To Date Some library staff have relocated to former CETAD building Contractor compound is located on Library Avenue Hoarding.

Slides:



Advertisements
Similar presentations
AWHILES Conference Wrexham Medical Institute 14 & 15 July 2010 Welcome! Eryl Smith & Janet Peters AWHILES All Wales Health Information and Library Extension.
Advertisements

The Library is at 23 Queen Square The Library is at 23 Queen Square.
WEC Library & Teaching Rooms Refurbishement Project
Crescent Academy International
Edinburgh University Library’s
Berwickshire High School Presentation compiled 15 th October 2009.
Marvin K. Peterson Library Graduate Student Orientation Thursday, August 29, 2013 Hanko H. Dobi, University Librarian.
Maureen Wade Head of Library Services LSE 15 December 2008 Moving LSE Library – twice!
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Welcome to Aldrich Library
Learning & teaching refurbishments 2012 October 2012.
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 6 June 2014.
Community Forum 19 June 2013 EAST. Community Forum Agenda Welcome −Health and Safety Facilities Rebuild Programme –An overview of progress Forum –General.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
WORK SESSION March 29, 2012 UNIVERSITY OF HARTFORD LIBRARIES MASTER PLAN 2012.
The Durham Project Presented by The Registrar and Treasurer 02 June 2008.
香港中文大學圖書館系統 University Library System The Chinese University of Hong Kong Put On Your Wing, For Nothing Is Holding You Back The Academic Librarian: Dinosaur.
From planning to foundations Trevor Peare, Keeper (Systems) New Library Project Officer Trinity College Library A New Library for Trinity.
June 2012 THE NEW EAST ASIA LIBRARY. VISION & ASPIRATIONS We strive to make the new East Asia Library the “centerpiece” of Stanford’s East Asian studies.
Queen Square Library A short history. There are printed records mentioning the existence of an established medical library at Queen Square as early as.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Director of Buildings' Office Slide no.1 January 2010 Trinity College Universal Design Issues Access 2010 Cobble Reduction Access to Historic (Protected)
Implementation Update Docklands Community Forum 26 February 2014.
The West London Free School Palingswick House Update.
Information Services and Systems Welcome / Croeso Information Services & Systems A photo tour of the Library to help you find your way around.
Welcome to our Higher Education Information Evening.
DC Information Commons – Project Update to Library Staff Anne Fullerton Chair, DCIC Planning Team July 17, 2003.
1 Draft Research Plan LIEE Process Evaluation Jane S. Peters, Research Into Action Collin Fellows & Kara Crohn Research Into Action Jackie Berger.
MSc projects 2013/2014 Induction session Dr Mike Spann M.Sc Project Director
Welcome to the Library. Located on Hillhead Street, Opposite the Fraser Building Open 361 days a year, from 7:15am to 2am Ongoing cladding work will be.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
© Imperial College London Imperial College London Library Review Susan V Howard June 2008.
Welcome to our Higher Education Information Evening.
MSc projects 2014/2015 Induction session Dr Mike Spann M.Sc Project Director
Overview of Thesis Submission and Examination Helen Buckley, Research Student Administrator, Graduate Studies Office (GSO).
Health and Safety Information Wellington Campus 2013.
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
Overview of Thesis Submission and Examination Helen Buckley, Research Student Administrator, Graduate Studies Office (GSO).
1 Presentation to Technical Services Step 1 - Walk-through of new premises Step 2 – This presentation will focus on next steps to relocate staff and departmental.
Holland High School Construction Update June 8, 2011.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
1 Introduction to Fountains Library & Information Services.
New Building Construction Plan Neighborhood Briefing November 19,
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Loyola University Libraries The Pros, Cons, and Anomalies of an Academic Library Abby Annala.
FACILITY IMPROVEMENT PROGRAM SUMMER 2004 NEW CONSTRUCTION –Molecular and Computational Biology Building –Cognitive Imaging Center REMODELED LABORATORIES.
Overall NSW Health 2011 YourSay Survey Results YourSay - NSW Health Workplace Survey Results Presentation NSW Health Overall Presented by: Robyn Burley.
International Students Library Orientation 2012 Welcome to Library & Information Services.
Assessment Without Levels Key Updates. Assessment timetable (1) WhenWhat April- June 2015Final set of National Assessments in Y2 and Y6 under ‘old’ National.
Welcome to Library & Information Services (LIS). Welcome to all International Students!
MASTERPLAN Drivers for Masterplan: There are a number of drivers determining the need for – and direction of a Masterplan covering the entire St.
Serving the people of Cumbria Do not use fonts other than Arial for your presentations Fire & Rescue Service Alternative Crewing Arrangement (Day Crewing.
International Students Induction 2011 Welcome to Library & Information Services.
Presentation Euroškola Praha s.r.o. Jana Křůpalová
Library Resources for Postgraduate Students More than just books! The Library.
University of Adelaide HSIS2
California Health Care Facility, Folsom
Queen Square Library A short history.
Clydebank Town Centre Office.
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
Davisville Junior Public School / Spectrum Alternative Senior School
External Views of Entrance and exit
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
Westminster House, The Wells Road Centre, Nottingham
Queen Square Library A short history.
Offsite Storage Relocation
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Economics BSc Library induction - Welcome to the Library!
Nine Mile Ride – Project Timeline
Presentation transcript:

