PSB DSP based RF low level control: Operations and Diagnostics 27/1/15 M.E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk. 1.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
 Distortion – the alteration of the original shape of a waveform.  Function of distortion analyzer: measuring the extent of distortion (the o/p differs.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
Power PMAC Tuning Tool Overview. Power PMAC Servo Structure Versatile, Allows complex servo algorithms be implemented Allows 2 degree of freedom control.
Booster Low Level Modules, Timing and some Measurements.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Booster Dampers Update Nathan Eddy PIP Meeting 4/30/14.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
New PSB Beam Control Upgrade of daughter cards Alfred Blas PSB rf Working group meeting 24/03/ Generation of REV clocks 2.Synchronization with.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
RF system & magnetic PU ELENA review meeting CERN, November 2015 M.E. Angoletta, S. Hancock, M. Haase, M. Jaussi, A. Jones, J. Molendijk, M. Paoluzzi,
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Other Utilities of ALBA LLRF
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
RF acceleration and transverse damper systems
Challenges of Dual Harmonic RF Systems
The ISIS Dual Harmonic Upgrade
PS status 10 August – 17 August 2017
Injectors BLM system: PS Ring installation at EYETS
Longitudinal beam parameters and stability
Harmonic Distortion Analyzer, Wave Analyzer and Function Generator
Tomography at Injection in the PSB
PS Transverse Dampers Progress report on Firmware
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
PSB rf manipulations PSB cavities
Upcoming longitudinal MDs
RF and Sequences Andy Butterworth BE/RF
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
PSB Injection scheme in the Linac 4 era
New AD Production Beam in the PSB
M. Mehler1), H. Klingbeil1), B. Zipfel2)
SPS Transverse Damper System
Limits on damping times
New PSB beam control rf clock distribution
Monday February 28th 8h00: Injection
Beam dynamics requirements after LS2
PSB magnetic cycle 900 ms MeV to 2 GeV
Presentation transcript:

PSB DSP based RF low level control: Operations and Diagnostics 27/1/15 M.E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk. 1

Introduction Consolidation was required to keep the PSB LL reliable & flexible for the upcoming LIU upgrades such as L4 injection, 2 GeV/c extraction and controlling Finemet or upgraded ferrite cavities. Part of a plan to consolidate all of the Meyrin machines LL systems. New HW, firmware and software but an attempt was made to keep with in the existing “feel” for the operations crew with working sets, samplers and OASIS integration where possible. We’ll present the basics of how to operate the new LL system and show what diagnostics are available (or soon will be!) 2

Very similar overall to existing LL RF systems, but the new systems interfaces are delivered in full “expert version” that can be a little daunting. RF synoptics are the chosen expert tool to get the overview of how to control most of the parameters, but these are also available via the working sets (WS) if one knows where to look! The WS are typically what the operations crew prefer to use, but the large number of parameters for the LL RF make these complicated to the casual user. We are working to simplify the more complicated knobs and will then be able to generate WS in collaboration with OP that only show the basic options required for everyday operation. This should be completed by end of February The timings that are missing the BAX0-4 prefix will be renamed by end Feb To observe the inputs, outputs & signals within the system, samplers and OASIS are still used, although many signals only exist in the digital domain. The OASIS signals are presently being reorganized to remove old signals and try to arrange the new ones in a simple order. 3

The new system is based around 3 DSP motherboards and the functions performed are split between the 3. According to the functions performed by the motherboard, it’s two daughter card slots are equipped with a Master Direct Digital Synthesizer (MDDS), a DAC also known as a Slave Direct Digital Synthesizer (SDDS) or an ADC also known as a Digital Down Convertor (DDC). DSPA takes care of the frequency program & radial loop. DSPB takes care of the phase loop(h=1 & h=2), synchronisation loop, as well as the master clock. DSPC looks after the C04 phase loop, the C16 blow up and the generation of the drive signals for the cavities. There are 3 CTRVs in the system, but many timings are generated internally and do not pass through the CTRVs. 4

