Modeling and simulation of the Power Energy System of Uruguay in 2015 with high penetration of wind energy R. CHAER*E. CORNALINOE. COPPES Facultad de Ingeniería.

Slides:



Advertisements
Similar presentations
PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
Advertisements

Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Michael Milligan, NREL (speaking for a large team at GE, 3TIER and NREL) Westconnect, Apr 21, 2009 Western Wind and Solar Integration Study Update.
Slide 1 Harnessing Wind in China: Controlling Variability through Location and Regulation DIMACS Workshop: U.S.-China Collaborations in Computer Science.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
EE535: Renewable Energy: Systems, Technology & Economics Energy Storage.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
EE 369 POWER SYSTEM ANALYSIS
Analysis of wind energy with pumped storage systems in autonomous islands George Caralis Mechanical Engineer NTUA National Technical University of Athens.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Hybrid System Performance Evaluation Henrik Bindner, Tom Cronin, Per Lundsager, Oliver Gehrke Risø National Laboratory, Roskilde, Denmark.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Presentation of Wind Data  The wind energy that is available at a specific site is usually presented on an annual basis.  There are several methods by.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Why Wind?.
Wind / PV / Diesel in Off-grid: Lessons learned Best Practices
CCU Department of Electrical Engineering National Chung Cheng University, Taiwan Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch.
Operation and sizing of energy storage for wind power plants in a market system Magnus Korpås Norwegian University of Science and Technology (NTNU) Contents:
Costing of energy generation of multi area interconnected systems with conventional as well as renewable sources Kaisar R. Khan McNeese State University.
Southern Taiwan University Department of Electrical engineering
Prospects of Wind and Pumped Storage systems’ integration in Greek islands George Caralis Mechanical Engineer NTUA Wind Energy Laboratory.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
SINTEF Energy Research 1 Planning And Operation Of Large Wind Farms In Areas With Limited Power Transfer Capacity by M. Korpås, J. O. Tande, K. Uhlen,
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Wind Generation in New Zealand Kieran Devine, Doug Goodwin System Operations Transpower New Zealand Limited.
Renewables and System Services Ann Scully.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Diagram from the publication
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Debra Lew, NREL (speaking for a large team at GE, 3TIER and NREL) UWIG Western Wind and Solar Integration Study Update.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
1 12. WORLD ELECTRICITY IN THE YEAR 2050 Asko Vuorinen.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Operation and Control Strategy of PV/WTG/EU Hybrid Electric Power System Using Neural Networks Faculty of Engineering, Elminia University, Elminia, Egypt.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
1 11. PROFITABILITY EVALUATION OF NEW POWER PLANT ALTERNATIVES Asko Vuorinen.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Contents Introduction Focus area Wind scenarios
GENESYS Redevelopment Strawman Proposal
Energy and Fuels 2016 – Cracow
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Experiences with Wind Plants and Stability Studies in Isolated Systems
Western Wind and Solar Integration Study Phase 1
Mid-Continent Area Power Pool
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Modeling and simulation of the Power Energy System of Uruguay in 2015 with high penetration of wind energy R. CHAER*E. CORNALINOE. COPPES Facultad de Ingeniería & UTEUTE Uruguay

SUMMARY This paper presents the results of detailed simulations of the operation of the power system of Uruguay, for the year 2015 when it reached the target of 1200 MW of wind power in the system. This level of win integration will be near the 60% of de peak of demand. The results show that this level of integration is manageable thanks to the large installed hydro power capacity in the country.

A picture of 2015 The ceil-goal for 2015 is to reach 1200 MW of installed wind power capacity. The Expected demand for 2015 is about 1500 MW on average, with a peak of 2000 MW. Wind penetration then will be of 60% in capacity and 33% in energy How the system will be operated in 2015 with this such high share of wind power? Are the available resources enough to compensate the wind power variations? Capacity vs. Peak Energy 33% 60%

Uruguay – 2015 (expected generation by source)

Wind Stochastic Model - CEGH A stochastic model with Gaussian Space Correlations with Histogram was identified using hourly series of wind measures obtained in 7 sites distributed over the country during 2 year. The model represents the temporal and geographical correlation between sites and patterns the wind direction for site. Also represents the annual and daily seasonality the resource

Details This stochastic model was used to perform a simulation of operation of the system in 2015 using an integration time-step of one hour with the simulator SimSEE. All power plants in Uruguay are represented in this simulation, including: hydroelectric plants with their storage capacity and gas-oil, fuel-oil, bio-fuel and natural gas fired thermal units.

Two major questions Is the model used for long-term planning valid for dealing with high wind energy integration? Does the energy system of Uruguay has enought resources to handle the time variability of wind?