To Date Some library staff have relocated to former CETAD building Contractor compound is located on Library Avenue Hoarding erected around East building along the spine & in Alexandra Square Conference Centre facilities have moved to FASS building Study Zone opened - dedicated quiet study space in the old Conference Centre for students to use Additional dedicated study space being made available in Bowland North Refurbishment of East building Refurbishment completing early 2016

Refurbishment completing early 2016 Summer vacation work End June – end August: Refurbishment of main entrance and remaining areas of East Building Implications Temporary entrance being created to the left of the main entrance No toilets in building, nearest toilets in Learning Zone. Stock from Lower Ground on timed retrieval by library staff only (times tbc) Please note: Dates may be subject to change as the refurbishment progresses. For the latest information and specific details of activities visit the website or follow the library on social media

Refurbishment completing early 2016 Summer vacation work Mid June for approx. 1 week Preparation of C Floor for minor refurbishment. (PCs and printers disconnected, shelving dismantled, collections relocating to Reading Room. Furniture removed towards the end of this period). Implications C Floor remains open to students but there will be some disruption Stock will be available throughout but at some points will be in brief transit from C Floor to Reading Room A and B Floors will remain fully open for study, PCs, printers Alternative study space in Study Zone Please note: Dates may be subject to change as the refurbishment progresses. For the latest information and specific details of activities visit the website or follow the library on social media

Refurbishment completing early 2016 Summer vacation work Late June – early/mid August C Floor closed for minor refurbishment Implications Stock accessible throughout in the Reading Room A and B Floors will remain open for study, PCs, printers Alternative study space in Study Zone There will be some inevitable noise as refurbishment works are carried out There will be regular communication about expected level of disturbance Please note: Dates may be subject to change as the refurbishment progresses. For the latest information and specific details of activities visit the website or follow the library on social media

Refurbishment completing early 2016 Summer vacation work Late June – mid August B Floor stock moved gradually to Reading Room. Over a week in mid August, IT will be disconnected and furniture cleared. Implications B Floor remains open to students but there will be some disruption, especially during the final week when IT and furniture are cleared Stock will be available throughout, but at some points will be in brief transit to the Reading Room. A Floor also fully open for study, PCs and printers Alternative study space in Study Zone Please note: Dates may be subject to change as the refurbishment progresses. For the latest information and specific details of activities visit the website or follow the library on social media

Refurbishment completing early 2016 Summer vacation work Mid August-early October B Floor closed for minor refurbishment Implications Stock accessible throughout in the Reading Room A and C Floors will remain open for study, PCs, printers Alternative study space in Study Zone There will be some inevitable noise as refurbishment works are carried out There will be regular communication about expected level of disturbance Throughout Stock and services on A Floor will remain throughout this period Please note: Dates may be subject to change as the refurbishment progresses. For the latest information and specific details of activities visit the website or follow the library on social media