Raúl Morón Ballester TE-MSC-LMF

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
F. Savary. FSY - ColUSM #51 – Outline Mandate of the review panel Composition of review panel Programme Main outcomes/recommendations Actions.
DS 11T Coil #110 – impregnation results CERN, Prevessin B Author / al.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
11-T Dipole Collaboration Review Cold Mass Fabrication and Tooling Procurement F. Savary, with contributions from B. Auchmann, E. Grospelier, S. Izquierdo.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
F. Savary Outline Motivation Brief history Main parameters Technical challenges Design Fabrication What are we looking for? Summary.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
Long coil manufacturing plan and QC at CERN F. Lackner, P. Ferracin, H. Prin, M. Duret, F. Savary, L. Favier, S. Triquet, S. Luzieux, R. Principe, C. Scheuerlein,
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
11 T Dipole Integration & Plans M. Karppinen
Overview – Nb3Sn Furnace
ESAC Review February 2013 CEA Saclay
11T Dipole – Single Aperture 2m Model
ERMC/RMM activities May 2017
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
Reaction fixture: What is working and not working
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Far Detector Activities Late 2017 – Early 2018
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
SMC Design overview of the construction and project issues
Paolo Ferracin, Giorgio Ambrosio
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

Raúl Morón Ballester TE-MSC-LMF

From winding to impregnation – Raúl Morón Ballester 2 FNAL CERN MDT CERN LMF Babcock Noell Alstom 11T Prototype (5.5m) Manufacturing system 11T Model Manufacturing system

From winding to impregnation – Raúl Morón Ballester 3 Outlook Winding Curing Reaction/Splicing Impregnation Tooling delivery VS. Planning Conclusions

From winding to impregnation – Raúl Morón Ballester 4 Winding WINDING MACHINE: Modifications: Update of the control program Shortening of the bench Elevation of the gantry New tension-meter Outer spool holder to support two-layer-winding without internal splice Status: Tension control needs improvement – Not critical

From winding to impregnation – Raúl Morón Ballester 5 Winding Winding mandrel and accessories Status: Ready Handling equipment for spool manipulation Status: Ready

From winding to impregnation – Raúl Morón Ballester 6 Curing CURING PRESS: Modifications: Hydraulic system has been modified to allow more pressing configurations Update of the control system Resistance heaters instead of warm oil Extension of the bench to hold the outer spool Status: Ready

From winding to impregnation – Raúl Morón Ballester 7 Interlayer tool Status: Ready Curing Curing Mould Status: Half shelves shall be modified – Not critical Curing Jacket Status: Ready

From winding to impregnation – Raúl Morón Ballester 8 Lifting girder for curing mould Status: Ready Curing - Handling Coil storing tool Status: Ready Coil Handling tool Status: Delivered. Waiting for load tests (W51)

From winding to impregnation – Raúl Morón Ballester 9 Reaction Reaction furnace Improvements: - More robust ventilation system - Two oxygen sensors (Reaction Fixture + Retort) Status: Ready

From winding to impregnation – Raúl Morón Ballester 10 Reaction Reaction mould Status: Some blocks to be re- done. Delivery end of December - Argon flow is done from mid-plane to poles instead of axially. - The blocks rest directly on the base plate instead of the seal plates

From winding to impregnation – Raúl Morón Ballester 11 Reaction - Splicing Lifting tool for mould Status: Ready Splicing tool Status: Manufacturing launched (in-house)

From winding to impregnation – Raúl Morón Ballester 12 R-S-I Handling Rotating table for Winding – Splicing - Impregnation Status: Offers received, contract to be placed on W51. Delivery: Mid-March

From winding to impregnation – Raúl Morón Ballester 13 Impregnation VACUUM PRESSURE IMPREGNATION SYSTEM Characteristics: Pressure difference injection or dosing pump injection Mixing and outflow reservoirs outside the vacuum chamber Possibility to apply pressure up to 5 bar in each of the reservoirs independently Tilting of the chamber up to 18 degrees Auto-cleaning Status: Technical documents approved. Components ready by first week of January. First injection tests end of January. Machine commissioned: end of March. Credits: Elytt Energy

From winding to impregnation – Raúl Morón Ballester 14 Impregnation Impregnation mould Status: DO launched Expected end of March Resin injection can be done from base to top or axially (Axial method has been the usual up to now, but radial method is being tested due to its scalability)

From winding to impregnation – Raúl Morón Ballester 15 Tooling delivery VS. Planning Missing toolExpectedNeeded Winding tension control improvementEnd of FebruaryMid March Half-shelves for curing mouldMid-FebruaryMid-March Coil Handling toolDelivered - To be testedMid-April Reaction Mould - Extra blocksEnd of DecemberFirst half of January Splicing toolEnd of JanuaryMid-February Rotating tableMid-MarchEnd of March Impregnation fixtureEnd of MarchEnd of April Vacuum Pressure Impregnation SystemEnd of MarchEnd of April

From winding to impregnation – Raúl Morón Ballester 16 Conclusions The process has been proven successful up to curing. The reaction and impregnation changes always allow a fall-back solution. Tests are in progress to validate the concepts. The delivery of the missing tooling/machines does not interfere with the planning.

From winding to impregnation – Raúl Morón Ballester 17 Acknowledgments F. Savary, H. Prin, S. Luzieux, S. Izquierdo Bermudez, F. Lackner, R. Principe, L. Grand-Clement, E. Grospellier, C.H. Löffler, J.C. Perez, F.O. Pincot, R. Gauthier, D. Smekens, J. Mazet, M. Karppinen, T. Sahner, J. Parrilla Leal, A. Temporal, L. Favre, C. Mucher (CERN) A.R. Nobrega (FNAL) P. Revilak, S. G. Will (Babcock Noell) V. Letellier, T. Genestier (Alstom)