What’s required to operate the Digital LL RF system? As with the old system, the basic processes remain the same: – Phase loop – Second harmonic control – Radial loop – Capture – C16 blow up – Synchronisation loop 5

What’s required to operate the Digital LL RF system? Synoptics & Working Sets give access to everything needed. A copy of each synoptic can be found at the end of the presentation. 6

What’s required to operate the Digital LL RF system? Primary Phase Loop: Important Parameters & Functions – Phase loop start timing BAx.SPL_H1 from WS – Adjust Phase loop gain function BAx.FGPLGAIN, too little gain may provoke losses, too much may provoke oscillations and perhaps losses. – Phase offset function BAx.FGBEAMPOFF is typically disabled as unused presently. 7

What’s required to operate the Digital LL RF system? Primary Phase Loop: Signals to Observe – The primary phase loop response can be observed on the samplers BAx.BEAMPH_H1-SD or on OASIS BAx.BEAMP_H1-DS and used to check when the phase loop is switched on and if there is too much or too little gain with BAx.SPL_H1 & BAx.FGPLGAIN. – The function BAx.FGPLGAIN can also be observed on the samplers BAx.FGPLGAINH1-SD or OASIS BAx.FGPLGAIN-DS – Phase PU signals are on OASIS BAx.PHASE_PU_AVC-AS and can be used to check that there is an input for the phase loop. 8

What’s required to operate the Digital LL RF system? Second Harmonic Control: Important Parameters & Functions – The second harmonic is used to increase the available bucket size and control the bunch shape via the the C04 voltage function BAx.FGVRFC04 and the programmed relative phase between C04 & C02 through function BAx.FGC04PHC02. – In our typical double harmonic operation, BAx.SPLC04-C02 is enabled from the start of the cycle, locking the C04 phase to the C02. – The C04 Phase Loop can also lock the C04 to the beam in place of the C02, when BAx.SPLC04-BEAM is enabled. There are no users presently where this has been used. – Once close to the extraction FT, the beam can be split in two with the voltage functions, then transferring beam phase control from the Primary Phase Loop to the Secondary Phase Loop enabling BAx.SPL_H2. – There is a soft switching from Primary to Secondary Phase Loop that can be found on the Primary or Secondary Phase Loop synoptic called PL H2 Transition Duration [ms] and is typically 1-5ms. 9

What’s required to operate the Digital LL RF system? Second Harmonic Control: Signals to Observe – The Tomoscope or BSM will give the simplest indication of the phase between the cavities, the timing BAx.SPLC04-C02 starts the phase lock and function BAx.FGC04PHC02 programs the phase between the cavities. – When C02 & C04 are in phase one observes a tall and short bunch, when out of phase a lower and longer bunch, but both depend upon how much voltage is on each cavity. – The H2 Phase Loop response can be observed on the samplers via BAx.BEAMPH_H2-SD or on OASIS BAx.BEAMPH_H2-DS. 10

What’s required to operate the Digital LL RF system? Radial Loop: Important Parameters & Functions – The Radial Loop start timing BAx.SRL. Note that the Radial Loop will automatically be opened by the Synchronization Loop on the extraction FT. – The choice of pick-ups to be used for the Radial Loop “TPUs to use for radpos calculation” in synoptic or “Radial PU2use Mask” in BAx.DSPA knob. This allows the use of all, none or any selection of the 4 available pick-ups. – The Radial Loop Gain function BAx.FGRLGAIN is used to adjust the loop gain. – The Radial Loop Steering function BAx.RSTEER is used to program the desired horizontal position throughout the cycle. 11

