1 Lecture 4 MGMT 650 Network Models – Shortest Path Project Scheduling Forecasting.

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Project Scheduling: PERT/CPM
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
CHAPTER 17 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Inventory Models – Chapter 11
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Project Management Techniques.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
1 Lecture 2 Decision Theory Chapter 5S. 2  Certainty - Environment in which relevant parameters have known values  Risk - Environment in which certain.
CHAPTER 3 Forecasting.
Lecture 3 Forecasting CT – Chapter 3.
Lecture 4 Project Management Chapter 17.
1 Project Management Chapter 17 Lecture 5. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives  Why.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Chapter 6 Forecasting n Quantitative Approaches to Forecasting n Components of a Time Series.
Slides by John Loucks St. Edward’s University.
Project Management Chapter 17.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
The Importance of Forecasting in POM
CHAPTER 3 FORECASTING.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
3-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
3-1Forecasting. 3-2Forecasting FORECAST:  A statement about the future value of a variable of interest such as demand.  Forecasts affect decisions and.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
PROJECT MANAGEMENT Approaches
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
1 1 Chapter 6 Forecasting n Quantitative Approaches to Forecasting n The Components of a Time Series n Measures of Forecast Accuracy n Using Smoothing.
3-1Forecasting CHAPTER 3 Forecasting McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Forecasting Production and Operations Management 3-1.
PROJECT MANAGEMENT.
Project Management (專案管理)
PROJECT MANAGEMENT WITH CPM/PERT.
Stevenson 17 Project Management.
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

1 Lecture 4 MGMT 650 Network Models – Shortest Path Project Scheduling Forecasting

2 Shortest Path Problem  Belongs to class of problems typically known as network flow models  What is the “best way” to traverse a network to get from one point to another as cheaply as possible?  Network consists of nodes and arcs  For example, consider a transportation network  Nodes represent cities  Arcs represent travel distances between cities  Criterion to be minimized in the shortest path problem not limited to distance  Other criteria include time and cost

3 Example: Shortest Route  Find the Shortest Route From Node 1 to All Other Nodes in the Network:

4 Management Scientist Input

5 Example Solution Summary Node Minimum Distance Shortest Route

6 Applications  Stand alone applications  Emergency vehicle routing  Urban traffic planning  Telecommunications  Sub-problems in more complex settings  Allocating inspection effort in a production line  Scheduling operations  Optimal equipment replacement policies  Personnel planning problem

7 Optimal Equipment Replacement Policy  The Erie County Medical Center allocates a portion of its budget to purchase newer and more advanced x-ray machines at the beginning of each year.  As machines age, they break down more frequently and maintenance costs tend to increase.  Furthermore salvage values decrease.  Determine the optimal replacement policy for ECMC  that minimizes the total cost of buying, selling and operating the machine over a planning horizon of 5 years,  such that at least one x-ray machine must be in service at all times. YearPurchase Cost (`000) AgeMaintenance cost (`000) Salvage value (`000)

8 Project Scheduling Chapter 10 Lecture 4

9 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives  Why is it used?  Special needs  Pressures for new or improves products or services  Definition of a project  Unique, one-time sequence of activities designed to accomplish a specific set of objectives in a limited time frame

10 Project Scheduling: PERT/CPM  Project Scheduling with Known Activity Times  Project Scheduling with Uncertain Activity Times

11 PERT/CPM  PERT  Program Evaluation and Review Technique  CPM  Critical Path Method  PERT and CPM have been used to plan, schedule, and control a wide variety of projects:  R&D of new products and processes  Construction of buildings and highways  Maintenance of large and complex equipment  Design and installation of new systems

12 PERT/CPM  PERT/CPM is used to plan the scheduling of individual activities that make up a project.  Projects may have as many as several thousand activities.  A complicating factor in carrying out the activities is that some activities depend on the completion of other activities before they can be started.

13 PERT/CPM  Project managers rely on PERT/CPM to help them answer questions such as:  What is the total time to complete the project?  What are the scheduled start and finish dates for each specific activity?  Which activities are critical?  must be completed exactly as scheduled to keep the project on schedule?  How long can non-critical activities be delayed  before they cause an increase in the project completion time?

14 Project Network  Project network  constructed to model the precedence of the activities.  Nodes represent activities  Arcs represent precedence relationships of the activities  Critical path for the network  a path consisting of activities with zero slack

15 Planning and Scheduling Locate new facilities Interview staff Hire and train staff Select and order furniture Remodel and install phones Furniture setup Move in/startup Activity

16 Project Network – An Example A B C E F Locate facilities Order furniture Furniture setup Interview Remodel Move in D Hire and train GS 8 weeks 6 weeks 3 weeks 4 weeks 9 weeks 11 weeks 1 week

17 Management Scientist Solution Critical Path

18  Three-time estimate approach  the time to complete an activity assumed to follow a Beta distribution  An activity’s mean completion time is: t = (a + 4m + b)/6  a = the optimistic completion time estimate  b = the pessimistic completion time estimate  m = the most likely completion time estimate  An activity’s completion time variance is  2 = (( b - a )/6) 2 Uncertain Activity Times

19 Uncertain Activity Times  In the three-time estimate approach, the critical path is determined as if the mean times for the activities were fixed times.  The overall project completion time is assumed to have a normal distribution  with mean equal to the sum of the means along the critical path, and  variance equal to the sum of the variances along the critical path.

