Lap-Band Test Stand P9042

Slides:



Advertisements
Similar presentations
Using C1V1=C2V2.
Advertisements

11/10/2008 Airframe Measurements P09233 Michael
P09233 Flight Parameter Measurements Michael Skube & James Hunt P09233
Automation/Improvement of Packaging on Cookie Line Project Manager: Stephanie Rager (IE) Chief Engineer: Bruno Coelho (ME), Members: Brian Duffy (EE),
Circuit Breakers Wireless USB Keyboard Proposal Presentation EE396.
EDGE™ Project P09122: MAV Control System Erik Bellandi - ME Ben Wager - ME Garrett Argenna - ME Tahar Allag - EE Michael Pepen - EE Stephen Nichols - CE.
Automation/Improvement of Packaging on Cookie Line Project Manager: Stephanie Rager (IE) Chief Engineer: Bruno Coelho (ME), Members: Brian Duffy (EE),
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Multidisciplinary Engineering Senior Design Project Self-Triggered Tempo Meter Preliminary Design Review 02/24/06 Team Members: John Gifford (EE)
Team 9: Maestro Team Members: Gi Jung Park Michael Overstreet Maladau Mou William McHenry.
EDGE™ Project Overview Presentation P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME),
Quality Assurance Initiative. What is it anyway? The Quality Assurance (QA) Initiative is a faculty-centered, peer review process designed to assess the.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
FINAL DESIGN: To make our design “Universal” any sensor that uses the standard 4-20mA Output or any T-type thermocouple may be used. SOLIDWORKS CAD FINAL.
+ Group members 1. Ahmed Al-Toukhy 2. Amir Ahmed 3. Ahmad Ashanani Mobile Clicker.
Leakage Current Detection System for Insulated Boom Trucks Team: Josh Struble (EE) Eli Forney (EE) Chris Hulsebus (EE) Lynn Nguyen (EE) Advisors: Glen.
SDP11-Team Gong-“Wait Watchers” PDR Matheus Barros (EE) - Alex Gutowski (EE) - Steven Mitchell (EE) Preliminary Design Review Professor Weibo Gong Team.
NDIA Small Business Division Subcommittee on Improving IP Protection for Small Businesses Mission Statement Overview Alison Brown.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Centrifugal Pump Performance Experiment Presented by: Steven King ME 498 Senior lab November 16, 2004.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Hearing Aid Isolation Chamber Design Review Presentation 04/28/10 SLAC.
Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.
Self-Adjusting Gastric Banding System Erin Crosby Andrew Dickerman Josh Mabasa Brian Reis.
A growing problem with university classrooms is the inability to effectively and efficiently record classroom attendance. The solution to this problem.
Intro to Ecology (The last unit of the year!!). What Is Ecology?
Due Today: Density Part 2 Pre-Lab Homework: 1. Density Short Report 2. Empirical Formula Pre Lab DENSITY PART II.
PM-Appers! Presents: 5 Things to Consider When Searching for a Project Portfolio Management Application.
Working Capital - > 90 Day Delinquency Project – Heath Peacock Finance Tempe, AZ - CCC.
Self-Adjusting Gastric Banding System Erin Crosby Andrew Dickerman Joshua Mabasa Brian Reis.
Measurable Milestones END-PRODUCT DESCRIPTION The bed monitor system helps prevent injury by predicting when an individual is attempting to leave the bed.
DMAIC: Measure Robert Setaputra.
TechOrchard Phil Poje, CEO. Benefits and Risks Data Breaches BYOD Mobile Device Management.
W exford Innovations Date Design Thinking | innovation E.H.O.V.E Experience.
EE/CS 480/481 12/12/ :16:40 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
Presented by:. Agenda Overview– what is Instant Challenge? Types of problems: Performance w/ props Performance w/o props Task based Key concepts to perform.
Bacterial Identification Using Confocal Raman Spectroscopy Kevin Smith, Brian Cox Advisors: Dr. Mahadevan-Jansen Chad Lieber.
PDR ECE 415 Team Advisor: Professor Marinos Vouvakis Douglas Imbier EE Team Leader Edmons Zongo EE Treasurer Nicholas Ferrero EE Website Administrator.
Week 1: Project Overview Customer: Debbie Conway Guide: Brian Thorn P09453.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
Collecting Evidence Introduction to Measurement Chemistry and Physics of Forensics.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
P P09042 : Lap Band Test Stand Ilya RivkinTeam Lead(EE) John MatrachisiaLead Engineer (ME) Michael BatykoMechanical Engineer Kevin SandoMechanical.
Enterprise Security Management Franklin Tinsley COSC 481.
Stepping stones Equipment
Healthy Change Rewards Program.
Component Functionality
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
BACK SOLUTION:
Building the BEST Structure Challenge
Membrane Characterization Test Stand
Warm Up 1. 4 – 2x = 14 Solve each equation x is being: Inverse a. a.
METRIC VOLUME.
Airframe Measurements P09233
Georgianna Strode Institute of Science and Public Affairs
Words and Music by John Riggio • MUSIC K-8, Volume 20, Number 5
CSE 498, Collaborative Design
Heart Pump and the Circulatory System P17080
Basic Design Documentation
P09029: Robotic Hand Improvement Senior Design I: Winter 2008
POWER CHALLENGES Several Ways To Solve 7 CHALLENGES.
Lester Packer, Stefan U. Weber  Journal of Investigative Dermatology 
Warm Up Solve each equation 1. 2x + 4 = – 2x = 14.
Add an e to the end. Change the m to an s. What did you make?
CLOUD PARTNER PANEL Mark Miller General Manager Michael Salmon
Lap-Band® Test Stand P09042 Objective:
Project Team & Major Aaron Phipps – ME (team lead)
Lap-Band® Test Stand P09042 Objective:
Optical Stage Redesign
Team 6: Healthnet Embedded Systems Design
Presentation transcript:

Lap-Band Test Stand P9042

Team Members Michael Batyko – ME John Matrachisia – ME Ilya Rivkin - EE Kevin Sando - ME Brian Weber - EE

Project Overview Develop a test stand for the Lap-Band device that can:  Measure force/pressure applied to stomach.  Measure/control amount of saline solution in device.  Collect data

Key Challenges Identifying a material to mimic the physical properties of the upper stomach. Measuring the force/pressure applied to stomach by Lap-Band Device. Finding a way to accurately meter amount of saline solution in Lap-Band Device. Integrate components into test stand and obtain test data correlating saline volume to force/pressure on stomach.