Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, 2008 1 Undulator Checkout and Startup Plans Heinz-Dieter.

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
January 24, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Undulator BLM PDR Review 1 Undulator BLM PDR Review Heinz-Dieter Nuhn, SLAC / LCLS.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU/Undulator Commissioning Plans Heinz-Dieter.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Josh Stein Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
1 Heinz-Dieter Nuhn 1 Undulator Commissioning August 2009 FEL2009 Undulator Commissioning, Alignment and Performance Heinz-Dieter.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
William Berg Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor William Berg ANL/APS Diagnostics Group.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Overview Preparatory work at the MML BBA to define the reference orbit
T980 STATUS AND CHANGES FOR
Magnetic Measurements For The LCLS Undulator System
LTU/Undulator Installation Status
Beam-Based Alignment Results
Overview Pre-Beam Checkouts
Undulator System Components Status Dean Walters
High Level Physics Applications for LCLS Commissioning
LCLS Undulator System Status and Schedule
FEE Diagnostics and Commissioning
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Final Break Length Choice AC Conductivity Wakefields
Alignment Diagnostic System Status
LCLS e- Beams Systems Manager
Presentation transcript:

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter Nuhn, SLAC / LCLS November 12, 2008 Overview Girder Installation Status Pre-Beam Checkout Plan Startup Plan Beam Loss Monitor Status Overview Girder Installation Status Pre-Beam Checkout Plan Startup Plan Beam Loss Monitor Status

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Re-establish e  to SL2 LTU/UndComm. First Light in FEE First Light in FEH NEH Ops & Commissioning JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A Down PPS Linac/BC2 Commissioning FEL/FEECommissioning Nov. 3, 2008 Install Undulators M M D D LCLS Installation and Commissioning Time-Line LTU/Und Install PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump CD-4 (7/31/2010) X-Rays in NEH now D D Down? FEH Hutch BO

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Installation (=>Nov 08) All beamline components except Undulator Segments Initial Checkouts (=>Nov 08) Quads/Corrs, BFWs, RFBPMs, Girder Motion, Control System, ADS Correction of problems found during Initial checkouts (Nov 08) Broken BFW wires, Girder Motion Issues, Quad Terminal Corrosion, etc Conventional Alignment (Nov 08) Set all cams to “Home Position” and disable girder motion control Align quadrupoles to “straight line” within 100 um (rms) Center BFWs between quadrupoles. Final Pre-Beam Checkouts. Checklist exists (200+ pp). (Nov-Dec 08) Magnet Polarities / Motion (Girder, BFW, Slide) etc. Pre-Undulator Commissioning with Beam (Jan 09 – Mar 09) Motion Control / Beam Containment / Beam-Based Alignment / etc. Installation of Undulator Segments (Mar 09) Undulator Commissioning with Beam (Mar 09 – Apr 09) Beam Based Alignment / Undulator Slide Functions / Beam Stability Installation (=>Nov 08) All beamline components except Undulator Segments Initial Checkouts (=>Nov 08) Quads/Corrs, BFWs, RFBPMs, Girder Motion, Control System, ADS Correction of problems found during Initial checkouts (Nov 08) Broken BFW wires, Girder Motion Issues, Quad Terminal Corrosion, etc Conventional Alignment (Nov 08) Set all cams to “Home Position” and disable girder motion control Align quadrupoles to “straight line” within 100 um (rms) Center BFWs between quadrupoles. Final Pre-Beam Checkouts. Checklist exists (200+ pp). (Nov-Dec 08) Magnet Polarities / Motion (Girder, BFW, Slide) etc. Pre-Undulator Commissioning with Beam (Jan 09 – Mar 09) Motion Control / Beam Containment / Beam-Based Alignment / etc. Installation of Undulator Segments (Mar 09) Undulator Commissioning with Beam (Mar 09 – Apr 09) Beam Based Alignment / Undulator Slide Functions / Beam Stability Undulator Checkout and Startup

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Girder Component Alignment and Girder Installation Component Alignment on CMM Girders installed in Undulator Hall

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Girder Installation Status All girders are installed! Alignment of all girder components (including “test” undulator segment) has been checked and corrected (if necessary) on CMM. All quadrupoles have been individually characterized before installation All BFW devices have been thoroughly tested for reproducibility before installation. Problems repeatability problems excist Tuning and fiducialization of undulator segment is on-going. Reminder: First Installation of undulator segments on girder planned for March 2009.

