NGAO Controls Team Meeting August 29, 2008 Erik Johansson.

Slides:



Advertisements
Similar presentations
Object-Oriented Analysis and Design LECTURE 2: INCEPTION PHASE.
Advertisements

Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
AO Controls: Status and Issues Erik Johansson, Jimmy Johnson, Doug Morrison and Ed Wetherell NGAO PD Team Meeting #6 Thursday, March 19, 2009.
Requirements and Interfaces Erik Johansson and Chris Neyman NGAO PD Team Meeting #6 Thursday, March 19, 2009.
Trying to connect WBSs with people and phases Relevant questions to my work: How the realistic NGAO strategies will/should affect the work in progress?
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
NGAO Cost Estimation Guidelines Richard Dekany January 25, 2008.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
Operating Systems Review. User Computer, including HW and SW.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
0-1 Team 1 Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auto-Owners.
Chapter 5: Project Scope Management
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
WBS Non-RTC Controls Erik Johansson, Jason Chin, Don Gavel, Marc Reinig Oct 31 th, 2007.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Software projects Management & Development Alireza Saebi
Project Scope Management J. S. Chou, P.E., PhD.
Viking Project Team Assignment 5 K15T2 - Team 21 1/17/2012.
Task Analysis is Part of Planning Once we have completed planning on the deliverables and contents of the deliverables, we need to plan out “how to accomplish”
EMBA Project Scope Management J. S. Chou, P.E., PhD.
G.Chiozzi European Southern Observatory Trieste 04/10/1999 Icalepcs 99 Tutorial Use Cases for Requirements Capture and Tracing.
Lesson 7 Guide for Software Design Description (SDD)
CS101 Introduction to Computing Lecture SW Development Methodology.
Ivan Dontsov, Andy Phenix, Maureen Rottschaefer. Project Outline “The primary objective of this OMSE 2012 Practicum Project is to extend and refine the.
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Software Project Planning.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Resources Performance time Project Planning Phase : Generating Tasks & Identifying Responsibilities 1.
INFS 6225 Object-Oriented Systems Analysis & Design Chapter 11: Physical Architecture Layer Design.
Chapter 5: Project Scope Management Information Technology Project Management, Fourth Edition Scope Statement and WBS Thursday, February 15.
PRJ566 Project Planning & Management Work Breakdown Structure.
Request for Proposal (RFP)
SOFTWARE TECHNOLOGY GUIDE TWO. TG2.1 Introduction to Software Software a set of computer programs that enable the hardware to process data. Computer program.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
The 9 steps to successful project implementation From BD to Operations.
Project Task Planning 1 Concepts and Definitions Work Breakdown Structures.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Slide 1 What the business needs  How to build it Functional requirements  + Nonfunctional requirements Performance System environment issues Problem.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Team-Based Development ISYS321 Managing the Information Systems Project.
1 11/2004 – N.Campanis for MPUG Western NY Chapter Working Session Nick Campanis Presented to MPUG – Western NY Chapter Working Session November 10, 2004.
Systems Analysis and Design in a Changing World, 6th Edition 1 Chapter 6 - Essentials of Design an the Design Activities.
The Software Engineering Process Discussion Slides.
COT 4600 Operating Systems Fall 2010 Dan C. Marinescu Office: HEC 439 B Office hours: Tu-Th 3:30-4:30 PM.
T Project Review MTS [PP] Iteration
Chapter 11 Project Management.
Meeting Overview Architecture Document Interface Information Needed
ALMA Common Software Training-Course Session 4 - ACS Docs
NGAO System Design Project Plans and Schedule
The 9 steps to successful project implementation
CS101 Introduction to Computing Lecture 20 SW Development Methodology
The Software Engineering Process
TECHNOLOGY GUIDE TWO Software.
Presentation transcript:

NGAO Controls Team Meeting August 29, 2008 Erik Johansson

2 Agenda Finsh up Intro to AO Differences between NGAO and current AO System The NGAO Work Breakdown Structure Project Assignments Goals and deliverables for the Preliminary Design phase

3 The NGAO Work Breakdown Structure

4 Major Controls WBS Elements Control Systems Architecture Software Architecture 4.2 Opto-mechanical design (EW to assist with Motion Control) 4.4 Controls (Non-Real Time Controls) –AO Sequencer –AO Motion Control HW & SW –AO Device ControlHW & SW –Acquisition, Guiding & Offload control 5.5 Laser System Control –LS Sequencer –LS Motion Control HW & SW –LS Device Control HW & SW 6.1 Multi-Systems Command Sequencer 6.2 User Interfaces 6.4 Data server

5 PD Phase Deliverables Architecture documents –Overall Controls Architecture –Overall SW Architecture –Motion Control Architecture –Subsystem Architecture documents Interface Control Documents Use cases Functional Requirements Cost Estimates