Modelling for Long Term Planning The model used for the optimal planning of investments in generation uses a weekly time step divided into four time bands. (patamares) This model is executed hundreds of thousands of times for determining the optimal investment plan. Due to weekly integration step the model is not able to adequately represent the effect of time variations of the wind farms output over the rest of the generating units.

Modelling Long term vs. Short term Modelling Long term vs. Short term Time Step: weekly dividen in 4 hourly-bands (PATAMARES) Hydros with reservoires: Bonete Wind Farms Output: stochastic, averaged by hourly-band Time Step: hourly Hydros with reservoires: Bonete, Palmar and Salto Grande Wind Farms Output: stochastic, averaged by hourly-band Investment Planning - Long term Operation Planning - Short term

Wind Energy (Weekly – Hourly) There is no significant differences since the weakly model of wind farms production was calibrated averaging the hourly model.

Hydroelectric (Weekly – Hourly) Could be in the order of 582 GWh per year of energy surplus available from the hydro-subsystem in the actual operation of the system. This surplus is achieved by the effect of better management of the lakes with short-term storage capacity.

Exports (Weekly – Hourly) Could be in the order of 50 GWh per year of energy surplus available for export in the actual operation of the system. This surplus is achieved by the effect of better management of the lakes with short-term storage capacity.

Exportable surplus = Overcost For expansion planning it was assumed that the system purchases all the energy generated by wind farms at 65 USD/MWh; and that all the energy surplus are exported at 10 USD/MWh to neighboring countries. So a 50 GWh/year of exportable surplus respresents a overcost of x (65-10) = 2 MUSD/year. This represent an increase in the price of wind energy of 0.75 USD/MWh.

Prices used for the long term planning. The estimates of the optimal amount of wind power to be installed in the system were performed initially priced at 90 USD/MWh and subsequently with 70 and 65 USD/MWh obtaining the same results in terms of the amount of power to be installed within the margin of error of the used tools. Therefore this change in price due to surpluses recorded in the hourly simulation over the weekly one, does not change the conclusions regarding the optimal amount of wind power to be installed in the system.

First conclusion As shown, the economic impact of the difference between both runs, changes the price of wind power less than the price variations that were considered in the study of sensitivity. Then, we consider validated the model used for planning respect to the result of install 1200 MW in the next years. But in the future to continue adding wind farms to the system, the weekly time step must be shorten to represent adecuality the filtering efect of the small lakes. For filtering the wind energy variation they are not small.

Does the energy system of Uruguay has enought resources to handle the time variability of wind energy?

What are the variations? 1 second 1 minute 1 hour 1 day 1 weak 1 month 1 year Geographical filter inter-farms Turbine-Machine intertial filter Forecasting Extra load following resources Traditional operation resources

Hydroelectric Plants 1541 MW Bonete 155MW 140 days Baygorria 108MW 3 days Palmar 333MW 22 days Salto Grande (50% UY) 945MW 8 days

Fast fuel fired units 6 x 50 MW = 300 MW GT Punta del Tigre 8 x 10 MW = 80 MW Engines 2 x 100 MW = 200 MW GT La Tablada 540 MW CC (in bidding proccess)

Interconnections 2000 MW With Argentina 570 MW with Brasil For planning purposes the import is considered closed.

A week of 2015

Net Demand

January 2015 hydrology assuming historical low

January 2015 assuming very high hydrology

Hourly Simulations 2015 considering two scenarios, one with 1200 MW wind power installed capacity and one without wind power. Results were analyzed from the point of view of increasing variability of power generation, induced by wind generation. To do this we compared the variations in power from one hour to the following for energy sources with possibilities of fast regulation: hydraulics, gas turbines and engines. We do that by comparing the cumulative probability plots of the time differences of power, P(h) - P(h-1), of the simulated cases with wind and without wind.

Fast-Thermal units variations

Hydro power

Hydro subsystem It notes that the expected time variations of the hydraulic power to the system without wind power are the same level as the historical variations of the periods in which Salto Grande is not carrying out secondary regulation, while the expected variations for the system with 1200 MW of wind are similar to the historical variations in when Salto Grande is carrying secondary regulation.

Exports

As can be seen in 80% of time is not necessary to use exporting power to regulate the system. It is remarkable that to meet the requirements in the remaining 20% of the time Uruguay has the ability to export to Argentina through the existing interconnection of 2000 MW and to Brazil through the interconnection of 70 MW already in operation plus 500 MW currently under construction. If the interconnections are not able to handle these increases of 200 MW the solution should be to reduce the power generated in the wind farms in those situations.

Second Conclusion The system should be capable to handle the variability of the 1200 MW in If the 2570 MW interconnection with Brazil and Argentina can not be used to absorb variations of 200 MW in less than 20% of the time, you should use to reduce the power generated by wind farms in those circumstances.