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, BFW Positioning Beam travels out of slide plane

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Correction of Problems found during Initial Checkouts Replacement of 3 BFW cards that had broken wires [done] Correction of quadrupole terminal plate corrosions Correction of Interface Plate alignment to avoid cam block motion restriction Improvement mounting of linear potentiometers for cam motion control [done] Cam motion trouble shooting

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Findings Requiring Correction Uneven reference for linear pot Insufficient area for linear pot Quad terminal corrosion Broken BFW wires

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, pages

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Pre-Beam Checkout List: Overview Checkout Items per Girder BFW BLM CAM ROTATIONS LINEAR POTENTIONMENTERS GIRDER MOTION HORIZONTAL SLIDES QUADRUPOLE, XCOR, YCOR RF-BPM TEMPERATURE SENSORS WPM AND HLS SENSORS Checkout Items per Girder BFW BLM CAM ROTATIONS LINEAR POTENTIONMENTERS GIRDER MOTION HORIZONTAL SLIDES QUADRUPOLE, XCOR, YCOR RF-BPM TEMPERATURE SENSORS WPM AND HLS SENSORS

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Pre-Beam Checkout List: Detail 2

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Pre-Beam Checkout List: Detail 3

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Beamline Commissioning to Main Dump with Beam but without Undulator Segments (Jan-Mar 08) Get Beam through Undulator vacuum pipe with minimum losses. Commission Radiation Monitors Checkout BPMs (timing, scale, sign errors, etc.) Commission Girder Motion with Beam Verify and calibrate steering effect of quadrupole motion Calibrate motion parameters (gain, pivot points etc.) Check BPM offset tracking Commission RF Cavity BPMs Check charge dependent response over entire charge range Use Girder Motion to calibrate position vs. readings Check and correct optics matching over entire operational energy range Commission Beam Based Alignment (BBA) Develop saved configurations for three different energies. Commission BBA GUIs and BBA procedure. Commission Beam Finder Wires Calibrate PMT signals. Commission BFW GUIs (Alignment and scanning capabilities) Commission ADS-based girder position stabilization feedback systems. Commission Tune-Up Dump in preparation for commissioning with Undulator Segments Get Beam through Undulator vacuum pipe with minimum losses. Commission Radiation Monitors Checkout BPMs (timing, scale, sign errors, etc.) Commission Girder Motion with Beam Verify and calibrate steering effect of quadrupole motion Calibrate motion parameters (gain, pivot points etc.) Check BPM offset tracking Commission RF Cavity BPMs Check charge dependent response over entire charge range Use Girder Motion to calibrate position vs. readings Check and correct optics matching over entire operational energy range Commission Beam Based Alignment (BBA) Develop saved configurations for three different energies. Commission BBA GUIs and BBA procedure. Commission Beam Finder Wires Calibrate PMT signals. Commission BFW GUIs (Alignment and scanning capabilities) Commission ADS-based girder position stabilization feedback systems. Commission Tune-Up Dump in preparation for commissioning with Undulator Segments

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Install Undulator Segments (Mar 09) Mount Undulator Segments onto girders Segments will be stored in Undulator Hall before installation System is designed to be Self-Aligning Re-check slide motion clearance Expect to install 3 Segments / day Mount Undulator Segments onto girders Segments will be stored in Undulator Hall before installation System is designed to be Self-Aligning Re-check slide motion clearance Expect to install 3 Segments / day Segment installation test scheduled for week of 11/18/2008

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, First Beam Through Undulator Segments (Mar 09) Conditions for First Beam: All Undulator Magnets Rolled-Out Single Shot Operation (low charge) Send single electron bunch through undulator Read and evaluate as much diagnostics as possible along undulator (such as BPMs, beam loss monitors, toroids) Identify and remove sources of beam loss – if any Iterate Goal: Get beam through vacuum chamber with minimum losses. Reminder: Main Constraint is to Protect Undulator from Radiation Damage Conditions for First Beam: All Undulator Magnets Rolled-Out Single Shot Operation (low charge) Send single electron bunch through undulator Read and evaluate as much diagnostics as possible along undulator (such as BPMs, beam loss monitors, toroids) Identify and remove sources of beam loss – if any Iterate Goal: Get beam through vacuum chamber with minimum losses. Reminder: Main Constraint is to Protect Undulator from Radiation Damage

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, First Undulator Segments Commissioning (Mar – Apr 09) Undulator Segments still in Roll-Out position Run BBA Roll-In Individual Undulator Segments Transport beam through individual Undulator Segments Start at slot #33 (last Undulator Segment) Check and correct trajectory change. Run BBA with Undulator Segments inserted. Check Segment alignment with BFWs Undulator Segments still in Roll-Out position Run BBA Roll-In Individual Undulator Segments Transport beam through individual Undulator Segments Start at slot #33 (last Undulator Segment) Check and correct trajectory change. Run BBA with Undulator Segments inserted. Check Segment alignment with BFWs

