1 29 th March 2007 C.P. Ward Pat Ward University of Cambridge Status of Far Detector Linearity Calibrations.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
2008, July Nantes 1 APD Tests : Status and Protocol Giuseppe S. Pappalardo INFN Catania.
LI Gain Curves Peter Litchfield Calibration Workshop, 6 th September 2005  Beginning to understand the LI system  Beginning to understand the software.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
Far Detector Data Quality Andy Blake Cambridge University.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
SpillServer and FD neutrino events As part of my CC analysis studies, I have been attempting to isolate beam neutrino candidates in the FD using both scanning.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
FD Timing Calibration Status Guardians of the FD timing calibration: –John Chapman, graduation in ~3-6 months. –Andy Blake, renewal of contract (or redundancy!)
Far Detector Timing Calibration Andy Blake Cambridge University November 2004.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
Cross-Calibration of FDs Sean R. Stratton TA-All Meeting – June 2010.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
1 Recon tests, Sci Fi status and Sci Fi design iteration Malcolm Ellis MICE Software Phone Meeting Wednesday 28 th April 2004.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Mary Ann Woodson National Credit Union Administration Office of the Chief Financial Officer NCUSIF Quarterly Statistics March 31, 2008.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, July 22 nd, 2011 Adil Khan.
S3: Calibration factors update Two weeks ago: L1 - Comparison with official factors found a problem: Investigating the discrepancy Gaby found an error.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of T0s calibrations Agustín Sánchez-Losa (IFIC) Meeting on status of calibrations for next seatray production
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Gain Curves Continued Peter Litchfield Phone Meeting 29 th September 2005 Previously:  Some LEDs gave ~linear PMT v PIN ADC curves  Some didn’t  Same.
4 Dec., 2001 Software Week Data flow in the LArG Reconstruction software chain Updated status for various reconstruction algorithm LAr Converters and miscellaneous.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Test Monitoring Center Report to the Mack Test Surveillance Panel
Jan 2016 Solar Lunar Data.

Average Monthly Temperature and Rainfall

North Carolina Piedmont Region Consortium Timeline
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug


FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Recall that a proportional relationship is a relationship between two quantities in which the ratio of one quantity to the.

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
LCLS-II Cryoplant Controls Workshop.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

1 29 th March 2007 C.P. Ward Pat Ward University of Cambridge Status of Far Detector Linearity Calibrations

2 29 th March 2007 C.P. Ward History Original 20-point Gain Curves had too few points in linear region Feb 06: 60-point GC used to make first set of FD linearity calibrations July 06: start of regular 40-point GC Second set of calibrations made from July 06 GC (in September 06) This week: have added calibrations from Aug 06 and Sep 06 GC to offline database

3 29 th March 2007 C.P. Ward Constants in Offline Database TimeStartInsertDateGainCurve# points Feb Jul Aug Sep 0640 All have TimeEnd =

4 29 th March 2007 C.P. Ward Stability:Jul06 – Sep 06 88% channels good fits both times and adcmax>12000 Ratio of corrections at ADC=12000: mean = sigma = Bay 11 rack 4 tube 2; Hardware change??

5 29 th March 2007 C.P. Ward Have asked Howie to process remaining data – not yet done Code in cvs: PulserCalibration/PulserGainFit PulserCalibration/macros/write_calpulserfits.C Write-up: MINOS-doc-1886 I will have to pass this on to Ryan now – good luck!