Lightnin SPX Test Stand 05413 Aditya - Oriana - Don - Jesse - Ron - Dana - Geoff.

Slides:



Advertisements
Similar presentations
The Design and Problem Solving Process. What is the point? A proven method and process Can be utilized for any problem Helps you to produce quality work.
Advertisements

Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
Process Selection and Facility Layout
ICS 442 Software Project Management
Vegårshei,Aug 2011, Gunnar Ettestøl1 Offshore wind and wave power rigs. Systems description by: Gunnar Ettestøl, ETTE Elektro, 4985 Vegårshei, NORWAY.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
Justification  The Observatory Automation project required the Dome Drive System to be remotely operated and provide monitoring capabilities Conduct.
Team Members: Félix O. Rivera Vélez Héctor M. Lebrón García Héctor J. Collazo Carro Orlando Valladares López.
Team Dow Electronic Materials Nicholas Bishop, Jessica Harrington, Rachael Lutchmedial, Alexander Stachnik, Anthony Vacaro. Overview Background Information.
Small Engine Emissions Reduction Project Number Sponsor: Stone Construction Equipment, Inc. Team Members: Celeste Luce (Team Leader – Mechanical.
SMILE Engineering Transportation Challenge Weekend 2009.
Chapter 15 Application of Computer Simulation and Modeling.
Hardinge Universal Turret Senior Design Project Project Sponsor: Hardinge Inc.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
The Team Lincoln Cummings (IE) – Project Manager Joe Calkins (ME) – Chief Engineer Mark Fazzio (ME) – Technical Writer Allison Studley (ME) – Minutes.
Design and Fabrication of a Miniature Turbine for Power Generation on Micro Air Vehicles Team Arman Altincatal Srujan Behuria Carl Crawford Dan Holt.
High Torque Test Stand Aditya - Oriana - Don - Jesse - Ron - Dana - Geoff Lightnin SPX.
Senior Design Team RMSC Robotics Display Mentor: Bill Scarbrough Team Leader: Amy Tatro (ME) Mary Beth Belczak (ME) Matt Boecke (EE) John Byrne (ME)
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
Preliminary Design Review 6:  Concept Revision  Chassis Design Senior Design: Team Burja ____________________________________________________________________________________________________________________________________________________________________
Senior Design: Validation of Design December 15, 2008.
Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME Walter Freitag - ME Jason Zion - ME Luis Garcia - EE IE MEEE.
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
Optical Stage Redesign Team 4025 Senior Design II – Spring
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
Project # Team Members: Maham Suleman, EE Anne Johnson, ME Joe Farnsworth, EE Josh Brown, ME Jerry Money, EE Sanh Ha, ME Jeffrey Miller, EE Faculty.
Team Hybrid Hoyt MemberSubsystem Sean Frost Electric motor, motor controller, charge controller, charge accumulators Dan Farley Hydraulics system: Pumps,
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
POWER STEERING SYSTEM IN AUTOMOBILE
Filename/###, #1 assured communications™ 28-Aug-15 What does an IE Do? An Industrial Engineer can study various fields which include: –Quality –Manufacturing.
Producing electricity  Electricity is a useful form of energy. It can easily be changed to other forms of energy.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Industrial Engineering Roles In Industry
ITX TCM Project Proposal SWEN670. Meet Team: “iTX TCM” Name: Eric Everson Angie Chock Thomas Andersen Thomas Stewart Role: Team Lead/PM Documentation.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Welcome to the Lassonde Design Club Promoting Design Skills and Practices.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Assembly Lines – Reliable Serial Systems
University of Connecticut MECHANICAL ENGINEERING Project Statement.
Course of MT- 362 Material Handling Lecture # 3.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Process Layout Chapter 7 July 20, 2005.
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Chapter 6 Facilities Layout.
1 Team Mieux Critical Design Review ASME Bulk Material Transporter AME 470 Ltd. December 7, 2004.
Rotating System Students: DINESH JOSHI RAJNISH VERMA RAMDEEN BISHNOI
Dynamometer Redesign and Build for Future RIT Automotive Laboratory Project Sponsored by: Mechanical Engineering Dept, Dave Hathaway and Mark Steinke.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Concept Review - P08001 Balance Training Bicycle Team Members Jennifer Zelasko - IE Carl Mangelsdorf - ME Jeff Tempest - ME James Nardo - ME Jon Bawas.
Process Layout Chapter #6.
Turbomachinery Flow Visualization P08453
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Kart² Progress Presentation
Tandem Bike Storage Proposal
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
Permanent Magnet Motor Modeling
Bonneville Power Administration Aerial Line Cart Progress Report
SENIOR DESIGN PROJECT P08455
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Wednesday, February 16, 4:00-6:00PM
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

Lightnin SPX Test Stand Aditya - Oriana - Don - Jesse - Ron - Dana - Geoff

2 Team Members Aditya Sanghi, IE Project Leader Geoffrey Cusano, ME Dana Harris, IE Ron Mendolera, EE Oriana Starr, ME Don Strong, ME Jesse Warner, EE

3 Project Overview Sponsor: Lightnin SPX Manufacture: pumps, mixers, valves, fittings, mills, heat exchangers, and process systems Gear reducer production moved to Rochester, NY from Wytheville, VA

4 Project Overview, cont. Six-month project: evaluate process inefficiencies & propose solutions  Constraints: time, cost, footprint & height  Avoid bottlenecks and hazardous workstations

5 700/800 Series Mixer Gear reducer

6 Process Flow Distance ~ 500 ft

7 Assembly Stand Side Front

8 Spin Test & Assembly Area

9 Torque Stand Side Front

10 Project Mission Statement The mission of the project with Lightnin SPX is to substantially improve the current cycle time of testing reducers while efficiently accommodating reducers of various sizes and configurations within the current assembly space available.

11 Needs Assessment Order Qualifiers & Winners  Cost to build SHALL NOT exceed $200,000  Return On Investment  Labor savings  Design software to be used: Inventor  Utilize existing equipment Scope  2-3 detailed concepts

12 Concept Development Level 0: Station setup Three Stations Two Stations One Station

13 Concept Development Transportation  Rail system, wheels, rotary arm, trolley, etc. Slave unit  Pump, two gears, electric generator, etc. Attachment of test unit to stand  Clamps, magnets, pins, bolts, etc.

14 Feasibility Assessment Level 0: Station Setups

15 Feasibility Assessment Level 1: Feasibility of station designs  Compare five designs based on the two best setup options  Included transportation options  Pugh’s Method resulted in 3 Feasible Preliminary Designs

16 Analysis - Option 1 Two Station Design Features  Assembly  Spin  Transport  Torque Advantages Disadvantages

17 Analysis - Option 2 All-in-One Lift and Rotate Features  Assembly  Spin  Transport Lift Forklift  Torque Advantages Disadvantages

18 Analysis - Option 2 All-in-One Lift and Rotate Features  Assembly  Spin  Transport Lift Forklift  Torque Advantages Disadvantages

19 Analysis – Option 3 All-in-One Assembly on Rails Features  Assembly  Spin  Transport  Torque Advantages Disadvantages

20 Future Plans - Senior Design II Analysis  FEMA  Time studies Software Analysis  FEA: ANSYS  Simulation: Arena  Ergonomics: 3DSSPP

21 Project Plan – Senior Design II

Questions ?