A key quality attribute of a Future Circular Collider - Availability performance (RAMS) P. Sollander, Thanks to A. Apollonio, J. Gutleber, M. Lamont, P.

Slides:



Advertisements
Similar presentations
Prof. Seppo Virtanen TUT Dr. Seppo Virtanen, Professor, Faculty of Engineering Sciences Research and teaching interests: Reliability Engineering, Maintenance.
Advertisements

Workshop on Machine Protection, focusing on Linear Accelerator complexes Summary of Fifth Session – Operational Aspects 1)RF Breakdown recovery 2)CLIC.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 1 Design models for the management of accelerator components and infrastructure development.
Concept & architecture of the machine protection systems for FCC
Reliability Risk Assessment
Prof. Seppo Virtanen TUT PURESAFE Final Conference Tuesday 20 January 2015, 14:20 – 14:40 RAMS Methods and Tools: From LHC to FCC.
Operational Auditing--Spring Operational Auditing Spring 2008 Professor Bill O’ Brien.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
Operational Auditing Fall 2006 Professor Bill O’ Brien.
Operational Auditing Spring 2002 Professor Bill O’ Brien.
Operational Auditing Spring 2005 Professor Bill O’ Brien.
Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
Why use RequisitePro RequisitePro is a comprehensive tool that supports any of today's requirements management processes. The predominant requirements.
Ph. Gayet2 nd FCC Workshop1Ph. Gayet2 nd FCC Workshop1 FCC Control Systems Concepts: Why it's not too early to speak about it !!! Ph. Gayet FCC Washington.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
CERN Enrico CHIAVERI Head, Human Resources Department 22 June 2009.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
FCC Week 2015 Program of I&O presentations Ph. Lebrun 25 February 2015.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
Patrick Janot Physics Studies: Status on 31/08/15  Outline u The international context u The FCC-ee at Summer Conferences u The second year of the design.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Introduction to availability modelling in ELMAS Arto Niemi.
9 th Workshop on European Collaboration for Higher Education and Research in Nuclear Engineering & Radiological Protection Salamanca, Spain 5-7 June 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Johannes Gutleber CERN Directorate of Accelerators & Technology September 22, 2015 H2020 EUCard3 Reliability & Availability Task RAMS Training Topic.
Luminosity expectations for the first years of CLIC operation CTC MJ.
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 Advanced Software Architecture Muhammad Bilal Bashir PhD Scholar (Computer Science) Mohammad Ali Jinnah University.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
CERN Availability Working Group & Accelerator Fault Tracker Availability Working Group & Accelerator Fault Tracker - Where do we.
Welcome !! to the CAoPAC Workshop Carsten P. Welsch.
Introdcution to Workpackage/Activity Reflection D. Schulte.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
IAEA International Atomic Energy Agency TM/WS TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT: MANAGING THE DEVELOPMENT OF NATIONAL INFRASTRUCTURE FOR NUCLEAR.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
Radiation Protection computing tools Gérald Dumont HSE/RP.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Concept of in-situ repair using laser based additive manufacturing techniques Prof. Toms TORIMS Riga Technical University, Latvia FCC Week 2016, Rome.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
A SCALABLE AND OPEN PLATFORM FOR COMPLEX SYSTEM BEHAVIOUR ASSESSMENT
LHeC Coordination Meeting, 9 June 2017
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Future Circular Collider
Looking back on 2014 and Perspectives for the MPE Group in 2015
Accelerator Reliability Information System
Machine Availability and Reliability Panel (MARP)
An-Najah National University
Future Collider Projects at CERN
Update on Linac4 Status, Reliability Run and Modelling
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Turnaround: from LHC to FCC?
Operationalization of a Public Works AM Strategy
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

A key quality attribute of a Future Circular Collider - Availability performance (RAMS) P. Sollander, Thanks to A. Apollonio, J. Gutleber, M. Lamont, P. Collier, S. Virtanen,

Outline Reminder of terms Motivation FCC work package Collaboration Plans Peter SollanderFCC week Washington - March 26, 20152

DEFINITIONS Peter SollanderFCC week Washington - March 26, 20153

Availability is the proportion of time a system is in a functioning condition Peter SollanderFCC week Washington - March 26, Availability, a function of Reliability – Mean Time To Failure, Maintainability – Mean Time To Repair and Supportability – Mean Logistics Delay Time