20 Activity Immediate Predecessor Optimistic Time (a) Most Likely Time (m) Pessimistic Time (b) A--468 B CA333 DA456 EA FB,C345 G HE,F567 I 258 JD,H KG,I357Example

21 Management Scientist Solution

22  Network activities  ES: early start  EF: early finish  LS: late start  LF: late finish  Used to determine  Expected project duration  Slack time  Critical path Key Terminology

23 Immediate Completion Immediate Completion Activity Description Predecessors Time (wks) Activity Description Predecessors Time (wks) A Overhaul machine I A Overhaul machine I B Adjust machine I A 3 B Adjust machine I A 3 C Overhaul machine II C Overhaul machine II D Adjust machine II C 3 D Adjust machine II C 3 E Test system B,D 2 E Test system B,D 2 Example: Two Machine Maintenance Project Start A07707A07707 C06617C06617 B D E

24 Normal Costs and Crash Costs Activity Normal Time Normal Cost ($) Crash Time Crash Cost ($) Maximum Reduction in Time Crash Cost per day ($) A Overhaul Machine I ( )/3 = 100 B Adjust machine I C Overhaul Machine II D Adjust machine II E Test System

25 Linear Program for Minimum-Cost Crashing Let: X i = earliest finish time for activity i Y i = the amount of time activity i is crashed 10 variables, 12 constraints Crash activity A by 2 days Crash activity D by 1 day Crash cost = = $350 Crash activity A by 1 day Crash activity E by 1 day Crash cost = = $350

26 Lecture 4 Forecasting Chapter 16

27 Forecasting - Topics  Quantitative Approaches to Forecasting  The Components of a Time Series  Measures of Forecast Accuracy  Using Smoothing Methods in Forecasting  Using Trend Projection in Forecasting

28 Time Series Forecasts  Trend - long-term movement in data  Seasonality - short-term regular variations in data  Cycle – wavelike variations of more than one year’s duration  Irregular variations - caused by unusual circumstances

29 Forecast Variations Trend Irregular variatio n Seasonal variations Cycles

30 Smoothing/Averaging Methods  Used in cases in which the time series is fairly stable and has no significant trend, seasonal, or cyclical effects  Purpose of averaging - to smooth out the irregular components of the time series.  Four common smoothing/averaging methods are:  Moving averages  Weighted moving averages  Exponential smoothing

31 n Sales of gasoline for the past 12 weeks at your local Chevron (in ‘000 gallons). If the dealer uses a 3- period moving average to forecast sales, what is the forecast for Week 13? Example of Moving Average n Past Sales Week Sales Week Sales Week Sales Week Sales

32 Management Scientist Solutions MA(3) for period 4 = ( )/3 = 19 Forecast error for period 3 = Actual – Forecast = 23 – 19 = 4

33 MA(5) versus MA(3)

34 Exponential Smoothing Premise - The most recent observations might have the highest predictive value.  Therefore, we should give more weight to the more recent time periods when forecasting. F t+1 = F t +  ( A t - F t ), Formula 16.3

35 Linear Trend Equation  F t = Forecast for period t  t = Specified number of time periods  a = Value of F t at t = 0  b = Slope of the line F t = a + bt t FtFt a Suitable for time series data that exhibit a long term linear trend

36 Linear Trend Example F11 = (11) = 32.5 Linear trend equation Sale increases every time 1.1 units

37 Actual vs Forecast Linear Trend Example Week Actual/Forecasted sales Actual Forecast F(t) = t

38 Measure of Forecast Accuracy  MSE = Mean Squared Error

39 Forecasting with Trends and Seasonal Components – An Example  Business at Terry's Tie Shop can be viewed as falling into three distinct seasons: (1) Christmas (November-December); (2) Father's Day (late May - mid-June); and (3) all other times.  Average weekly sales ($) during each of the three seasons during the past four years are known and given below.  Determine a forecast for the average weekly sales in year 5 for each of the three seasons. Year Season

40 Management Scientist Solutions

41 Interpretation of Seasonal Indices  Seasonal index for season 2 (Father’s Day) =  Means that the sale value of ties during season 2 is 23.6% higher than the average sale value over the year  Seasonal index for season 3 (all other times) =  Means that the sale value of ties during season 3 is 41.4% lower than the average sale value over the year