MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.

Slides:



Advertisements
Similar presentations
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
The MICE Target Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE MICE Target Status P J Smith CM 25 Wed 4 th November 2009.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Electronics & DAQ P J Smith University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
Construction and Installation of the CLIC Experimental Area
MICE Target Mechanical Design l Jason Tarrant – STFC »Working on upgrade of Target Mechanics l Contents »Main features of upgrade design »Progress & schedule.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
MICE Target l Jason Tarrant – STFC l Investigative work on T2 with plastic bearings »Stopped after >2 million cycles »Disassembly with photographic investigation.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Contents »Shaft Bearing Redesign –Cross section shape –Anti-rotation device and location.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
MICE Target Mechanical Design
MICE Target Report Video Conference 29/11/07
TSF Upgrade Project Overview Resources Plans and Timetable
Presentation transcript:

MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009

Chris BoothUniversity of Sheffield 2 New MICE Targets Major redesign of: Shaft Stator housing Control system Ancillaries (gate valve etc) Some delays: Materials Companies capable of accurate machining Now resolved Weekly target phone meetings (Sheffield, Imperial, RAL, Oxford). Target workshop (at Imperial) tomorrow.

Chris BoothUniversity of Sheffield 3 New MICE Targets Critical item: target shaft Design completed Tubular lower plus cylindrical upper sections  needs welded joint –Tests successful Features (inc. alignment flat) need machining –High quality surface finish; accurate straightness. –Company identified & contracted. Two different designs for the “join” –(Welding, heat-treatment, grinding) –Will produce ~6 of each and select best.

Chris BoothUniversity of Sheffield 4 Construction Schedule Shafts:Both designs, manufacturing complete by 22 nd June DLC coating by 3 rd July Sign off7 th July Bearings:Complete by 17 th June DLC coat, sign off1 st July Stators:Coil assembly on temporary former. 1 complete in Sheffield. Parts ready for second. Vacuum tubes duenext week Fit coils, cooling jacket; stator to RAL21 st May Core components manufactured, at RAL27 th May Assemble, weld, test19 th June Two complete target assemblies ready for installationend July (For details, see Jason Tarrant.)

Chris BoothUniversity of Sheffield 5 Installation & Commissioning Schedule (Draft! To be discussed tomorrow!) Early August (1 week): Assemble Target1: Core (stator), shaft, optics, bellows in clean area at RAL. Install in R78. Add optical, electrical, water connections. Run for ≤ 1 week (How many pulses??) Infrastructure planning – finalise tomorrow. In parallel, assemble Target2. Install Target2 in R78. Run as demonstrator. Transfer Target1 to ISIS, install in August shutdown.

Chris BoothUniversity of Sheffield 6 Target Control System First phase is to duplicate present functionality using FPGA sytem, with PC-based user interface accessed over USB. Development underway (Sheffield/IC) Duplicate interface boards (copies of present system) complete. –Incurred slight delay. VHDL framework almost complete. FPGA interface PCBs under test. Firmware nearly complete. Should be ready for end July, for test and installation in ISIS. Existing system (in MICE LCR) is an acceptable short-term fallback.