Pg 1 Why Learn About SIPOC And Process Maps? Document actual high level process Clarify customers, suppliers, inputs, and outputs Communicate information.

Slides:



Advertisements
Similar presentations
Lean Six Sigma Green Belt Training
Advertisements

TECH Project Company X Documentation Plan Champion/Define Phase
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
ISO 9001:2000 Certified Next Steps? Where do we go from here?
Implementation: SLA & SOP Processes Purpose Strategy Foundation We Deliver Competitive Advantage to our Customer's Global Supply Chain.
Six Sigma Quality Engineering
Project Scope Management
Presented By The University of Texas-School of Public Health
Six Sigma Foundations Continuous Improvement Training
1 Chapter 3 Project Organization, Selection, and Definition.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Process Mapping.
SIPOC.
Voice of the Customer (Part of the Project Preparation Phase)
Overview of Lean Six Sigma
Overview of DMAIC A Systematic Framework for Problem Solving
MOHAMAD SHARIF B ISHAK B
Process Mapping - SIPOC
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
Paresh Naik December 3, 2004 STC India’s 6 th Annual Conference Using DFSS Tools for Better Technical Writing Processes and Deliverables
Capability Assessment Process
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Resources Performance time. resources Performance time 2.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Items Required for Process Hand-off
Managing Risk in the Supply Chain Kimball Bullington, Ph.D., P.E. Professor Middle Tennessee State University Kimball E. Bullington.
Practical Assessment Project Template
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Copyright © Six Sigma Academy International LLC All Rights Reserved Introduction To Measure.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
Lean Six Sigma Project Briefing Type Briefer Organization Here
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
1 LSSG Green Belt Training Improve: How do we get there?
Version 10.0  The High Performance Organisation Ltd Creating A Process Based Management System 1 Welcome Creating a Process Based Management.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Collections Accountability Leases that Terminate into Term Code TMDCR Tom Merry October 23, 2003 Week 4 Presentation.
Key Performance Indicators will: Provide performance measurements for all core processes. Add value for our customers and the company. Support company.
Information Technology Project Management, Seventh Edition.
Practical Assessment Project Template
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template
Lean Six Sigma Road Map Improvement Process Road Map
Control Phase Wrap Up and Action Items
Six-Sigma : DMAIC Cycle & Application
Practical Assessment Project Template
OPS/571 Operations Management
Presented By: <Names> <Team Name> <Date>
Quality Management Six Sigma
Process Definition Worksheet Objective : To specifically define the scope of the process being studied Process Name: The Process Starts with: The Process.
DMAIC Analyze, Improve, Control
CLINICAL INFORMATION SYSTEM
Project Champion: Process Owner: Organization: Project Location:
Six Sigma Foundations Continuous Improvement Training
Certification Resources Workbook
Measure Phase Wrap Up and Action Items
Practical Assessment Project Template – REV. 5.2
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Practical Assessment Project Template – DMADV
Presentation transcript:

Pg 1 Why Learn About SIPOC And Process Maps? Document actual high level process Clarify customers, suppliers, inputs, and outputs Communicate information Train employees on process Helps to identify and prevent defects from occurring.

Pg 2 Other Definitions Input:Material/information entering process and is transformed Output:Product or service resulting from transformed inputs Operation:Action which transforms inputs Process Boundary:Limits which define project scope Supplier:Provider of inputs Customer:Receiver of outputs Process terminology is simple, but very important.

Pg 3 What Is A SIPOC Process Map? Visual display of high level process Used in all DMAIC phases – Define/Measure phase – Project scoping – Analyze phase – Identify potential Critical Xs – Improve phase – Revised map – Control phase – Training SIPOC maps can be used on ANY process and is a LIVING document.

Pg 4 Levels Of A Process Core Process Detailed process Business Process (“Strategic”) Business Processes High Level Process Map (SIPOC) Detailed Process Map Business Development SalesUnderwritingContracting Customer Service TermsDocsNegotiateClose UnderwritersCustomers (external) Service Dept. (internal) Customer Supplier Mapping can be done at several levels.

Pg 5 SIPOC – High-level Map Major tasks and activities Boundaries of process Output variables and who receives outputs (customers) Customer requirements of outputs Input variables and who supplies inputs (suppliers) Process requirements of inputs SIPOC identifies Suppliers, Inputs, Process, Outputs, and Customers.

Pg 6 Why Use SIPOC? Identify and balance competing requirements Identify “gaps” Verify team and information resource requirements Drive Process Owners to use and continuously verify proper metrics with customers and suppliers Documenting a process from suppliers to customers.

Pg 7 Basic Structure Of SIPOC SIPOC Requirements SuppliersInputsOutputs Customers Input BoundaryOutput Boundary Process SIPOC is a one-page visual of entire process.

Pg 8 SIPOC Form Guide Support File: SIPOC.xls Left side of form is independent from right side. Requirements (Receiver of deliverable from process) (Deliverables from process) (Top level description of activity) (Resources required by process) (Providers of required resources) ProcessSuppliers 4 Who is Customer of each output? Boundary 6 What Inputs are required to enable this process to occur? 8 What does process expect from each input? 1 What is the process? 3 What are the outputs from process? 5 What does each Customer expect from each output? 2 When does process start? 2 When does process end? 7 Who is supplier of each input? Inputs Outputs Customers

Pg 9 Exercise With the facilitator, prepare a SIPOC on launching the catapult.

Pg 10 S Supplier I Input P Process O Output C Customer Branch Personnel Prospect Coordinator New Account Advisor Phone call Fax Account data base Siebel file Evaluate lead Load Siebel Contact customer Complete profile Account profile form Closed lead – No account Closed lead – No contact Outside Customer Branch Personnel Series 8 Manager Account Maintenance team Problem Statement In 2003, associate has received 342 leads through the branch referral program. Of these, 340 were deemed eligible and loaded into the call campaign bucket. We had a 59% contact rate, while 12% were swept with no attempt. For accounts contacted, we had a 69% conversion rate. Of these 28% were contacted within 72 hours. Example: SIPOC

Pg 11 Linkages Inputs from: CT Tree VOC Team Customer Suppliers Results to: Cause and Effects Matrix Failure Mode Effects Analysis (FMEA) Data Collection Plan Multi-vari Studies Control Plan Summary SIPOC maps are key tools in Six Sigma projects.

Pg 12 Session Summary SIPOC maps document actual processes Actual processes must be understood by project team, Process Owner, Champion, and stakeholders SIPOC maps show customers, suppliers, inputs, and outputs SIPOCs lay foundation for many other tools SIPOC maps serve many project needs.