Assemblies Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.

Slides:



Advertisements
Similar presentations
CONTENTS Accuracy of Construction Cost Estimating 00 Abstract
Advertisements

Class 4 Process Diagramming MIS 2000 Information Systems for Management Instructor: Bob Travica Updated September 2012.
By Angel Aguila. Apply the range name Category to cells A1:C1, as you normally would. When lists are subject to updates, use a dynamic range instead.
Project Management Requirements Prof. Ralph V. Locurcio, PE.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
The Final RESPA Rule. Principles of RESPA Reform Help consumers shop for the best loan Shopping leads to greater competition & lower prices 2.
Earthwork QTO Stage 1 Preconstruction Stage 2: Procurement
35 Estimating Building Costs Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the process.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 16 The Economics of Investment Behavior.
Chemistry 103 Lecture 2.
Figure Figure 18-1 part 1 Figure 18-1 part 2.
Setting Up the INVENTORY & SERVICES Module Slideshow 8 A.
Common Page Design. Graphics and Tables Uses: Objects Numbers Concepts Words.
Project Cost Management
Conceptual Cost Estimating
Depreciation and Depletion C hapter 11 An electronic presentation by Norman Sunderman Angelo State University An electronic presentation by Norman Sunderman.
Accounting for Manufacturing Activities
Accounting Specialist Basic Functions : To provide essential data by computing and distributing collections to their respective allocations. Knowing the.
1 Depreciation and Depletion C hapter Identify the factors involved in depreciation. 2. Explain the alternative methods of cost allocation, including.
Construction Specifications
African Centre for Statistics United Nations Economic Commission for Africa Chapter 9: Chapter 9: Updating Supply and Use Tables Ramesh KOLLI Senior Advisor.
1 Depreciation and Depletion C hapter Identify the factors involved in depreciation. 2. Explain the alternative methods of cost allocation, including.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
CSC 221 Computer Organization and Assembly Language
Formats ACT 380.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 15 GIS Design and Implementation Management Information Systems –Systems Analysis –Systems Design –Systems Implementation.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
Chapter 7 Section 7.2 Addition & Subtraction in Different Bases.
Premium 2011 Setting Up the INVENTORY & SERVICES Module.
Chapter 11: Estimation of Population Means. We’ll examine two types of estimates: point estimates and interval estimates.
2010 Construction Contract Standards Training Part 2 TOOLS October 2012.
Personal Estimation with PROBE CS3300 Fall Process Everybody has one !!! Formal – Completely defined and documented Informal – Just the way things.
Dividing with Significant Figures. In calculations, the accuracy of the calculated result is limited by the least accurate measurement involved in the.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
MBF1413 | Quantitative Methods Prepared by Dr Khairul Anuar 8: Time Series Analysis & Forecasting – Part 1
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
For more course tutorials visit MKT 421 Entire Course MKT 421 Final Exam Guide 1 MKT 421 Week 1 Discussion Question 1 MKT 421 Week 1.
Academic Computing Services 2007 Microsoft Word 2010 Publishing Long Documents This Guide will teach you how to work with long documents such as dissertations.
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
Bidding Strategies. Outline of Presentation Markup Expected Profit Cost of Construction Maximizing Expected Profit Case 1: Single Known Competitor Case.
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Task 1: Plan a document to meet a given design brief for a document of at least eight A4 pages A01 You need to research existing publications and evaluate.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Depreciation and Depletion
1.4 Significant Figures in Calculations
Bidding Strategies.
Design and modeling 10 step design process
Estimating and Scheduling CEE 492
Aim: Why are Significant Figures Important?
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
How elements are organized
Assembling a Project Budget
Using Special Journals & Subsidiary Ledgers
Constructive Cost Model
Estimating Capital Costs
Depreciation and Depletion
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 16 The Economics of Investment Behavior.
CS 8532: Advanced Software Engineering
LESSON 4-3 Preparing a Work Sheet for a Departmentalized Business
Significant Figures in
Example Exercise 3 Bank Reconciliation
Supply and Use Tables THE CONTRACTOR IS ACTING UNDER A FRAMEWORK CONTRACT CONCLUDED WITH THE COMMISSION.
Aim: Why are Significant Figures Important?
Advancd Measurement and Contract Administration
Presentation transcript:

Assemblies Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out

Assemblies (Systems) Estimating Done in the design stage and can provide accuracy in the  10% range Needs at least design detail approaching the 25-30% complete range. Not adjusted for time, location, design fees and O&P Sales tax on material to be added. ASSUME MATERIAL COST 50% OF TOTAL COST large companies develop their own cost guides R.S. Means publishes “Assemblies Cost Data” which is updated annually.

Using Means Assemblies Cost Data Commercial buildings are broken-down into smaller systems “divisions” and components according to the “Uniformat”. We used the same system in SF estimate The idea is that we are trying to create a table in the same format as the ones we used in SF detailed estimate. We are using the same systems/components column. Then, we fill the specs and the cost columns with specs and costs of our project.

Examine the example page 225 of Means page L-97 with tables page 229 of Means page L-96, subdivision 1.1. Try to relate the assembly number and description to the cost. After the costs of the 12 systems are obtained, complete a table similar to the one shown in Figure Notice that tax, general conditions and O&P are computed in that table. Also, the cost is adjusted for location and time. Finally design fees are added. The term “General Conditions Work” means all work and associated cost to complete the Construction Work that is not included in CM/Contractor’s Base Fee or in Bid Packages; including, but not limited to, items required by the exhibits. “ Contingencies: errors and oversights, imperfections in estimating methods, accidental events during construction, economics and environmental conditions, etc The final step is to compute the cost/SF by dividing the cost by floor area.