Submitting Your Thesis/Dissertation into Digital Southern.
1. On the homepage, click the “Register” link below the Login box in the left navigation bar. Registration Step 1.
Orders – View and Print Boeing Supply Chain Platform (BSCP) Detailed Training January 2015.
Digital Gujarat Portal – Citizen User Manual. How Do I Open A Portal? Go to the URL :- Screen 1.1:-
Purchase Orders May 2015 Supply Chain Platform: Rolls-Royce Training for Controls and Data Services Limited.
Shipments Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Guidelines for submission of accepted manuscripts Frontiers in Bioscience.
Click the “Add Team” button to create a brand new team
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Click the “Add Team” button to create a brand new team
COM Made Easy A step-by-step guide for working with COM’s.
SUBMITTING A PAYMENT REQUEST FORM
Faraday Future Shipping Portal Instruction Manual
Course Revision Form.
Boeing Supply Chain Platform (BSCP) Detailed Training
THE BASICS PIONEER PLACE
Requisition Entry Guide
I-Supplier Training Guide
Battelle Supplier Onboarding
The Smarter Balanced Assessment Consortium
The Smarter Balanced Assessment Consortium
Battelle Supplier Onboarding
MNAO Workflow Requisitions, Check and Wire Request Forms
District Court Workshops
The Smarter Balanced Assessment Consortium
The Smarter Balanced Assessment Consortium
Scholarship America Dollars for Scholars: Completing the Student Profile All Dollars for Scholars scholarships are applied for online via the Dollars.
Purchase Document Management
Presentation transcript:

Package Engineering Container Design Request (CDR) Reference Guide March 2015

Various features of CDR History section Service Packaging Instructions Reference Guide Outline CDR process overview Filling out CDR form Adding Attachments Copy Packaging Various features of CDR History section Service Packaging Instructions Common packaging materials Links Weight conversion table Labeling standards

Starting the Process For new model parts, send an email to Package Engineering (mpe@fcagroup.com) with a subject of “CDR Quoting” Required information Part number(s) to quote packaging specification 5 digit supplier code and location code (if applicable) Email addresses of required contacts (for access to system) Contract number ONLY include the required information No attachments or other information Emails in the incorrect format will not be reviewed Do NOT copy (CC) your Package Engineer on the email “TRM” is used as a place holder for all trim colors

Once the request is sent to mpe@fcagroup Once the request is sent to mpe@fcagroup.com, the Package Engineer will generate the CDR and an email will be sent The link for this email is specific for this first time. It brings you to your user profile

User Profile

Once your profile has been updated, go directly to the login page CDR Website Once your profile has been updated, go directly to the login page http://www.goilogic.com/CDR/MainCDRDefault.aspx

CDR Website If you are also a production supplier to FCA currently using the CDR System, you will be directed to the “Summary Desktop” Select “Service Desktop” to open your Service packaging database

Service Desktop Your “Service Desktop” will list the part number(s) that require a packaging submission for approval

Service Desktop To begin entering packaging information, select the corresponding “Edit” button

Entering Information Standard packaging information must be completed and submitted Regardless of packaging method (unitized or bulk), you will be prompted to fill out how you are packaging the part along with the associated packaging costs

Part Information Measurement Type Select the unit of measure which you would like to enter data in (Metric or US) Must be consistent throughout form Part Information Part Characteristics: Enter the data of part being packed If it is a kit, enter largest component and make a note in the Comments/Special Instructions box Hazmat: Select of the part is hazardous Buyer Code/ Buyer Name: Not required fields but should be entered if known Material Type: Select what the part is made of. If multiple, hold down “CTRL” key and select all that apply Copy Packaging: Must copy from a part which was previously submitted or approved Packaging Method: Unitized (1 piece per container) or Bulk (multiple pieces per container) Quoted Currency: Must match currency of contract with purchasing

Entering Information After completing each page, you are required to select “Save and Continue” to move onto the next selection

Unitized Primary Container Information (Unit) Container Type: What is the unit container? (Corrugated box, polybag, etc.) Depending on the container type you select, this will open some other required fields Outside Container: These are the dimensions and weight of 1 part packed in the unit container Click Here to Add Dunnage: If there is anything inside the container to protect a part (i.e. padpak), this needs to be indicated Label: All unit packed parts require a L-series label RR Donnelley (i.e. L-6060) purchased through our single source label supplier Secondary Container Required: This is used if several unit containers are placed in an overpack

Adding Dunnage Any dunnage used must be submitted as part of your pack Select “Click Here to Add Dunnage” After entering, you must select “Save Dunnage” or your entries will not be saved on your submission

Unitized Shipping Container Information (Pallet) This section pertains to the pallet and full shipping container Pallet Characteristics: The dimensions of just the pallet Shipping Container Characteristics: The dimensions of the shipping load which includes the pallet with all containers on it. No overhang Height not to exceed 33” unless oversized

Adding Attachments After entering labor information; you will be prompt to a section to add attachments Select “Click Here to Add Attachment” From the drop down menus, select Attachment Type: i.e. Invoice, Specification, Photo… Attachment Name: Name the attachment Upload Attachment Be sure to select “Save Attachment” once the file is uploaded

Submitting After all required information is entered, select “Submit” to send to your Package Engineer for review

The generated approval is what is required to PPAP Approval Process If there are no issues or concerns with your proposed packaging and cost, an email will be generated indicating an approval The generated approval is what is required to PPAP Disapprovals also generate an email along with a reason given by your packaging engineer Approved packaging costs will be added to your contract

Copy Packaging If a part utilizes the same packaging as a previously submitted or approved part, the copy packaging function is useful Part information is required at every submission because it may vary even if the packaging is the same If a part has an engineering change and nics up (i.e. 12345678AA to 12345678AB) and the “AA” was previously approved, copy packaging and you will receive an automatic approval

Copy Packaging Select “Copy Packaging” All of the part numbers you have access to will be shown Select “View” on the part you want to copy the packaging from This will show you the details of the submission

Copy Packaging At the bottom of the page, select the submission type New: All information is copied and is editable Same Packaging & Cost: All information is copied and is not editable Same Packaging & New Cost: All information is copied and only cost is editable Select “Copy Packaging Submission” Select “OK” Selecting “Same Packaging & Cost” is required to receive an automatic approval when parts are nic’ed up

Copy Packaging The Submission Type shows the part number selected to copy from Select “Save and Continue” Select “Submit” on the last page

New Model Packaging Approval Process Supplier sends required information to mpe@fcagroup.com Supplier receives email indicating assigned work Supplier completes and submits web form for approval Package Engineering approves Supplier receives generated email indicating approval Supplier’s contract is updated Package Engineering disapproves Supplier receives generated email indicating disapproval Revise specifications/cost

CDR Features History Search Shows a list of packaging specifications which were previously submitted, approved or disapproved If your email was not on the initial email to have access, you will not see the part Suppliers will not have access to all of the drop down options

Service Packaging Instructions CDR Features Service Packaging Instructions Shows diagrams and descriptions of common materials used for packaging

CDR Features Throughout CDR there are useful links to our standards These links are indicated by words in a purple font Weight Conversion Table I-20 Labeling Standards