WaitLess*: Presentation #5 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.

Slides:



Advertisements
Similar presentations
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Advertisements

Parking Pal Team M1: Anna Kochalko Chris Moody Hong Tuck Liew John Wu Project Manager: Kartik Murthy November 5, 2007 Your digital parking meter of the.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
WaitLess*: Presentation #6 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Sprinkler Buddy Presentation #5: “Transistor Level Schematics and Another Floor Plan” 2/21/2007 Team M3 Sasidhar Uppuluri Kalyan Kommineni Kartik Murthy.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti (away) Stephen Roos (away) Design Manager:
WaitLess: Changing Restaurants Today for a Better Tomorrow Team Members: Jared Dubin, Terry Garove, Alex Runas Design Manager: Panchalam Ramanujan Where's.
Noise Canceling in 1-D Data: Presentation #9 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 23 rd, 2005 Full chip.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 22 Overall Project Objective : Dynamic Control.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
The Wait-er Hater WaitLoss Program utilizing WaitLess Technology: Presentation #3 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 11, 2005 MILESTONE 12 Final LVS & Simulation DSP.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Team M1 Enigma Machine Milestone April, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
Noise Canceling in 1-D Data: Presentation #8 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 16 th, 2005 Functional.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Noise Canceling in 1-D Data: Presentation #6 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 23 rd, 2005 Functional.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb Component layout Design Manager:
WaitLess*: Presentation #11 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
The “we found out ‘waitless’ is a service that Sprint mobile offers, guess we can’t use that name” Project: Presentation #4 Team M2: Jared Dubin Terry.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
WaitLess*: Presentation #9 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
WaitLess: Changing Restaurants Today for a Better Tomorrow Probably put a picture here of like a restaurant or something also maybe a better subtitle?
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Presentation transcript:

WaitLess*: Presentation #5 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface controller chip 10/10/2007 Schematic

Project Status Design proposal – complete Architecture - complete Name – provisional, debated Size estimates/basic floorplan - complete RTL / Behavioral - complete Structural – complete Schematic – complete Component layout – incomplete Functional block layout – incomplete Functional block LVS - incomplete

Design Decisions: - Decisions have mostly been made by this point, but… - Flip-flop has been the topic of a lot of discussion, over how to guarantee expected functionality and timing without increasing size drastically - SRAM pre-charge transistors added to attempt to improve response - Array multiplier is gigantic, but probably not a lot of room for improvement in the design itself, so we must look to its components: - Full adder blocks currently implemented as mirror adders, though we have no way to put the inverted outputs to practical use - SRAM final dimensions still in discussion, as we’ve heard both encouraging and discouraging things about our current plan - Here are some pictures, I hope you like them all:

Flip-flop schematic of the day:

Flip-flop simulation results:

Multiplier Schematic, as seen from space:

Some Promising Multiplier Simulations:

SRAM revised:

SRAM simulated:

Issues/Concerns: -Cadence is still not working for all of us; Jared can’t simulate his precious SRAM! - Flip-flops might not be finalized, as there is still some concern over their timing (though simulations have helped to relieve this) - Is the SRAM performing as well as we would like? - Drop-off over SRAM/decoder wires may be significant, we are considering alternate dimensions