MOTIVATION Peter SollanderFCC week Washington - March 26, 20155

RAMS requirements are being formulated here and now FCC-hh luminosity fb -1 per year Michael Benedikt’s talk Turn-around time limits integrated luminosity Daniel Schultes’ talk Beam loss can destroy the machine ! Bill Foster, Daniel Shulte, Miguel Jimenez, Freddy Bordry, … Breakthrough in availability needed Michael Benedikt … Peter SollanderFCC week Washington - March 26, 20156

Collider operation is Stable beams +Turn-around time Stable beams Turnaround time Dipole current Beam intensity Turnaround time Peter SollanderFCC week Washington - March 26, 20157

Faults increase turn-around time TurnaroundStable BeamsFault  LHC example  Failure tendency – 70% of fills dumped prematurely  Average unavailability caused by fault – 7 hours  Mean Time To Repair plus  Localization, Diagnostics, Logistics TurnaroundStable Beams Turnaround 5.5 hours ~6 hours ~7 hours 30 % 70 % Accelerator Operation Peter SollanderFCC week Washington - March 26, 20158

Performance can be increased by reducing failure tendency and unavailability Localization + Diagnostics + Logistics + Repair HL-LHC prediction with 70% failure and 7 hour faults Unavailability (hours) Failure tendency (Reliability) 260 fb -1 goal Peter SollanderFCC week Washington - March 26, Courtesy of A. Apollonio

FCC WORK UNIT Peter SollanderFCC week Washington - March 26,

FCC work unit will assess if and how RAMS methods can be used Evaluate the suitability of industrially applied RAMS methods and tools for use in particle accelerator projects Assess benefits for the design of future accelerators Formulate high level recommendations Train system experts to use selected methods and tools Peter SollanderFCC week Washington - March 26,

COLLABORATION Peter SollanderFCC week Washington - March 26,

Tampere University of Technology concluded FCC MoU and Addendum Peter SollanderFCC week Washington - March 26, TAMPERE UNIVERSITY OF TECHNOLOGY + Professor Seppo Virtanen One of the world’s leading RAMS researchers Foundation fellow of the ISEAM RAMS studies since 1983 Prof. Virtanen's has successfully carried out many RAMS-studies within feasibility and conceptual design phase of large scale investment projects worldwide (e.g. Statoil, Procter & Gamble, Wartsila, Metso, Kone, Cargotec Corporations and Posiva (Nuclear Waste Management) ). TUT-based spin-off Ramentor Oy was born out of research conducted by Virtanen’s group. Ramentor has developed ELMAS (Event Logic Modeling and Analysis Software) for the RAMS engineering and management of systems and for probabilistic risk assessment throughout their lifecycle.Ramentor Oy

TUT made RAMS design for Finnish nuclear waste encapsulation plant Peter SollanderFCC week Washington - March 26, Posiva nuclear waste management plant video:

PLANS Peter SollanderFCC week Washington - March 26,

Tampere University of Technology will take part in the FCC study 3.5 person strong team from TUT involved for the duration of the study. –2 TUT doctoral students –1 CERN doctoral student –50% of Professor Virtanen’s time Collaboration with CERN team –1 Research Fellow –1 doctoral student –staff Work starts in May 2015 with the arrival of the CERN doctoral student Peter SollanderFCC week Washington - March 26,

Modeling an existing accelerator will tell if RAMS methods are applicable to accelerators Identify key contributors to downtime and areas for deeper studies and application of RAMS methods Example areas that may be interesting to study –Impact of injectors on availability –Optimizing turn-around time –Large scale technical systems –Machine protection –Maintainability (100km ring) –…–… Collaboration with existing groups and initiatives treating availability and reliability for the current accelerators at CERN Peter SollanderFCC week Washington - March 26,

Summary Availability is key to achieve requested performance (fb -1 /year) Tampere University of Technology has RAMS expertise and will work for the FCC study Work units are defined and about to start More collaborators are welcome Peter SollanderFCC week Washington - March 26,

THANKS FOR YOUR ATTENTION Peter SollanderFCC week Washington - March 26,

Peter SollanderFCC week Washington - March 26,

TUT designs for operational availability Peter SollanderFCC week Washington - March 26, Courtesy of S. Virtanen

The Total Concept of Data Lifecycle Management Courtesy of S. Virtanen