Concrete and Masonry Construction 29 CFR 1926, Subpart Q.

Slides:



Advertisements
Similar presentations
Scissor Lift Safety Training
Advertisements

Heavy Concrete Construction Formwork
CONCRETE AND MASONRY CONSTRUCTION
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
We are reviewing Chapt. 1&2 and we assigned Chapt. 3 & 4 for
Subpart R Steel Erection
SCAFFOLD SAFETY.
5/1/2015OSHA Office of Training & Education 1. 5/1/2015OSHA Office of Training & Education 2 Subpart Q - Concrete & Masonry Construction ( )
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
OSHA Subpart Q Concrete and Masonry Construction.
FALL PROTECTION. What, me worry? According to the US DOL, falls are the leading cause of worker fatalities in the construction industry. On average, between.
Safe-Con, LLC Scaffold Safety Preview Safe-Con, LLC 5714 Merlin St. Madison, WI This is a preview of Safe-Con, LLC’s Scaffold.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Rev: Section 3 Framing Operations. Rev: Learning Objectives: Section 3 Understand when fall protection must be provided Evaluate the use.
GA Tech Safety and Health Consultation Program FALL PROTECTION.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Most Frequently Cited Serious Violations Construction – FY 2008.
What have we accomplished? STRENGTH OF MATERIALS
Which Standards might apply to these hazards
Fall Protection in the Roofing Industry
Safety for Working in High Places
Southeastern OSHA Training Institute Education Center Fall Prevention in the Construction Industry 29 CFR 1926: Subpart M.
Harwood Grant #46J6-HT13Southwest Safety Training Alliance Inc1 Module 2 Fall Hazards Did you know? Falls from elevation account for one third of all deaths.
Chapter 12 Concrete Construction Part 2 1CE 417, King Saud University.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Most Frequently Cited Serious Violations Construction – FY 2011 OSHA Federal Standards October 1, 2010 – September 30, 2011.
Competent Person for Construction. What is a “competent person?” v Capable of identifying Existing and predictable hazardsExisting and predictable hazards.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Competent Person for Construction. What is a “competent person?” Capable of identifyingCapable of identifying Existing and predictable hazardsExisting.
Copyright © Fall Protection, Subpart M.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
29 CFR PART 1926 Subpart M FALL PROTECTION 29 CFR PART 1926 Subpart M FALL PROTECTION HGS.
L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan.
Most Frequently Cited Serious Violations Construction – FY 2007.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Focus Four Fall Protection in Construction Focus Four Fall Protection.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Concrete & Masonry in Construction.
Struck-By Hazards. Crane Tip Over and Failure Incidents Soft Ground Inadequate outrigger support Overload Crane out of level Boom strike.
Most Frequently Cited Serious Violations Construction 2000.
Subpart Q - Concrete & Masonry Construction ( ) Reinforcing steel - Guarding Masonry walls - Bracing Masonry construction - Limited access.
GOVERNMENT ENGINEERING COLLEGE,VALSAD CIVIL ENGINEERING DEPARTMENT SHORING PREPARED BY – Shah Moxesh – Shah Sidharth
§1926 Subpart M Presented by: ETTA, OSH Division, Fall Protection in Construction.
This presentation was created by the N.C. Department of Labor for safety and health training. §1926 Subpart M Presented by: ETTA, OSH Division,
Concrete and Masonry in Construction
Excavation, Concrete, and Steel Erection OSHE 382, Spring 2016
Ladder Safety Training
Fall Protection for Construction
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Steel Erection 29 CFR 1926, Subpart R
Most Construction FY 2013 Frequently Cited Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Most Frequently Cited Serious Violations
Concrete and Masonry in Construction
Demolition 29 CFR 1926, Subpart T
Most Frequently Cited Serious Violations
Click anywhere to get started…
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Construction FY 2013 Frequently Cited Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Steel Erection 29 CFR 1926, Subpart R
Presentation transcript:

Concrete and Masonry Construction 29 CFR 1926, Subpart Q

General overview of the OSHA regulation  Definitions  General requirements Load placementLoad placement Impalement hazardsImpalement hazards Post-tensioning operationsPost-tensioning operations Concrete bucketsConcrete buckets  Hazards of working with concrete 1a

Equipment and Tools  Bulk cement storage Lockout/TagoutLockout/Tagout  Concrete mixers  Power concrete trowels  Concrete buggies 2a

Equipment and Tools  Concrete pumping systems  Tremies  Bull floats  Masonry Saws 2b

Cast-in-place concrete requirements  General requirements for formwork Support without failureSupport without failure Drawings and plansDrawings and plans 3a

Cast-in-place concrete requirements  Shoring and reshoring Inspection of equipmentInspection of equipment Damaged equipment strength requirementDamaged equipment strength requirement Inspection of erected equipmentInspection of erected equipment 3b

Cast-in-place concrete requirements  Shoring and reshoring Strength requirements after erectionStrength requirements after erection Firm contact and securityFirm contact and security Eccentric loadsEccentric loads Tiered single post shoresTiered single post shores Reshoring requirementsReshoring requirements 3c

Cast-in-place concrete requirements  Vertical slip forms Rods and pipesRods and pipes Form designForm design Scaffold workScaffold work 3d

Cast-in-place concrete requirements  Vertical slip forms Jacks, vertical support, and rated capacityJacks, vertical support, and rated capacity Holding devicesHolding devices Form structureForm structure Rate of liftRate of lift 3e

Cast-in-place concrete requirements  Reinforcing steel Rebar supportRebar support Rolled wire meshRolled wire mesh 3f

Cast-in-place concrete requirements  Formwork removal Conditions for removalConditions for removal Reshoring removalReshoring removal 3g

Precast concrete  Adequate support  Lifting inserts  Employee safety 4a

Lift-slab Operations  Professional design and plan Detailed instructions and sketchesDetailed instructions and sketches Lateral stabilityLateral stability 5a

Lift-slab Operations  Jacking equipment Load and overloadLoad and overload Equipment includesEquipment includes  Protection of employees 5b

Masonry construction requirements  Limited access zone requirements DimensionsDimensions PlacementPlacement Restricted areaRestricted area Requirements for removingRequirements for removing 6a