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Courtesy W. Berg, ANL Undulator System Beam Loss Detectors Different Means of Beam Loss Detection are Used in the LCLS Undulator Area 1.ANL Style Loss Monitors (Initially 5) 2.PEP-II Style Loss Monitors (Initially 28, A. Fisher) 3.Toroids for detection of charge loss (2, before UND01 and after UND33) 4.Fibers Mounted to undulator vacuum chamber (Under Investigation by J. Frisch and A. Fisher) 5.TLDs (up to 76), replaced on a weekly basis

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Beam Loss Monitor (ANL Type) Courtesy W. Berg, ANL Radiator PMT BLM in Roll-In Position BEAM Expected for later part of Nov 08

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, PEP-II Beam Loss Monitors 28 PEP-II BLMs initially used in addition to 5 ANL BLMs. Thanks to A. Fisher and U. Wienands! ANL BLMs at locations: 1, 9, 17, 25, 33 All other girders will have PEP-II BLMs 28 installed!

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, BLM Requirements Primary function of the BLM is to indicate to the MPS if losses exceed preset thresholds. MPS processor will rate limit the beam according to which threshold was exceeded and what the current beam rate is. The thresholds will be empirically determined by inserting a thin obstruction (OTR33) upstream of the undulator. Simulation of losses and damage in the undulator are under way in parallel with the manufacturing effort.

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, TLD Monitoring Program The Radiation Levels generated inside the Undulator Hall need to be monitored using Thermoluminescent Dosimeters (TLDs) that are replaced as part of a standard operational monitoring program. The regular replacement program will start at the time when the Undulators are mounted onto the girders. (See step III, below). Steps I and II represent preparatory measurements. I.Baseline (Pre-Beam) Sampling: October 2008 – December 2008 II.Pre-Undulator Sampling: January 2009 – March 2009 III.Continuous Sampling: March 2009 – … The program will be managed by Mike Zurawel: TLD installation and replacement Radiation Physics: TLD readout and report generation

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, TLD Monitoring Program: Steps I and II I.Baseline (Pre-Beam) Sampling: October 2008 – December 2008 Mount 10 TLDs on girders. Leave TLDs in place for up to 3 months before removal and read-out. II.Pre-Undulator Sampling: January 2009 – March 2009 Stepper Motor Radiation Monitoring Use 21 TLDs mounted on each of the 7 stepper motors of the 3 girders (UND01, UND15, UND33) to monitor the radiation exposure of these motors. TDUND Test Use 6 TLDs mounted on girders. Leave in place while electron beam with and energy of 13.6 GeV will be parked at TDUND and none of the first 6 BFW devices will be activated. BFW Test Use 33 TLDs mounted on girders, 1 each at the downstream end of each of girder. Run a 13.6-GeV-beam with 250 pC charge through the undulator vacuum chamber. Perform full series of BFW scans (20 hits horizontally, 20 hits vertically) for each of the 33 BFW devices (BFW01 … BFW33), one at a time. Non-BFW Test. Same setup as above. Leave the TLDs in place for 1 week of beam operation in the Undulator Hall during which none of the BFW devices is to be activated.

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, TLD Monitoring Program: Step III III.Continuous Sampling: March 2009 – … TLD Locations Use 66 TLDs mounted to girders. Mount 1 TLD at the downstream mirror plate and 1 TLD at the upstream mirror plate of each undulator above the beam level, horizontally centered with the undulator magnet pieces. Use 10 TLDs and 10 moderators mounted in the long break sections underneath the beam pipe. TLD Replacement and Readout Program Replace all 76 TLDs once a week (preferably during the regular Wednesday ROD accesses. The TLDs need to be read-out and a report is to be generated within 10 days of their removal from the Undulator Hall. Thus, to be able to maintain a continuous replacement program, 3 sets of TLDs plus spares are required.

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, The undulator checkout and startup plans have been worked out and include Detailed pre-beam checkout Phase I: Electron-beam-based commissioning without undulator segments installed. Installation of undulator segments. Phase II: Electron-beam-based undulator segment commissioning X-ray-beam-based commissioning is scheduled to start in June 2008 including Commissioning of FEE diagnostics and spontaneous undulator radiation FEL/SASE commissioning. Beam loss monitoring is integral part of undulator system The undulator checkout and startup plans have been worked out and include Detailed pre-beam checkout Phase I: Electron-beam-based commissioning without undulator segments installed. Installation of undulator segments. Phase II: Electron-beam-based undulator segment commissioning X-ray-beam-based commissioning is scheduled to start in June 2008 including Commissioning of FEE diagnostics and spontaneous undulator radiation FEL/SASE commissioning. Beam loss monitoring is integral part of undulator system Conclusion

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, End of Presentation