What’s required to operate the Digital LL RF system? Radial Loop: Signals to Observe – To observe the overall Radial Loop response in mm on the samplers use BAx.RPOS-SD and on OASIS BA4.AVRPOS_MM-DS. – The MRP sampler will also show the radial position but using all 16 pick-ups instead of 4. – If oscillations are observed on the overall response try reducing the gain function BAx.FGRLGAIN – The beam is deliberately steered to -2mm before the synchronization to smooth the transition of control from Radial to Synchronization Loops. – If there is a doubt about if one (or more) of the transverse pick-ups is working, these can be observed on OASIS with BAx.RPOS_TPUx_MM-DS. The mask can be changed to exclude faulty pick- ups, and the loop will work OK, but for best results all 4 pick-ups should be used. 12

What’s required to operate the Digital LL RF system? 13

Capture: Important Parameters & Functions – Injection frequency from knob BAx.DSPA called finj[Hz] or Frequency Program synoptic Freq Inj. – Cavity voltage control remain as they were, we have to edit the functions: BAx.FGVRFC02, BAx.FGVRFC04 & BAx.FGVRFC16 – Start Primary Phase Loop with BAx.SPL_H1 from WS – Edit Phase Loop Gain function BAx.FGPLGAIN. – Start of when to control the C04 phase with respect to C02 for dual harmonic operation with BAx.SPLC04-C02. – Edit the phase between the cavities with BAx.FGC04PHC02 to get desired bunch shape. – Adjust the time at which to switch from fixed frequency (finj) to follow the B Train with BAx.EFINJ from WS. – Start Radial Loop with BAx.SRL once there is some bunch structure. – Adjust the Radial Loop Gain with BAx.FGRLGAIN. – Apply any desired Radial Loop Steering with BAx.FGRSTEER 14

Capture: Signals to observe – The frequency at injection can be measured on the samplers on BAx.FREV-SD or on OASIS BAx.FREV-DS from the Primary Phase Loop by zooming in around C270-C300. – The primary phase loop response can be observed on the samplers BAx.BEAMPH_H1-SD or on OASIS BAx.BEAMP_H1-DS and used to check when the phase loop is switched on and if there is too much or too little gain with BAx.SPL_H1 & BAx.FGPLGAIN. – The Tomoscope or BSM will give the simplest indication of the phase between the cavities, the timing BAx.SPLC04-C02 starts the phase lock and function BAx.FGC04PHC02 programs the phase between the cavities. – The time when we switch from a fixed frequency to follow the B Train can be observed by zooming on the samplers Frev BAx.FREV-SD or Phase Loop response BAx.BEAMPH_H1-SD, likewise on OASIS BAx.FREV-DS & BAx.BEAMP_H1-D. – The Radial Loop response can be observed on the samplers BAx.RPOS- SD or OASIS BAx.AVRPOS_MM-DS, and the start, gain and steering adjusted with BAx.SRL, BAx.FGRLGAIN or BAx.FGRSTEER. 15

What’s required to operate the Digital LL RF system? C16 Blow Up Control: Important Parameters & Functions – The complete C16 blowup block diagram by John Molendijk is attached at the end of the presentation. – The C16 is started & stopped by timings BAx.SBLOWUP_C16 & BAx.EBLOWUP_C16 found in the WS. – The C16 cavity voltage is programmed by the function BAx.FGVRFC16. – To program the settings for the C16 the best way is to open the C16 Longitudinal Blowup synoptic, despite this opening a complex knob. This knob will also be simplified in the near future. – The first tab allows the setting up of the C16 harmonic numbers on the left, these should be set to ensure that the frequency remains between 6-16MHz, but the higher the better. The right-hand column sets the slope time between harmonic number changes so that the cavity doesn’t drop out. 16

What’s required to operate the Digital LL RF system? C16 Blow Up Control: Important Parameters & Functions – The second tab allows the setting up of the time when the C16 harmonic numbers are changed, again set to keep the cavity within it’s working frequency range. 17

What’s required to operate the Digital LL RF system? C16 Blow Up Control: Important Parameters & Functions – The third tab allows the setting up of the C16 modulation and there are presently two modes of operation based around which of the two options have been selected in Frequency Offset Select (FOS). – When FOS is set to Register, the Frequency Modulation knob Modulation Frequency sets the frequency, while the Modulation Depth the amplitude of the modulation. The frequency should be set to the synchrotron frequency (or a harmonic of it) at a point in the cycle where one has programmed C16 voltage, but there is inefficient blow up around this, often enough to achieve the blow up required. 18

