Problem- 4 (Material & Labour) The following details relating to the product ‘X’ during the month March, 2011 are available. You are required to compute:

Slides:



Advertisements
Similar presentations
Chapter 14 Measuring and Assigning Costs for Income Statements
Advertisements

Accounting Presentation 4/29/2014
Standard costs and Variance analysis Unit 10 University of Sunderland Dr Vidya Kumar 1.
BPP UNIVERSITY COLLEGE BPP University College of Professional Studies Financial Performance- Revision session 4 th December 2012 BPP UNIVERSITY COLLEGE.
Problem – 10 (Profit Variance)(Factors contributing to change in profit) During , average prices increased over these of the previous year: i.20%
Problem – 12 (Variance) In standard Costing, certain “ratios” are used to illustrate effective use of the resources of the company. Define these ratios.
Standard Costing and Variance Analysis
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
ACTG 321 Agenda for Lecture 14
Using Variances under Standard Cost System
 Standard cost is the pre determined cost which determines in advance what each product or service should cost under given circumstances.
Standard costing.
Standard Costing and Variance Analysis
Flexible Budgets/Variances II Chapter Eight. Developing Budgeted Variable Overhead Allocation Rates Step 1: Choose the time period used to compute the.
Product Costing/Job Costing
VARIANCE ANALYSIS 1 LECTURE 8.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
Introduction Overhead costs are a major cost area for many organisations. Planning and control of overhead costs is an ongoing challenge to managers.
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Four: Information for planning, control and performance.
AFM Standard Costing & Variance Analysis Isuru Nadeesha Manawadu
Standard Costing & Variance Analysis!
Chapter 23 Flexible Budgets and Standard Cost Systems
Dr Gagan Pareek alias Dr Harish Pareek M.Com, A.I.C.W.A, PhD Area of Expertise : Accounting & Finance, Credit Risk Management.
(C) Ghanendra Fago (M Phil, MBA)1 Flexible Budgeting and overhead Variance By Ghanendra Fago.
1 MAKE OR BUY PARTS AND COMPONENT DECISION A manufacturing enterprise may produce products using various types of parts, components. All these parts have.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Factory Overhead Planned, Applied & Actual
Controlling Manufacturing Costs: Standard Costs
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Standard Costing and Variance Analysis
: Mrs. Kamlesh.  Standard cost is: A predetermined cost. Used for cost-control. And the technique is known as standard costing.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
FLEXIBLE BUDGET Pertemuan 8 dan 9 Matakuliah: > Tahun: >
Problem -1(Material) S. V. Ltd., manufactures by mixing three raw materials. For every batch of 100 kg of BXE, 125 kg of raw materials are used. In April.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Flexible Budgeting Chapter 07, 08
1 Brenda Mallouk Standard Costing I Management Accounting One.
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Performance Evaluation and Using Variances Chapter M6.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
STANDARD COSTING Setting Standard and Analyzing Variances Pertemuan 3, 4 dan 5 Matakuliah: > Tahun: >
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Flexible Budgets Static Budget Based on estimate of sales and production levels Compare costs associated with actual production to costs for budgeted production.
Chapter 17 Overhead Cost Management Flexible Budgets.
F5 Performance Management. 2 Section D: Standard Costing And Variance Analysis Designed to give you knowledge and application of: D1. Budgeting and standard.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & standard costing E2. Functional budgets E4. Basic.
Flexible Budgets/Variances I Chapter Seven. Static Budget Example Webb Co. manufactures and sells jackets. Budgeted variable costs per jacket are as follows:
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Standard costing.
Operating Budgets: Manufacturing Budgets
8 Chapter Variance analysis.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 11A Appendix 11A: Predetermined Overhead Rates and Overhead Analysis.
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 8A.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Performance Evaluation Using Variances from Standard Costs
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
Standard Costing and Variance Analysis
Cost accounting Session 7.
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

Problem- 4 (Material & Labour) The following details relating to the product ‘X’ during the month March, 2011 are available. You are required to compute: i.Material Price Variance. ii.Material Usage Variance. iii.Material Cost Variance iv.Labour Rate Variance. v.Labour Efficiency Variance. vi.Labour Cost Variance.

Contd… You are also required to reconcile the standard and actual cost with help of such variances. Standard Cost per unit: Material 50 ` 40 per kg. Labour 400 ` 1.00 per kg. Actual Cost for the month: Material 4,900 ` 42 per kg. Labour 39,600 ` 1.10 per kg. Actual production – 100 units

Problem -5 (Labour & Variable Overhead) The following information has been extracted from the books of Goru Enterprises which is using standard costing system: Actual output9,000 units Direct wages paid 1,10,000 hours at ` 22 per hour, of which 5,000 hours, being idle time, were not recorded in production Standard hours10 hours per unit Labour efficiency variance ` 3,75,000 (A) Standard variable overhead ` 150 per unit Actual variable overhead ` 16,00,000 You are required to calculate: (i) Idle time variance; (ii) Variable overhead expenditure variance; (iii) Total variable overhead variance and (iv) Variable overhead efficiency variance.

Problem -6 (Fixed Overheads) AKASH LTD. operates a system of Standard Costing. The company has normal monthly machine hour capacity of 100 machines working 8 hours per day for 25 working days in the month of April i.The Standard time required to manufacture one unit of products is 4 hours. The Budgeted fixed overhead was 1,50,000. ii.In the month of April 2014, the company actually worked for 24 days for average 750 machine – hours per day.

Contd… (iii)The Actual production was, 4,500 units, and the actual fixed overhead was 1,60,000. You are required to compute: A.Fixed overhead efficiency variance B.Fixed overhead capacity variance C.Fixed overhead calendar variance D.Fixed overhead expenditure variance E.Fixed overhead volume variance F.Fixed overhead cost variance.

Problem – 7 (Overheads) The following budget was prepared for the overhead of Department X: Budget for period Fixed overhead ` 5,600 Variable overhead ` 10,400 Machine hours1,600 Standard hours of production1,600 After the period the actual results were: Total overhead ` 17,400 Machine hours1,630 Standard hours produced1,590 You are required to calculate the overhead variances for the period.

Contd… At the end of the period, a price of ` 3.00 was agreed to have been an efficient buying price in the period. The standard costing system shows a direct material total variance of ` 8,800 made up of:- Material usage variance ` 2,000 (A) Material Price Variance ` 16,800 (A) Management wishes to distinguish between controllable and uncontrollable effects on performance.