TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.

Slides:



Advertisements
Similar presentations
EMU Peripheral Backplane. Timing with the CCB’2004 M.Matveev Rice University April 26, 2004.
Advertisements

US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Track Fitting and Comparator Results Emu UC Davis Feb. 26, 2005 Yangheng Zheng University of California, Los Angeles  Motivation & Introduction.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
EMU DAQ MotherBoard Jianhui Gu The Ohio State University ESR, CERN, November 2003.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
1 The TrackFinder GUI D. Acosta, L. Gray, N. Park, H. Stöck University of Florida.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
904 Status Recall last Group Meeting…
Timing/Synchronization Status
CSC Synchronization Procedure and Plans
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
University of California Los Angeles
TMB and RAT Status Report
University of California Los Angeles
Configuring the Peripheral Crates
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Plans for the 2004 CSC Beam Test
Presentation transcript:

TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los Angeles  TMB-RAT related Peripheral Crate control software update  Plan

08/16/2004 Slice Test University 2 Software update after April Emu meeting  Frank created a “tmbtiming” module in PCC for timing in the TMBs (used in May beam test)  Add RAT module XML configuration variable (Thanks to Alex and Rick)  Update trigger modes in TMB/CCB class (ALCT and CLCT self triggering modes added)  Add ALCT and TMB (online/offline) CRC check routines in ALCT/TMB class  Add CFEB/AFEB pulse pattern injector functions in “tmbtiming” module. (Thanks to Jianhui)

08/16/2004 Slice Test University 3 tmbtiming module  April-May features:  TMB/CFEB delay constants  TMB tx/rx delay constants  TMB scope data for adjusting ALCT and CLCT matching window and delay  Recent additions:  ALCT/TMB online/offline CRC checks (can check raw hit data before DDU )  CFEB pulse pattern injector  AFEB pulse pattern injector

08/16/2004 Slice Test University 4 CFEB/AFEB injectors : Why?  Without turning on the gas and HV system for the chamber, you can  debug the TMB-RAT system (maybe other system),  test CFEB and ALCT cable connections,  get TMB and ALCT delay timing constants in a fast way,  simulate the single muon, cosmic ray or test beam patterns …

08/16/2004 Slice Test University 5 CFEB pulse pattern injector  Generate half-strip patterns for all strips  Control sequence: tmbtiming module  DMB registers  CFEB buckeye chips  pulses on strips  CFEB pulse are well-determined charges.  Input: half-strip patterns for buckeye chips; output: CLCTs  CLCTs generating rate: buckeye rate

08/16/2004 Slice Test University 6 CFEB pulse pattern injector (cont.)

08/16/2004 Slice Test University 7 AFEB pulse pattern injector  Generate ALCT patterns  Control sequence: tmbtiming module  CCB registers  TMB registers  ALCT registers  pulses on cathode test strips (1 strip/layer)  CCB provides 500ns gate to enable the ALCT testing pulses  capacitive coupling between test strips and anode wire groups  hot wire mask on ALCT board  ALCT patterns

08/16/2004 Slice Test University 8 AFEB pulse pattern injector (cont.)  Input: key wire group number; output: ALCT pattern  ALCTs generating rate:  computer instructions rate

08/16/2004 Slice Test University 9 AFEB pulse pattern injector (cont. )

08/16/2004 Slice Test University 10 What’s next  Improve the user interface for CFEB/AFEB pulse pattern injectors (create a new class?)  Get TMB and ALCT timing constants directly from CFEB/AFEB pulse pattern injectors in a fast way  Create the simulators for single muon, cosmic ray and test beam using injectors