What’s required to operate the Digital LL RF system? C16 Blow Up Control: Important Parameters & Functions – When FOS is set to Function, one has to ensure that function BAx.FGC16FS has been programmed with the appropriate synchrotron frequency function for the bunch shape and enabled. This should allow controlled longitudinal blow up that, due to resonance, is much more efficient, hence the duration of the programmed blow-up voltage shorter. In this case the Modulation Depth controls the amplitude of the modulation. 19

What’s required to operate the Digital LL RF system? C16 Blow Up Control : Signals to Observe – The C16 frequency can be observed on the samplers as BAx.C16FREQ-SD to ensure it stays within the cavity limits. – The C16 harmonic number changes can be observed on the samplers as BAx.C16HARM- SD, but one MUST program tab 4 (DSP C Simulator) of knob to have the same harmonic numbers as programmed on tab 1. – The C16 modulation can also be observed on the Tomoscope or BSM as noise superimposed on the bunch. – In the end, it’s the emittance measured at the end that counts. 20

What’s required to operate the Digital LL RF system? Synchronisation Loop: Important Parameters & Functions – The timing BEx.SFEJSYNC starts the extraction process at C775. – The Extraction Synchronisation Phase Offset for each ring can be found on the first page of the RF Synoptic. It’s also available via a complex knob BAx.DDC.B2, but this is one that will be simplified. – The Extraction Frequency that is programmed on the Highland frequency synthesizer for synchronisation with ISOLDE or the dump can be found on knob BAx.DSPB or from the “Extraction reference” on the Extraction Synchro Frequency Steering synoptic and is typically Hz for H1 and Hz for H2. This will be the operational Extraction Reference from start up and there will be an update on this during the first week of operation in – The Beating Frequency can also be found on knob BAx.DSPB or via the synoptic Extraction Synchro Frequency Steering and is typically Hz. 21

What’s required to operate the Digital LL RF system? Synchronization Loop: Signals to Observe – The Synchro Loop response is best observed on OASIS with signal BAx.SPL_PHASE-DS or global Extraction Synchro 2014 (will be updated for 2015!). – The quality of trains BAX.TREV-AS, BAX.TRF-AS & BAX.TRFPSBSYNC-AS were improved by the OASIS team in 2014 and these remain available. 22

Work Underway OASIS integration: – We already have the analogue cavity drive signals available. – Bulk of work done for system signals, expect to see a small subset (~20) of all the available signals(~200!) grouped by loop (Primary Phase Loop, Radial Loop etc) or process (Frequency Program) to make it simpler to find signals. – We’ll generate Globals for each process/loop with the correct signals to help de-bug/fault find. Knob simplification & timing re-naming: – Started and expected before March Replacement of Pentek with Highland for extraction reference generator: – This will be integrated during the start-up in 2015, the Highland will be the reference generator from now on. 23

Summary The Digital LL is fully operational and the old system is being de-commissioned. We’ve shown how to find and adjust some of the fundamental parameters and functions of the system. We’ve shown how to observe some of the principal signals with tools we have today, and hinted at what else should soon be available! There is still plenty to do to get the knobs, working sets and OASIS signals as requested, but work well underway. With the many projects each of the team members has been assigned, its not always easy to get enough of their precious time, so bear with us. 24

Thanks for staying awake! 25

Frequency Program Synoptic 26

Radial Loop Synoptic 27

Primary Phase Loop Synoptic 28

Secondary Phase Loop Synoptic 29

Extraction Synchronisation Frequency Steering Synoptic 30

Extraction Synchronisation Phase Loop Synoptic 31

C04 Phase Feedback Synoptic 32

C16 Blowup Block Diagram 33